1 / 53

SINKRONISASI PERENCANAAN PEMBANGUNAN KAWASAN TIMUR INDONESIA DALAM RPJM TAHUN 2010 – 2014

SINKRONISASI PERENCANAAN PEMBANGUNAN KAWASAN TIMUR INDONESIA DALAM RPJM TAHUN 2010 – 2014 SEKTOR ENERGI DAN SUMBER DAYA MINERAL. Makasar , 16 November 2009. DAFTAR ISI. PERAN SEKTOR ENERGI DAN SUMBER DAYA MINERAL POTENSI ENERGI DAN MINERAL NASIONAL KEBIJAKAN ENERGI DAN MINERAL

uyen
Download Presentation

SINKRONISASI PERENCANAAN PEMBANGUNAN KAWASAN TIMUR INDONESIA DALAM RPJM TAHUN 2010 – 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SINKRONISASI PERENCANAAN PEMBANGUNAN KAWASAN TIMUR INDONESIA DALAM RPJM TAHUN 2010 – 2014 SEKTOR ENERGI DAN SUMBER DAYA MINERAL Makasar , 16 November 2009

  2. DAFTAR ISI PERAN SEKTOR ENERGI DAN SUMBER DAYA MINERAL POTENSI ENERGI DAN MINERAL NASIONAL KEBIJAKAN ENERGI DAN MINERAL RENCANA KE DEPAN STRATEGI

  3. I. PERAN SEKTOR ENERGI DAN SUMBER DAYA MINERAL

  4. PERAN DAN KINERJA SEKTOR ESDM Neraca Perdagangan Pembangunan Daerah Sumber Penerimaan Negara Investasi Pembangunan Nasional Perekonomian Indonesia Subsidi Fiskal Moneter Sektor Riil Energi & Bahan Baku Domestik Efek Berantai/ Ketenaga- kerjaan Faktor Dominan IHSG

  5. Catatan:Diolah dari laporan BPS dan Bank Indonesia KONTRIBUSI SEKTOR ESDM TERHADAP PENERIMAAN NASIONAL Miliar Rp. 2008 (Triliun)

  6. KONTRIBUSI SEKTOR ESDM DALAM PEMBANGUNAN DAERAH LISTRIK PEDESAAN KEAGAMAAN 2.166 1.734 PENDIDIKAN KESEHATAN 1.149 918 615 BIMBINGAN MASYARAKAT DALAM PENGELOLAAN SUMUR TUA DANA BAGI HASIL COMDEV/CSR KEGIATAN ESDM

  7. Category : > 60 % 41 - 60 % 20 - 40 % KONDISI SAAT INI (Rasio Elektrifikasi) NAD 76,98% Sumut 69,68% Kaltim 68,56% Gorontalo 49,79% Kalteng 45,22% Riau + Kepri 55,84% Sulut 66,87% Kalbar 45,83% Malut 49,44% Sumbar 69,37% Sumsel 50,30% Sulbar N.A Sulteng 48,30% Babel 72,88% Jambi 51,41% Sulsel 55,20% Jakarta 100% Sultra 38,09% Kalsel 72,29% Bengkulu 51,46% Maluku 54,51% Bali 74,98% Lampung 48,82% Banten 63,90% Jabar 67,40% Jatim 71,55% Jateng 71,24% NTT 24.55% NTB 32.51% Papua + Irjabar 32, 35% Jogya 84,48% 7

  8. PROGRAM LISTRIK PERDESAAN 2008 ( Sumber Pembiayaan APBN)

  9. PEMBANGUNAN LISTRIK PERDESAAN (LISDES) 9

  10. DME Berbasis Energi non BBN Berbasis Mikro Hydro Berbasis Tenaga Angin Berbasis Tenaga Surya Berbasis Biogas Berbasis Biomassa DESA MANDIRI ENERGI (KUMULATIF) DME Berbasis BBN • Berbasis jarak pagar • Berbasis kelapa • Berbasis sawit • Berbasis singkong • Berbasis tebu

  11. PENGGERAK UTAMA PEMBANGUNAN (EFEK BERANTAI) PRO POOR PRO GROWTH PRO JOB • Pembangunan daerah • Pembukaan lapangan kerja • Meningkatkan nilai tambah • Community Development • Meningkatkan kegiatan ekonomi SEKTOR ESDM BACKWARD LINKAGE INDUSTRI ESDM FORWARD LINKAGE contoh: pabrik pupuk, petrokimia, dll contoh: industri material & industri peralatan di Batam

  12. PRODUKSI DAN PEMANFAATAN GAS BUMITAHUN 2008

  13. II. POTENSI ENERGI DAN MINERAL

  14. NAD NATUNA 144.42 414.03 113.34 SUMATERA UTARA KALIMANTAN 136.71 PAPUA 765.75 4,163.75 SUMATERA TENGAH 60.83 MALUKU 58.02 852.48 SUMATERA SELATAN SULAWESI JAWA BARAT JAWA TIMUR 596.81 913.09 TERBUKTI = 3,747.50 MMSTB POTENSIAL = 4,471.72 MMSTB TOTAL = 8,219.22 MMSTB CADANGAN MINYAK BUMI (MMSTB) CADANGAN MINYAK BUMI INDONESIA (2008)

  15. 105 110 115 130 100 120 125 135 140 5 0 -5 -10 CEKUNGAN MIGAS INDONESIA 5 6 21 8 5 10 4 17 14 5 3 18 3 Wilayah eksplorasi (119)  20dilaporkan menemukan cadangan migas Cekungan telah dibor, belum ditemukan hidrokarbon (14) Cekungan sudah berporduksi (16) Cekungan telah ditemukan hidrokarbon, belum berproduksi (8) Cekungan belum dieksplorasi (22) 15

  16. CADANGAN GAS BUMI DAN CBM INDONESIA(2008) ACEH (NAD) 5.72 NATUNA NORTH SUMATRA 1.27 52.59 CENTRAL SUMATRA 24.96 8.15 EAST BORNEO PAPUA 24.21 SOUTH SUMATRA 3.18 28.00 CELEBES WEST JAVA 4.16 MOLUCCAS 5.08 13.65 EAST JAVA (Advance Resources Interational, Inc., 2003 processed) CADANGAN GAS (TSCF) CBM RESOURCES (TCF) TERBUKTI = 112.47 TSCF POTENSIAL = 57.60 TSCF TOTAL = 170.07 TSCF TOTAL = 453,3 TSCF

  17. OMBILIN BASIN NORTH TARAKAN BASIN (17.50 TCF) BERAU BASIN (8.40 TCF) CENTRAL SUMATRA BASIN (52.50 TCF) KUTEI BASIN (80.40 TCF) OMBILIN BASIN (0.50 TCF) BARITO BASIN (101.60 TCF) SOUTH SUMATRA BASIN (183.00 TCF) SOUTHWEST SULAWESI BASIN (2.00 TCF) PASIR AND ASEM ASEM BASINS (3.00 TCF) BENGKULU BASIN (3.60 TCF) JATIBARANG BASIN (0.80 TCF) CEKUNGAN BATUBARA DAN CBM INDONESIA Indragiri Hulu Kutai Sangatta I Bentian Besar Barito Banjar II Sekayu Barito Banjar I Total sumber daya = 453.30 TCF Total cekungan CBM= 11 = 7 Wilayah Kerja CBM yang telah ditandatangani, 2008 (Advance Resources Interational, Inc., 2003) 17

  18. POTENSI DAN INFRASTRUKTUR BATUBARA(2008) THAILAND LAOS Manila Bangkok CAMBODIA Philipines Ban Mabtapud South China Sea Phnom Penh VIETNAM Ho Chi Minh City Erawan Khanon Songkhla Bangkot Lawit Jerneh Kota Kinibalu Guntong BRUNEI Banda Aceh Penang Alpha West Natuna Natuna Bandara Seri Begawan Lhokseumawe Kerteh Duyong WEST MALAYSIA Mogpu Kuala Lumpur Bintulu Port Klang Medan EAST MALAYSIA Port Dickson Pacific Ocean Manado Dumai SINGAPORE Kuching Ternate HALMAHERA Bintan Batam Duri Bontang Sorong Samarinda KALIMANTAN Padang Jayapura Balikpapan S U M A T R A Jambi SULAWESI Grissik Banjarmasin IRIAN JAYA Palembang SERAM BURU Ujung Pandang TOTALCAPACITY 24,000 MW I N D O N E S I A MADURA Jakarta Semarang Merauke Bangkalan Pagerungan J A V A Surabaya BALI SUMBAWA FLORES LOMBOK Indian Ocean TIMOR SUMBA AUSTRALIA Sumber daya: 104,76miliar ton Kapasitas maksimum terminal (DWT) Tarakan 7.500 Muara Pantai 150.000 Tanjung Redep 5.000 Tanjung Bara 210.000 Tanjung Meranggas 90.000 Muara Berau 8.000 B el o r o 8.000Loa Tebu 8.000 Balikpapan 65.000 Tanah Merah 60.000 51.92 52.44 0.002 0.15 Apar Bay 6.000 Tanjung Pemancingan 8.000 North Pulau Laut 150.000 Tanjung Peutang 8.000 IBT 200.000 Sembilang 7.500 Air Tawar* 7.500 Muara Satui 7.500 S a t u i* 5.000 Kelanis* 10.000 Jorong 7.000 Taboneo 15.000 0.23 0.014 Tarahan 40.000 Pulau Baai 40.000 Kertapati 7.000 Teluk Bayur 35.000

  19. 19

  20. WILAYAH PENGEMBANGAN PANAS BUMI(2008) SARULA 330 MW SEULAWAH AGAM 160 MW SIBAYAK 12 MW Tahap Pengembangan : 1.537,5 MW Tahap Produksi : 1.052 MW JABOI 50 MW Akan Ditenderkan : 680 MW JAILOLO 75 MW LUMUTBALAI (UNOCAL) LUMUT BALAI 110 MW DIENG 60 MW KARAHA 400 MW LAHENDONG I - II 40 MW KAMOJANG 200 MW T.PERAHU 100 MW BEDUGUL 175 MW ULUMBU 10 MW UNGARAN 50 MW TAMPOMAS 50 MW SOKORIA 30 MW ULUBELU 110 MW NGEBEL 120 MW CISOLOK 45 MW SALAK 375 MW PATUHA 400 MW WAY. WINDU I 110 MW DARAJAT 255 MW MATALOKO 2.5 MW Total Potensi: 27.670 MW Total Kapasitas : 1.052 MW

  21. CADANGAN DAN PRODUKSI ENERGI INDONESIA(2008) 21

  22. CADANGAN DAN PRODUKSI MINERAL INDONESIA (2008) *) Bijihnikeliniberasaldari PT. AntamTbksebesar 7.105.330 ton dan 237.075 ton yang digunakanuntukmemproduksiNikel-FeNisertadari PT INCO Tbksebesar 14.072.680 ton yang digunakanuntukmemproduksiNikel in Matte. 22

  23. III. KEBIJAKAN ENERGI DAN MINERAL

  24. KEBIJAKAN ENERGI DAN SUMBER DAYA MINERAL(Berdasarkan UU Energi No. 30 tahun 2007 & UU Minerba No. 4 tahun 2009) EKSPLORASI PRODUKSI SUPPLY SIDE POLICY JAMINAN PASOKAN KONSERVASI (OPTIMASI PRODUKSI) SHIFTING PARADIGM KETAHANAN ENERGI DAN MINERAL HARGA ENERGI SUBSIDI LANGSUNG DIVERSIFIKASI DEMAND SIDE POLICY KESADARAN MASYARAKAT KONSERVASI (EFISIENSI)

  25. BBM BERSUBSIDI(KEBIJAKAN DAN VOLUME) • VOLUME BBM BERSUBSIDI BBM Non-Subsidi BBM Subsidi 60 40 Juta KL BBM bersubsidi: 100.000 kL M. Tanah 20 0 2006 2009 (?) • KEBIJAKAN SUBSIDI BBM 2009 S = Subsidi NS = Non Subsidi

  26. BPP TR : Rp 1.069/kWh 923 HARGA JUAL LISTRIK vs BPP TAHUN 2009(Pelanggan Tegangan Rendah/TR) Keterangan: Harga Jual realisasi bulan Nopember 2008

  27. PROGRAM DIVERSIFIKASI ENERGI

  28. SASARAN BAURAN ENERGI PRIMER NASIONAL 2025 Tahun 2008 Tahun 2025 (Skenario Optimal) Tahun 2025 (Skenario BaU) OPTIMALISASI PENGELOLAAN ENERGI

  29. JALUR CEPAT PENGEMBANGAN BAHAN BAKAR NABATI Desa Mandiri Energi JANGKA PENDEK JANGKA PANJANG Penciptaan lapangan kerja Setiap daerah mengembangkan BBN sesuai potensi Jalur Cepat Energi Pengurangan kemiskinan Kawasan Khusus Pengembangan BBN

  30. IV. RENCANA KE DEPAN

  31. RENCANA INVESTASI SEKTOR ESDM TAHUN 2010-2014

  32. RENCANA INVESTASI INFRASTRUKTUR SEKTOR ESDM 2010 – 2014 • Catatan: • Pendanaaninvestasidominan bersumber dari Swasta • Investasi untuk pengembangan infrastruktur (tidak termasuk perbaikan) • *) belum termasuk investasi pengembangan lapangan

  33. PROGRAM PENGEMBANGAN PEMBANGKIT LISTRIK Program 10.000 MW Tahap I (Perpres 71/2006) Pra kontrak : 438 MW (7 proyek) (pra kontrak: 34/2 proyek & digabung, ditunda, dibatalkan, diganti IPP: 404 MW/5 proyek) Pasca kontrak (tanda tangan EPC): 9.381 MW (33 proyek) Program 10.000 MW Tahap II (Perpres dalam penyelesaian) PLTP : 3.583 MW (Jawa-Bali: 1.525; Luar Jawa-Bali: 2.058) PLTA : 1.174 MW (Jawa-Bali: 1.000 MW;Luar Jawa-Bali: 174 MW) PLTU : 2000 MW (Jawa-Bali); 4.164 MW (Luar Jawa-Bali: 2.164 MW) PLTGU: 1.626 MW (Jawa-Bali: 1.200 MW; Luar Jawa-Bali: 426 MW) Program IPP Pra kontrak : 937 MW (6 proyek); Tender : 8.388 MW (30 proyek) Pasca kontrak :5.896 MW (47 proyek); Beroperasi: 4.269 MW (19 proyek) 33

  34. PETA LOKASI PROYEK PERCEPATAN 10.000 MW TAHAP I TOTAL 9.537 MW PLTU NAD – Meulaboh (2 x 110 MW) PLTU SUMUT – Pangkalansusu (2 x 200 MW) KALIMANTAN 405 MW 4 LOKASI SULAWESI 220 MW 4 LOKASI MALUKU 46 MW 2 LOKASI PLTU SULUT – Amurang (2 x 25 MW) PLTU 1 RIAU – Bengkalis (2 x 10 MW) PLTU 1 KALBAR – Parit Baru (2 x 50 MW) PLTU KEP.RIAU – Tj. Balai Karimun (2 x 7 MW) PLTU MALUT – Tidore (2 x 8 MW) PLTU 2 RIAU – Selat Panjang (2 x 7 MW) PLTU GORONTALO – Anggrek (2 x 25 MW) PAPUA 34 MW 2 LOKASI PLTU 2 KALBAR – Bengkayan (2 x 27,5 MW) PLTU SUMBAR – Teluk Sirih (2 x 112 MW) PLTU 3 BANGKA – Bangka Baru (2 x 30 MW) PLTU 1 KALTENG – Pulang Pisau (2 x 60 MW) PLTU 1 KALSEL – Asam Asam (2 x 65 MW) PLTU 2 PAPUA – Jayapura (2 x 10 MW) SUMATERA 1225MW 9 LOKASI PLTU 4 BANGKA – Belitung (2 x 16,5 MW) PLTU SUTENG – Kendari (2 x 10 MW) PLTU MALUKU – Ambon (2 x 15 MW) PLTU LAMPUNG – Tj. Selaki (2 x 100 MW) PLTU 1 PAPUA – Timika (2 x 7 MW) PLTU 3 BANTEN – Lontar (3 x 315 MW) NUSA TENGGARA 117 MW 4 LOKASI PLTU SUSEL – Barru (2 x 50 MW) PLTU 1 JABAR – Indramayu (3 x 330 MW) PLTU 1 BANTEN – Suralaya (1 x 625 MW) PLTU 1 JATENG – Rembang (2 x 315 MW) PLTU 3 JATIM – Tj. Awar Awar (2 x 350 MW) PLTU 2 BANTEN – Labuhan (2 x 315 MW) PLTU 2 JATIM – Paiton (1 x 660 MW) PLTU 2 JABAR –Pelabuhan Ratu (2 x 350 MW) PLTU 1 NTB – Bima (2 x 10 MW) PLTU 2 JATENG – Cilacap Baru (1 x 660 MW) PLTU 1 NTT – Ende (2 x 7 MW) PLTU 1 JATIM – Pacitan (2 x 315 MW) JAWA 7490 MW 10 LOKASI PLTU 2 NTB – Lombok (2 x 25 MW) PLTU 2 NTT – Kupang (2 x 16,5 MW) 34

  35. RENCANA PROYEK PERCEPATAN 10.000 MW TAHAP II • TOTAL • PLTA : 1.174 MW • PLTP : 3.583 MW • PLTU : 4.164 MW • PLTGU : 1.626 MW • TOTAL : 10. 547 MW • SUMATERA • PLTA : 174 MW • PLTP : 1.825 MW • PLTU : 1.014 MW • PLTGU : 66 MW • Subtotal : 3.079 MW • KALIMANTAN • PLTU : 706 MW • PLTGU : 120 MW • Subtotal : 826 MW • SULAWESI • PLTP : 125 MW • PLTU : 198 MW • PLTGU : 240 MW • Subtotal : 563 MW • PAPUA • PLTU : 114 MW • Subtotal : 114 MW • JAWA • PLTA : 1.000 MW • PLTP : 1.525 MW • PLTU : 2.000 MW • PLTGU : 1.200 MW • Subtotal : 5.725 MW • MALUKU • PLTP : 37 MW • PLTU : 32 MW • Subtotal : 69 MW • NTB • PLTP : 40 MW • PLTU : 70 MW • Subtotal : 110 MW • NTT • PLTP : 31 MW • PLTU : 30 MW • Subtotal : 61 MW 35

  36. KONDISI/MASALAH DAN ALTERNATIF SOLUSI PROGRAM 10.000 MW TAHAP I DAN II

  37. PROYEK IPP TAHAP OPERASI • PLTGU Palembang Timur 150 MW, COD: Sept 2004 • PLTG Gn. Megang 2 x 40 MW, COD: Nop 2007 PLTP Sibayak 10 MW, COD: 2008 PLTU Embalut 2 x 25 MW, COD: Okt 2008 PLTM Mobuya 3 x 1 MW, COD: Akhir 2007 PLTU Tawaeli 2 x 13,5 MW, COD Nop 2007 • PLTGU Sengkang 135 MW, COD Mar 1999 • PLTD Pare Pare (Suppa) 6 x 10,37 MW, COD: Mei 1998 • PLTG Sengkang (ekspansi 1) 1 x 60 MW, COD: Sept 2008 • PLTP Dieng 1 x 60 MW, COD: Okt 2002 • PLTU Cilacap 2 x 281 MW, COD: Peb 2007 • PLTP Salak Unit 4, 5 & 6 3 x 55 MW, COD: Okt 1997 • PLTP Darajat Unit 2 1 x 90 MW, COD: Peb 2000 • PLTP Wayang Windu Unit 1 1 x 110 MW, COD: Juni 2000 • PLTP Darajat Unit 3 1 x 90 MW, COD: Agus 2007 • PLTP Kamojang 4 1 x 60 MW, COD: Jan 2008 • PLTP Wayang Windu Unit 2 1 x 110 MW, COD: 2009 • PLTU Paiton I – PEC 2 x 615 MW, COD: Juli 2000 • PLTU Paiton II – JP 2 x 610 MW, COD: Nop 2000 Sumatera : 240 MW (3 IPP) Jamali & NTB/NTT : 3.697 MW (10 IPP) Kalimantan : 50 MW (1 IPP) Sulawesi & Indonesia Timur : 287 MW (5 IPP) TOTAL : 4. 269 MW (19 IPP)

  38. PROYEK IPP TAHAP KONSTRUKSI • PLTM Parluasan 2 x 2,1 MW, COD: 2009 • PLTM Hutaraja 2 x 2,25 MW, COD: akhir 2009 • PLTA Asahan 1 2 x 90 MW, COD: Mid 2010 • PLTU Tanjung Pinang 2 x 10 MW, COD: Juli 2010 • PLTU Tj. Balai Karimun 2 x 6 MW, COD: akhir 2010 PLTU Tanah Grogot 2 x 7 MW, COD: mid 2010 • PLTU Pontianak 2 x 25 MW, COD: mid 2010 • PLTU Ketapang 2 x 6 MW, COD: Sept. 2010 PLTU Gorontalo 2 x 6 MW, COD: mid 2010 PLTU Bangka 2 x 10 MW, COD: Akhir 2010 PLTA Poso 3 x 65 MW, COD: awal 2010 PLTU Lampung Tengah 2 x 6 MW, COD: Akhir 2010 • PLTM Ranteballa 2 x 1,2 MW, COD: Mid 2009 • PLTM Manippi 1 x 10 MW, COD 2011 PLTU Tj. Jati B (Ekspansi) 2 x 660 MW, COD: Akhir 2011 PLTU Celukan Bawang 2 x 125 MW, 1 x 130 MW, COD: mid 2011 Sumatera : 253 MW (7 IPP) Jamali & NTB/NTT : 1.700 MW (2 IPP) Kalimantan : 76 MW (3 IPP) Sulawesi & Indonesia Timur : 219 MW (4 IPP) TOTAL : 2.248 MW (16 IPP)

  39. RENCANA PENINGKATAN AKSESIBILITAS MASYARAKAT TERHADAP KELISTRIKAN

  40. TARGET ENERGI PRIMER UNTUK PEMBANGKITAN

  41. RENCANA PENINGKATAN KAPASITAS TERPASANG ENERGI BARU TERBARUKAN

  42. RENCANA PRODUKSI ENERGI FOSIL TAHUN 2010-2014

  43. RENCANA PEMBANGUNAN INFRASTRUKTURBIDANG MINYAK DAN GAS BUMI 2010 - 2014

  44. RENCANA PEMBANGUNAN INFRASTRUKTURBIDANG MINYAK DAN GAS BUMI 2010 - 2014 Catatan: *) Pendanaan dari APBN

  45. PETA KILANG MINYAK & HASIL OLAHAN INDONESIA PT. PERTAMINA (Persero) Kilang UP I Pk. Brandan KAPASITAS : 4,5 MBCD (Tidak Beroperasi sejak 2007) TOTAL KAPASITAS KILANG MINYAK 1.155,6 MBCD PT. PERTAMINA (Persero) Kilang UP II Dumai KAPASITAS : 127 MBCD PT. PERTAMINA (Persero) Kilang UP V Balikpapan KAPASITAS : 260 MBCD PT. PERTAMINA (Persero) Kilang UP VII Kasim KAPASITAS : 10 MBCD PT. PATRA SK - DUMAI Kilang Hasil Olahan KAPASITAS : 25 MBCD PT. PERTAMINA (Persero) Kilang UP VI Balongan KAPASITAS : 125 MBCD PT. PRIMERGY SOLUTION Kilang Hasil Olahan KAPASITAS : 600 Ton/Bln Pelumas Bekas PT. PERTAMINA (Persero) Kilang UP II Sungai Pakning KAPASITAS : 50 MBCD PT. PERTAMINA (Persero) Kilang UP III Plaju KAPASITAS : 127,3 MBCD PT. PERTAMINA (Persero) Kilang UP IV Cilacap KAPASITAS : 348 MBCD PUSDIKLAT MIGAS Kilang Cepu KAPASITAS : 3,8 MBCD PT. TRANS PACIFIC PETROCHEMICAL INDOTAMA - Tuban KAPASITAS : 100 MBCD

  46. PETA RENCANA PENGEMBANGAN KILANG MINYAK KILANG MUBA KAPASITAS : 800 B/D STATUS : KONSTRUKSI BANTEN BAY REFINERY KAPASITAS : 150 MBCD STATUS : Pembentukan JV BALONGAN EXPANSION KAPASITAS : 200 MBCD STATUS : RENCANA PERTAMINA TRI WAHANA UNIVERSAL KAPASITAS : 6 MBCD STATUS : KONSTRUKSI EAST JAVA REFINERY KAPASITAS : 200 MBCD STATUS : RENCANA PERTAMINA

  47. PENGEMBANGAN INFRASTRUKTUR GAS BUMI/LNG NATUNA Dalam proses ARUN 12,3 MTPA TERBUKTI = 112,47 TSCF POTENSIAL = 57,60 TSCF TOTAL = 170,07 TSCF ACEH (NAD) NAD BONTANG 22,25 MTPA 5,72 TANGGUH KAPASITAS: 7,6 MTPA Rencana pengembangan: 3,6 MTPA 1,27 52,59 SUMATERA UTARA NATUNA KALIMANTAN TIMUR 8,15 24,96 PAPUA SUMETERA TENGAH 24,21 3,18 28,00 SULAWESI SUMATERA SELATAN MALUKU JAWA BARAT 4,16 DONGGI-SENORO Dalam proses: 2 MTPA JAWA TIMUR 5,08 6.30 13,65 Kilang LNG (MTPA) Cadangan Gas(TSCF) MASELA Dalam proses: 3 MTPA Rencana pembangunan LNG Receiving terminal (+ 3 MTPA)

  48. RENCANA PEMBANGUNAN JARINGAN DISTRIBUSI GAS BUMI UNTUK RUMAH TANGGA

  49. V. STRATEGI

  50. STRATEGI SEKTOR ESDM DALAM MEMPERTAHANKAN PERAN DAN KINERJA • Mempertahankan kontribusi dalam penerimaan negara • Meningkatkan eksplorasi • Meningkatkan cadangan migas, batubara dan mineral • Optimasi produksi migas dan pertambangan • Meningkatkan kontribusi dalam pembangunan daerah • Dana bagi hasil: • CSR: • Lisdes: • DME: • Pemboran air tanah: • Meningkatkan neraca perdagangan, dengan mengurangi impor

More Related