1 / 7

Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug Engineering (PPE)

Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug Engineering (PPE). Participants ITER-PPE training management board EFDA: Malaquias Artur CEA: Doceul Louis, Martins Jean-Pierre, Delphine Keller, Salasca Sophie FZJ : Neubauer Olaf

ulf
Download Presentation

Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug Engineering (PPE)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug Engineering (PPE) • Participants • ITER-PPE training management board • EFDA: Malaquias Artur • CEA: Doceul Louis, Martins Jean-Pierre, Delphine Keller, Salasca Sophie • FZJ : Neubauer Olaf • KIT : Neuberger Heiko (remote) , Scherer Theo (remote) • HAS : Bede Otto • PPE euro-trainees • CEA:Miguel Dapena, Julien Wagrez • FZJ : Romaric Voinchet • KIT : Gaetano Aiello, Zeile Christian • HAS : Nemeth Joszef • Observers • CEA:Commin Lorelei, Madeleine Sylvain • FZJ: Krimmer Andreas

  2. Agenda 9h welcome coffee 9h30 Status of the PPE program (L. Doceul) 10h00 Work performed in the frame of WP1 (M. Dapena) 10h30 Work performed in the frame of WP2 (J. Wagrez) 11h00 Work performed in the frame of WP3 (G. Aiello) 11h30 Work performed in the frame of WP4 (C. Zeile) 12h Lunch 13h Work performed in the frame of WP5 (J. Németh) 13h30 Work performed in the frame of WP6 (R. Voinchet) 14h Work performed in the frame of EUROBREED program (L. Commin) 14h30 Open discussion on PPE program (sharing, conference, training session,….) (All participants, coffee at 15h included ) 15h15 Presentation of Tore-Supra (L. Doceul) 15h30 Visit of Tore-Supra 17h End of Monday meeting

  3. Brief recall of the PPE Work Programme: The thematic of the PPE WP is in the field of Engineering Design and Construction, this training program is associated to the procurement of the ITER Port Plug including: design, structural analysis, neutronics, material requirement, nuclear requirement, safety, manufacturing aspect, assembly aspect, maintainability. The official starting date of the ITER GOT PPE is 1st september 2008 established for 4 years the first year being devoted to the recruitment of the trainees. Six work packages of three years duration are identified: 2 CEA, 1 FZJ, 2 KIT, and 1 HAS The starting date of each work package being the official date of each euro-trainee recruitment.

  4. Work programmes description: ITER GOT PPE WEBSITE

  5. Course and events : Table to be discussed To be consolidated at the end of the meeting Trainee sharing: Sharing between association To be consolidated at the end of the meeting Sharing with industrial partner To be consolidated at the end of the meeting

  6. Deliverable • Deliverables description for 2009 : • All Contract have already started and all the trainees have been recruited during the first year, the ITER GOT PPE training program will run from the 01 September of 2008 to the 07 july of 2012 • First deliverable (3 month) ‘’Personal Career Development Plan’’ (EFDA form to be filled). Completed for each wp • At the end of 2009, progress report are required (progress made, activity status, skill obtained, corrective action if any, …) See EFDA recommendations • EFDA recommendations: • For this meeting one shall discuss the deliverables on the Task Agreement and produce the minutes (this is responsibility of the leading Association). • For later a detailed report is due (by January or beginning of February 2010) which is a gathering of the individual reports from the associations and a summary report from the leading association mentioning the activities performed and the relation between the due deliverables and expenditures at date. • A template will be sent later as EFDA is preparing one possible format at the moment. • TASK AGREEMENT WP08-GOT-ITER_PPE

  7. Training on Nuclear engineering • Dates: From Tuesday 8/12/09 to Friday 11/12/09 • Location: Cadarache Training Building n°143 • Training organisation: AREVA TA • Objectives: Understanding the basic nuclear phenomena, radiation protection, safety and approach the specificities of a basic nuclear installation. • Program: • Tuesday •             Presentation of the training on nuclear engineering and its objectives •             Nuclear physics: (Neutronics, Fission/fusion reaction, particle, matter interaction) • Wednesday •             Radiological risk •             General rules on radiation protection •             Risk prevention and protection rules •             The ALARA principle: design and operating applications • Thursday •             Review of the french approach to nuclear safety •             Visit of nuclear installations on the AREVA TA site: RNG reactor and associated installations • Friday •             Review of safety objectives of ITER •             Visit of nuclear installations on the CEA/Cadarache site: BNI LECA/STAR •             Course overview and debriefing

More Related