North London Network Management Unit. Why do we replace gas mains ?. 1970’s – King Inquiry 1995 – Maintain Safety Level - HSE 2001 – Precautionary Approach - HSE. Neil Shaw/v.1./30 January 2002. North London Network Management Unit. Mains Incidents 1976 to 2001. Trend Line.

Download Presentation

1970’s – King Inquiry 1995 – Maintain Safety Level - HSE 2001 – Precautionary Approach - HSE

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


1970 s king inquiry 1995 maintain safety level hse 2001 precautionary approach hse

North London Network Management Unit

Why do we replace gas mains ?

  • 1970’s – King Inquiry

  • 1995 – Maintain Safety Level - HSE

  • 2001 – Precautionary Approach - HSE

Neil Shaw/v.1./30 January 2002


1970 s king inquiry 1995 maintain safety level hse 2001 precautionary approach hse

North London Network Management Unit

Mains Incidents 1976 to 2001

Trend Line


1970 s king inquiry 1995 maintain safety level hse 2001 precautionary approach hse

North London Network Management Unit

Regional Breakdown

Neil Shaw/v.1./30 January 2002


1970 s king inquiry 1995 maintain safety level hse 2001 precautionary approach hse

North London Network Management Unit

Minimising Disruption

  • Ofgem have capped our allowed costs for 2002 – 07 = Incentive to reduce cost= reducing

  • excavations

  • Decommission only where possible ratio target 1:1.1 lay:decommission

  • Use no – dig techniques where possible typically50 – 60% achieved

Neil Shaw/v.1./30 January 2002


1970 s king inquiry 1995 maintain safety level hse 2001 precautionary approach hse

North London Network Management Unit

Summary

  • Safety

  • Precautionary approach applied by HSE under Pipeline Safety Regulations

  • Regulatory Incentive to reduce cost = reduceexcavation

  • Aim to minimise disruption by use of non digtechniques

Neil Shaw/v.1./30 January 2002


1970 s king inquiry 1995 maintain safety level hse 2001 precautionary approach hse

North London Network Management Unit

Neil Shaw/v.1./30 January 2002