IssueFoundation size provided was 641 m2 as against the required 2720 m2. Silo wall thickness was 350 mm. (Structurally sound, but because of the PT duct and the reinforcement, there was no space for pouring concrete.) PT forces applied were 80 % of the hoop forces as against 60%. The PT ducts were filled up to 60-70 % (As per code it should be 97% filled). As a result, the silo tilted, bulged and buckled at 28 mt to 40 mt. level, resulting in unsafe operating conditions. http://www.iccplindia.com/structural-enhancement.html

Download Presentation

Structural Enhancement - RAW MILL SILO

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Structural enhancement raw mill silo

Structural Enhancement

RAW MILL SILO

1 Radial cracks, further

resulting in delamination of

concrete

2 Buckled section of the silo (28

mt. Level)

3 PT duct (About 40 % empty)

4 Additional MS reinforcement

welded with existing

reinforcement and anchored

to parent oncrete

5 Patching the damaged

concrete section with

microconcrete in vertical

strips

6 Ongoing repair on the rear side

(subjected to tension)

7 Silo after completion of

repair

Issue

Foundation size provided was 641 m2 as against the required 2720 m2. Silo wall thickness was 350 mm.

(Structurally sound, but because of the PT duct and the reinforcement, there was no space for pouring

concrete.) PT forces applied were 80 % of the hoop forces as against 60%. The PT ducts were filled up to

60-70 % (As per code it should be 97% filled).

As a result, the silo tilted, bulged and buckled at 28 mt to 40 mt. level, resulting in unsafe operating

conditions.

Challenge

The entire job was to be completed within 6 months and the work was to be carried out under partial

operating condition.

The problem of local bursting of concrete was encountered during repair.

A major part of work was carried out in summer where the ambient temperature was more than 50°C


Structural enhancement raw mill silo

Solution

Designed, modified material and methodology to achieve the desired results

Conducted trials on site

Grouting of the RCC shell done with high strength epoxies

Provided additional reinforcement

Patching of the damaged concrete section done with micro concreting.

Source: http://www.iccplindia.com/structural-enhancement-raw-mill-silo.html