An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Liaison Report from 802.18 Date: May 17, 2012 Notice:This document has been prepared to assist IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. John Notor, Notor Research

  2. Overview • This document summarizes the activities of the IEEE 802.18 Radio Regulatory Technical Advisory Group (RR-TAG) during the May 2012 IEEE 802 Interim Meeting held at the Hyatt Regency, Atlanta, GA. John Notor, Notor Research

  3. FCC Proceedings Reviewed • TVWS Third Opinion Memorandum & Orderhttps://mentor.ieee.org/802.18/dcn/12/18-12-0044-00-0000-tvws-third-opinion-memorandum-order.doc • FCC Rules for AWS Public Notice NOI NPRMhttps://mentor.ieee.org/802.18/dcn/12/18-12-0040-00-0000-fcc-rules-for-aws-public-notice-noi-nprm.zip John Notor, Notor Research

  4. Position Paper on TVWS Submitted to FCC • This document was reviewed, revised, and approved by 802.18 and the 802 EC between the March and May meetings. • The document has been submitted to the FCC. The FCC filing can be downloaded at this link:http://apps.fcc.gov/ecfs/document/view?id=7021917314 John Notor, Notor Research

  5. ITU-R Documents Reviewed and Approved by the RR-TAG • The RR-TAG, working with members of the wireless working groups, created an input to ITU-R WP 1A, Question ITU-R 236/1, “Impact on radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management systems”. • A copy of Question ITU-R 236/1 can be found at the following link:https://mentor.ieee.org/802.18/dcn/12/18-12-0025-00-0000-question-itu-r-236-1.docx • The 802.18 approved contribution to WP 1A, 18-12/41r9, is found athttps://mentor.ieee.org/802.18/dcn/12/18-12-0041-09-0000-ieee-802-draft-of-comments-on-wireless-data-transmission-technologies-used-for-power-grid-management.doc • The 802.18 contribution will be submitted to a 10 day EC ballot. If approved the document will be submitted to ITU-R WP 1A for consideration at the June 2012 meeting. John Notor, Notor Research

  6. Informational Presentations • Richard Kennedy, Research in Motion, presented an overview of a variety of regulatory issues of interest to IEEE 802 on Tuesday PM1.Link: https://mentor.ieee.org/802.18/dcn/12/18-12-0045-00-0000-wlan-issues.ppt John Notor, Notor Research