Status of IAP radars on Andøya

Status of IAP radars on Andøya. MAARSY May 2010: Operation with 210 transceiver modules (45%) Summer 2010: PMSE observation, first 3D-experiments December 2010: second expansion stage with 343 transceiver modules (80%) April 2011: completion of installation Andenes MF radar

umay
Download Presentation

Status of IAP radars on Andøya

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of IAP radars on Andøya • MAARSY • May 2010: Operation with 210 transceiver modules (45%) • Summer 2010: PMSE observation, first 3D-experiments • December 2010: second expansion stage with 343 transceiver modules (80%) • April 2011: completion of installation • Andenes MF radar • new foundation and air-condition • installation of new power cable by Andøy Energy • disturbances probably due to arcing isolators in overhead power lines are still present! • Saura MF radar • upgrade of local network started • SKiYMET meteor radar • disturbances probably due to arcing isolators in overhead power lines are still present • investigation by IAP engineer is planned for April 2011 • refurbishment of antennas is planned for 2011 18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011

  2. Status of IAP radars on AndøyaStorm on 1 November 2010 18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011

  3. Status of IAP radars on AndøyaStorm on 1 November 2010 – MAARSY 18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011

  4. Status of IAP radars on AndøyaStorm on 1 November 2010 –Andenes MF radar and SKiYMET 18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011

  5. Status of IAP radars on AndøyaStorm on 1 November 2010 – repair work 18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011

  6. Status of IAP radars on AndøyaStorm on 1 November 2010 – repair work 18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011

  7. Status of IAP radars on Andøya • MAARSY • May 2010: Operation started with 196transceiver modules (45%) • Summer 2010: PMSE observation, first 3D-experiments • December 2010: second expansion stage with 343 transceiver modules (80%) • April 2011: completion of installation • Andenes MF radar • new foundation and air-condition • installation of new power cable by Andøy Energy • disturbances probably due to arcing isolators in overhead power lines are still present! • Saura MF radar • upgrade of local network at radar hut started • SKiYMET meteor radar • disturbances probably due to arcing isolators in overhead power lines are still present • investigation by IAP engineer is planned for April 2011 • refurbishment of antennas is planned for 2011 18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011