HT-7. ASIPP. Daily Operation Report Operation Team I. X. Gong , Z. Zheng, H. Wang, C. Hu, C. Xie , A.Ti. 11-12 Dec 2005. Experimental Topic 1 ) ICRF experiment for DIA_CO2 OH discharges for DIA_TS GAM & Probe Scan Plasma ramp-up/down +DNB

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' ASIPP' - ulani


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

HT-7

ASIPP

Daily Operation Report

Operation Team I

X. Gong, Z. Zheng, H. Wang, C. Hu, C. Xie, A.Ti

11-12 Dec 2005

slide2

Experimental Topic

  • 1) ICRF experiment for DIA_CO2
  • OH discharges for DIA_TS
  • GAM & Probe Scan
  • Plasma ramp-up/down +DNB
  • ICRF Boronization and OH discharges after Bnz
  • It:2000A-3900A
  • Vacuum Pressure: 2.0E-5Pa
  • Wall Temperature: 30C~150C
  • ICRF: ~250kW LHCD: ~100kW
  • Shot No.#82617~#8278x
slide9

2nd ICRF Boronization

  • Pre RF+Taylor Discharge Cleaning (1h30mins)
  • Prf:5~25kw, It:2000A
  • Last time: 1h30mins
  • 3g Carborane
  • Only 30mins low power RF-DC after Bnz
  • Wall temperature: RT
  • Without Taylor assistant
slide10

High Hydrogen Recycling lead to

Uncontrollable Density

How to optimize RF-Boronization procedure to be suitable for long pulse discharge?