FM Area Diversion International Legislators Forum June 27, 2014

FM Area Diversion International Legislators Forum June 27, 2014. Keith Berndt PE Cass County ND Administrator. Red River Basin. Total Drainage Area: 45,000 square miles. Fargo, ND. Moorhead, MN. Baldhill Dam. Valley City. Maple River Dam. Lisbon. Orwell Dam.

vachel
Download Presentation

FM Area Diversion International Legislators Forum June 27, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FM Area DiversionInternational Legislators ForumJune 27, 2014 Keith Berndt PE Cass County ND Administrator

  2. Red River Basin Total Drainage Area: 45,000 square miles Fargo, ND Moorhead, MN Baldhill Dam Valley City Maple River Dam Lisbon Orwell Dam Q 100 year = 34,700 cfs Q 500 year = 61,700 cfs Q max 2009 = 29,500 cfs White Rock Dam North Dakota South Dakota Minnesota

  3. Red River Flooding History • Red River Flood Stage = 18 feet on the Fargo gage at 13th Ave. S. • Exceeded in 50 of the past 111 years • Exceeded 20 of the last 21 years • Catastrophic damages have been prevented by emergency measures • 8 of the 16 “major” floods on record have occurred since 2000 • 2009 was the flood of record • Stage of 40.8 feet • 2-percent chance (50 year) event • Emergency measures cost approximately $70M 2009 Flood Expedited Feasibility Study

  4. Water Everywhere

  5. Commuting Challenges Interstate 29 Closed April 10. Reopened April 15, 2011. Detour added = 22.8 miles

  6. A willing workforce heeds the call 2009

  7. Volunteers fill the Fargodome Building is 466,000 SF.

  8. Lines of Defense Take Shape

  9. FM Area Diversion Project • 1,600 ft wide Diversion Channel in ND with 150,000 acre-feet of Upstream Staging • Outlet near Georgetown, MN • Inlet north of Oxbow, ND • Provides 1-percent (100-year) Risk Reduction • Reduces 1-percent event by >5’ • Extreme Events are Flood- Fightable

  10. FM Diversion Economics 1 in 5 of all North Dakotans will benefit from flood risk reduction $14 Billion = Property Value Receiving Flood Risk Reduction Benefits $4.3 Billion = Wages in the F-M Metro Area $10 Billion = Annual F-M Gross Domestic Product $200 Million = Annual Income & Sales Taxes Generated for North Dakota from F-M Metro $71 Million = Annual Income & Sales Taxes Generated for Minnesota from F-M Metro

  11. Diversion Channel Cross Section (Reach 1) Total Width = 1,600 feet

  12. JUNE 10, 2014 NEWS FLASH! PRESIDENT OMAMA AUTHORIZED FM AREA DIVERSION PROJECT CONSTRUCTION

  13. Overall Funding Approach • $100M • MN • $450M • ND State • $800M* • $1,000M • $450M • ND Local • Federal Cost Share • Non-Federal Cost Share • *WRRDA Authorized $846 Million

  14. Ongoing Efforts Working with upstream interests Additional upstream storage opportunities Cemetery mitigation Oxbow, Hickson, Bakke Levee Construction Fargo Levees Land Acquisition Design

  15. www.fmdiversion.com www.fmdiversion.com