1 / 14

Alameda Creek Bridge Replacement Proposed Alternatives December 5, 2013

Alameda Creek Bridge Replacement Proposed Alternatives December 5, 2013. Gary Pursell District Division Chief, Design East. Existing Bridge. Constructed 1928 85 Years Old Narrow Bridge, No Shoulders Obsolete Bridge Rail, Non-Standard Concrete Spalls, Exposed Rebar, Throughout

upton
Download Presentation

Alameda Creek Bridge Replacement Proposed Alternatives December 5, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alameda Creek Bridge ReplacementProposed AlternativesDecember 5, 2013 Gary Pursell District Division Chief, Design East

  2. Existing Bridge • Constructed 1928 • 85 Years Old • Narrow Bridge, No Shoulders • Obsolete Bridge Rail, Non-Standard • Concrete Spalls, Exposed Rebar, Throughout • Classified “Functionally Obsolete” • Poor Approach Alignment • Poor Sight Distance

  3. Design Considerations • Service Life of Replacement Bridge: 100+ years • Design Speed Standard (HDM): 50-60 mph • Posted Speed Limit: 45 mph • Operating Speed: • - Critical Speed (85 percentile): 48 mph • Roadway Safety Assessment Recommendation (FHWA) • Bridge Replacement is a State and Federal Priority

  4. Viable Alternatives Alternative 1 – Project Initiation Document Alternative 2 – Value Analysis Study Alternative 3A – Value Analysis Modified Alternative 3B – 3A Design Variation

  5. Alternative 1 – Project Initiation, 2003

  6. Alternative 2 – Value Analysis Study, 2010

  7. Alternate 3A – VA w/Viaduct & Rock Cut

  8. 35 mph Design Speedw/45 mph Bridge

  9. Alternative 3B – Revised East Tie-In

  10. Conceptual Rendering