BPM Issues in Sector 7-8

BPM Issues in Sector 7-8. Asynchronous Trajectory Mode Worked on 1 st Shot All BPMs acquired BPM Problems BPMIV.88104 – H / V flip suspected H pick-up on BI installation traveller – should be V Fibre mix-up on 8 BPMs Q1-Q7 Left of 8 Corrected on Saturday morning BPM.34R7.B2

urbain
Download Presentation

BPM Issues in Sector 7-8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BPM Issues in Sector 7-8 • Asynchronous Trajectory Mode • Worked on 1st Shot • All BPMs acquired • BPM Problems • BPMIV.88104 – H / V flip suspected • H pick-up on BI installation traveller – should be V • Fibre mix-up on 8 BPMs Q1-Q7 Left of 8 • Corrected on Saturday morning • BPM.34R7.B2 • Horizontal plane inverted • BPM.28R7.B2 • B1-B2 mismatch of individual button signal • Reflectometry team? • BPM.12R7.B2 • H / V inversion – fibres crossed • BPMWE.5L7.B2 • H polarity error (nothing visible on photos) Rhodri Jones – AB/BI LHC Injection Test – Beam 2

  2. BPM Issues in Sector 7-8 • Other Suspects • BPMW.5L7.B2 • both H & V - gain/polarity? optics? (*) • BPMSX.4L8.B2 • both H & V - gain/polarity? optics? • Beam is off centre in BPMSX by ~10mm (in between D1 & D2) • Optics • phase advance error • insufficient response data for further details Courtesy of R. Steinhagen Rhodri Jones – AB/BI LHC Injection Test – Beam 2

  3. BPM Issues in Sector 7-8 • Successful Tests of Synchronous Capture Mode • BST successfully used to advance pre-pulse to 2 turns before injection • Data collected from a single front-end crate • alternate BPMs from Q1L8 to Q32L8 • Conclusions • Pre-pulse to bunch timing stable to better than 3ns • limited by resolution of BPM TDC • Reproducible • Uncorrected & corrected data sets taken 2 shifts apart • Will now automate this to allow quick phasing in of all BPMs Rhodri Jones – AB/BI LHC Injection Test – Beam 2

More Related