North London Network Management Unit. Why do we replace gas mains ?. 1970’s – King Inquiry 1995 – Maintain Safety Level - HSE 2001 – Precautionary Approach - HSE. Neil Shaw/v.1./30 January 2002. North London Network Management Unit. Mains Incidents 1976 to 2001. Trend Line.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' 1970’s – King Inquiry 1995 – Maintain Safety Level - HSE 2001 – Precautionary Approach - HSE' - ursula


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

North London Network Management Unit

Why do we replace gas mains ?

  • 1970’s – King Inquiry
  • 1995 – Maintain Safety Level - HSE
  • 2001 – Precautionary Approach - HSE

Neil Shaw/v.1./30 January 2002

slide2

North London Network Management Unit

Mains Incidents 1976 to 2001

Trend Line

slide3

North London Network Management Unit

Regional Breakdown

Neil Shaw/v.1./30 January 2002

slide4

North London Network Management Unit

Minimising Disruption

  • Ofgem have capped our allowed costs for 2002 – 07 = Incentive to reduce cost= reducing
  • excavations
  • Decommission only where possible ratio target 1:1.1 lay:decommission
  • Use no – dig techniques where possible typically50 – 60% achieved

Neil Shaw/v.1./30 January 2002

slide5

North London Network Management Unit

Summary

  • Safety
  • Precautionary approach applied by HSE under Pipeline Safety Regulations
  • Regulatory Incentive to reduce cost = reduceexcavation
  • Aim to minimise disruption by use of non digtechniques

Neil Shaw/v.1./30 January 2002

slide6

North London Network Management Unit

Neil Shaw/v.1./30 January 2002

slide7

North London Network Management Unit

Neil Shaw/v.1./30 January 2002