HT-7. ASIPP. Daily Operation Report Operation Team I. X. Gong , Z. Zheng, H. Wang, C. Hu, C. Xie , A.Ti. 11-12 Dec 2005. Experimental Topic 1 ) ICRF experiment for DIA_CO2 OH discharges for DIA_TS GAM & Probe Scan Plasma ramp-up/down +DNB

Download Presentation

ASIPP

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Asipp

HT-7

ASIPP

Daily Operation Report

Operation Team I

X. Gong, Z. Zheng, H. Wang, C. Hu, C. Xie, A.Ti

11-12 Dec 2005


Asipp

  • Experimental Topic

  • 1) ICRF experiment for DIA_CO2

  • OH discharges for DIA_TS

  • GAM & Probe Scan

  • Plasma ramp-up/down +DNB

  • ICRF Boronization and OH discharges after Bnz

  • It:2000A-3900A

  • Vacuum Pressure: 2.0E-5Pa

  • Wall Temperature: 30C~150C

  • ICRF: ~250kW LHCD: ~100kW

  • Shot No.#82617~#8278x


Asipp

ICRF Experiment for DIA_CO2


Asipp

OH Discharges for DIA_TS


Asipp

GAM


Asipp

Probe Scan


Asipp

Plasma Ramp-up/Down


Asipp

DNB


Asipp

2nd ICRF Boronization

  • Pre RF+Taylor Discharge Cleaning (1h30mins)

  • Prf:5~25kw, It:2000A

  • Last time: 1h30mins

  • 3g Carborane

  • Only 30mins low power RF-DC after Bnz

  • Wall temperature: RT

  • Without Taylor assistant


Asipp

High Hydrogen Recycling lead to

Uncontrollable Density

How to optimize RF-Boronization procedure to be suitable for long pulse discharge?