El Paso Natural Gas Company Docket Nos. RP00-336-002, RP01-484-000, RP01-486-000, and RP00-139-000. Robert Petrocelli, Ingrid Olson, Elizabeth Zerby. El Paso Natural Gas System. Nevada. Anadarko Basin. Arizona. San Juan Basin. Dumas Station. Havasu Line. New Mexico. Topock. Valve

Download Presentation

El Paso Natural Gas Company Docket Nos. RP00-336-002, RP01-484-000, RP01-486-000, and RP00-139-000

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


El paso natural gas company docket nos rp00 336 002 rp01 484 000 rp01 486 000 and rp00 139 000

El Paso Natural Gas CompanyDocket Nos. RP00-336-002,RP01-484-000, RP01-486-000, and RP00-139-000

Robert Petrocelli, Ingrid Olson, Elizabeth Zerby


El paso natural gas system

El Paso Natural Gas System

Nevada

Anadarko

Basin

Arizona

San Juan Basin

Dumas Station

Havasu Line

New Mexico

Topock

Valve

City

Texas

Permian-San Juan

Crossover

Maricopa Line

CA

Plains Station

Eunice Station

Low Pressure System

Keystone Station

Ehrenberg

Waha

Station

Permian

Basin

High Pressure System


Peak demand in mmcf d

Peak Demand(in MMcf/d)

Capacity


Should fr service be converted to cd service

Should FR service be converted to CD service?

  • Staff recommends converting FR service to CD service

    • maintain existing rate structure

    • maintain FT-2 FR contracts

  • Benefits

    • provides certainty for all shippers

    • unspecified rights degrade firm CD service


What level of contact demand should be assigned to ft 1 full requirements shippers

What level of contact demand should be assigned to FT-1 full requirements shippers?

  • Settlement Billing Determinants (BD)

  • Coincidental Peak Demand (CP)

  • Non-Coincidental Peak Demand (NCP)

  • Some combination of the above


Benefits of using the greater of bd or cp

Benefits of Using theGreater of BD or CP

  • Reflects FR customer current usage (Dec. 12, 2001 system peak day)

  • No shipper is allocated less than the capacity they pay for under the Settlement

  • Maintains CD service at contract levels

  • Matches contract demand to system capacity to preserve reliability

  • Places all customers on equal footing and sends proper price signals for expansion


Should specific receipt point rights be assigned

Should specific receipt point rights be assigned?

  • Consistent with Commission-approved delivery point allocation order in BR/Amoco/Topock complaint case

  • Provides certainty of supply for all firm shippers

  • Eliminates daily pro-rata curtailments

  • Enhances value and tradability of capacity


Current pooling areas

Current Pooling Areas

Bondad

Anadarko

Basin

Arizona

San Juan Basin

Dumas Station

Blanco

Anadarko

Havasu Line

New Mexico

Topock

Valve

City

Texas

Permian-San Juan

Crossover

Maricopa Line

Plains

Plains Station

Eunice Station

Low Pressure System

Keystone

Keystone Station

Ehrenberg

Waha

Station

Waha

Permian

Basin

High Pressure System


20 proposed pooling areas

20 Proposed Pooling Areas

MCCAMEY or

LINE 2000

Anadarko

Basin

Arizona

San Juan Basin

Dumas Station

Havasu Line

New Mexico

Topock

Valve

City

Texas

Permian-San Juan

Crossover

Maricopa Line

Plains Station

Eunice Station

Low Pressure System

Keystone Station

Ehrenberg

Waha

Station

Permian

Basin

High Pressure System


Conclusion

Conclusion

  • Conversion aids shippers by restoring certainty to firm services and by providing equal access to supplies

  • Ensures proper relationship between rates paid and services rendered

  • Next step: Convene a conference to receive comments on staff’s recommendation