Driving Status of N*Grid Project in Korea
This presentation is the property of its rightful owner.
Sponsored Links
1 / 30

Driving Status of N*Grid Project in Korea PowerPoint PPT Presentation


  • 95 Views
  • Uploaded on
  • Presentation posted in: General

Driving Status of N*Grid Project in Korea. August 27, 2003 Jongsuk Ruth Lee KISTI Supercomputing Center. Table of Contents. Definition of Grid Status of Resources & Grid Necessity N*Grid Project Plans for Activating N*Grid Project Implementation of Grid Testbed

Download Presentation

Driving Status of N*Grid Project in Korea

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Driving status of n grid project in korea

Driving Status of N*Grid Project in Korea

August 27, 2003

Jongsuk Ruth Lee

KISTI Supercomputing Center


Table of contents

Table of Contents

  • Definition of Grid

  • Status of Resources & Grid Necessity

  • N*Grid Project

  • Plans for Activating N*Grid Project

    • Implementation of Grid Testbed

    • Development of Grid System

    • Research on Grid Applications

    • Strategy for N*Grid Project

    • Milestones

  • Summary


Driving status of n grid project in korea

Definition of Grid


Definition of grid

GRID

Definition of Grid

  • Research Infrastructure for dynamically collecting & integrated sharing

    Research Resources connected by high-speed network

Scientific Research Instrument

Supercomputer

Problem Solving

Experts

Large Scale Data


Driving status of n grid project in korea

Status of Resources

&

Grid Necessity


Status of research resources 1 2

Status of Research Resources (1/2)

  • Status of Supercomputer usage (KSCA, 2003. 3)

Organization

KISTI

KMA

SNU

DIU

CNU

POSTECH

PNU

K-JIST

80%

80%

70%

30%

40%

60%

Utilization

70%

60%

  • Status of the only Research Instruments Holding


Status of research resources 2 2

Status of Research Resources (2/2)

  • Status of Research Networks

    • Domestic

      • KOREN : 30Gbps/1GbPS

      • KREONET2 : 10Gbps/1Gbps

    • International

      • APII Testbed (Korea – Japan) : 1Gbps etc

      • TEIN : ~ 30Mbps

      • STAR TAP LINK : ~155Mbps

    • Campus/Industry Network : Gbps


Necessity of introducing grid 1 2

Necessity of Introducing Grid (1/2)

  • Demand of Domestic Computing Resources

USA

KOREA

Domestic Demand

160

148.7

140

120

100

Rmax(TFlops)

80

60

40

12.4

20

2.6

0

1996

1997

1998

1999

2000

2001

2002


Necessity of introducing grid 2 2

Necessity of Introducing Grid (2/2)

  • Necessity of Research Infrastructure Implementation

    • Necessity of investing fund to implement Grid infrastructure for 6T researches to access any computing resources and data any time and any where

* Status of 6T Research Fund ( IT News : 23. 7. 2002)

Areas

IT

BT

ET

ST

NT

CT

Total

Research

Fund

1241.7

billion

374.2

billion

219.3

billion

157.2

billion

81.9

billion

32.3

billion

2106.5

billion


Driving status of n grid project in korea

N*Grid Project


N grid project 1 6

N*Grid Project (1/6)

  • N*Grid includes

    • National Computational Grid

    • National Data Grid

    • National Access Grid

    • National Application Grid

      (Ex: Bio Grid, CFD Grid, Meteo Grid etc)

      including application testbed and portals

  • N*Grid is planned at the government level

    by MIC(Ministry of Information and Communication)

    • 5 year project (2002-2006)

    • Total budget : ~ 32M USD


N grid project 2 6

N*Grid Project (2/6)

  • History of N*Grid with KISTI

    • 1998-1999: Preceding research

      • Development of metacomputing technology on heterogeneous supercomputing resources(The result is published at PDPTA2000 conference)

      • Development of a portable computational steering package: CSP

    • 2000: Initiation of Globus-related research and activity

      • Building of Globus-based metacomputing test-bed

      • Satoshi Sekiguchi(TACC, Japan) proposed Korea to join APGrid(Jun., Dec.)

    • 2001: N*Grid start

      • KISTI Supercomputing Center suggest at MIC to carry out N*Grid(Feb.)

      • MIC announced to start N*Grid as a 5 year(2002-2006) national project(May.)

      • Korea Gird Forum will be launched in Oct., 2001.


N grid project 3 6

N*Grid Project (3/6)

  • Major Contents of N*Grid (2002-2006)

    • Building and operation of Grid Network

      (using KOREN, APII Testbed, KREONet2, HPCNet, etc.)

    • Grid application project survey and support

      (Bio, CFD, Meteo, etc.)

    • Grid related R&D and standardization

      (Grid middleware & Grid browser, etc.)

    • Promotion for sharing of high performance computers and

      large-scaled research instruments

      (Supercomputer, Storage, etc.)

    • Construction of Grid Forum Korea

      (Include gov., univ., research inst., etc.)


N grid project 4 6

N*Grid Project (4/6)

Leap for World Top 5 Country in Knowledge Infrastructure

(Enhancement of National Competitiveness)

Increase Research Power for fundamental Science and

Industry Application → Activation of NGI Business Application

Execution of Grid Application Project

Emerging Industry: IT, BT, NT, ET, etc.

Industry: Semiconductor, Car, Steel, Machinery, etc.

Supercomputers

N*Grid

GRID Project

Large capacity Storages

Survey & Support

Research Instruments

(NGI Killer Appl.)

Creative Experts

Grid Middleware

Internet 1 & 2

High Speed Network/ATM


N grid project 5 6

N*Grid Project (5/6)

  • KISTI is the leading edge institution

  • Selected research partners from academia, industry, and government lab through a public competition

    • 13 partners in constructing Grid infrastructure (e.g., Construction of national supercomputer Grid)

    • 8 partners in Grid middleware researches (e.g., Grid technology for high-end Grid environment)

    • 10 partners in Grid applications R&D (e.g., Virtual Wind Tunnel using Grid)

    • 2 partners in Grid standardization of Grid middleware technology (e.g., GridIR WG, DAIS WG)


N grid project 6 6

N*Grid Project (6/6)

  • GFK (Grid Forum Korea)

    • The Grid organization in Korea (878 members from 254 organizations & 25 WGs as of Aug. 2003)

  • Its support is included in the N*Grid project

    •  GFK 2002 Summer Workshop (July 11-12, 2002, 280 participants)

    •  GFK 2002 Winter Workshop (Dec. 10-11, 2002, 200 participants)

    • GFK 2003 Summer Workshop (Aug. 19-21, 2003, 220 participants)

Working Groups

Application Area : 10 WGs

Middleware Area : 6 WGs 

Network Area : 2 WGs

Etc.: 7 WGs

Participating Individuals

Government Institution :41

University : 95

Research Institute : 475

Industry : 267


Driving status of n grid project in korea

Plans for Activating N*Grid


Plans implementation of grid testbed 1 2

Plans – Implementation of Grid Testbed (1/2)

  • Implementation of Computing Grid Testbed

    • Public supercomputer: 8

    • HPC PC Cluster: 8

KIST

UOS

KIAS

KMA

SNU

KISTI

SAIT

KAIST

KISTI

CNU

POSTECH

KOREN, APII, TEIN, STARTAP KREONET2, HPCNET

KJIST

PNU

DIU

Supercomputer

Cluster


Plans implementation of grid testbed 2 2

KNU

KRIBB

PNU

KISTI

KIST

Plans – Implementation of Grid Testbed (2/2)

  • Implementation of Access Grid Testbed

    • Large Scale Storage: 8

    • VR System: 3

    • Access Grid System: 3

EVL

KMA

SNU

NCSA

KMA

SAIT

KISTI

Grid Middleware

KISTI

CNU

KOREN, APII, TEIN, STARTAP KREONET2, HPCNET

Access Grid

System

KJIST

VR System

Storage


Plans development of grid system 1 4

Plans – Development of Grid System (1/4)

  • Development of N*Grid Portal System

    • Providing Grid log-in, distributed file transfer, collection and integration of results, monitoring of Grid resources & jobs, etc


Plans development of grid system 2 4

Grid Advanced Information Service(GAIS)

Request Distributor

Missing Info.

Query

Participation

Processing

Processor

Manager

Agent

Service

Resource

Service

VO info

Desc.

info

data info

Resource

Service

Service

VO

Resource

Info.

Data

Registry

Manager

manager

Manager

Manager

Manager

GAIS backend

Grid

Grid

Resource

Resource

Service

Service

Grid

Grid

Service

Service

Grid

Grid

Resource

Resource

Service

Service

Resource

Resource

VO

1

VO

K

Plans – Development of Grid System (2/4)

  • Development of Grid Advanced Information Service System

    • Providing the integration function of multiple resources query interfaces, dynamic state information, dynamic virtual organization information, etc


Plans development of grid system 3 4

Plans – Development of Grid System (3/4)

  • Development of MoreDream Resource Management

    • Supporting the functions of the Resource discovery, co-allocation, job submission, job monitoring, etc.


Plans development of grid system 4 4

Plans – Development of Grid System(4/4)

  • Development of N*Grid CA System

    • Supporting the functions of the Web-interface, PKI, key automatic generation/management/search, etc.


Plans research on grid applications

Plans – Research on Grid Applications

  • Application Researches on IT+IT, IT+BT, IT+NT, … based on Grid

    • Applications for the large-volume and repeated computation

    • Applications for massively parallel environment which are can divided and analyzed

    • Bio, new drug, ST, NT, ET, Computer Graphic (Rendering), etc.

Examples

  • Construction of bio-informatics portal grid

  • Computational chemistry and Nano materials

  • Molecule simulation of Bio/Nano materials

  • Electronic structure computational Grid

  • Nano materials computational Grid

  • Comprehensive environmental flow model

  • Large-scale finite element analysis technique on GRID environment

  • Design shape optimization technology using virtual wind tunnel based on Grid

  • Realization of virtual design & development Grid system

  • Heat exchanger design under the Grid environment


Plans implementation of grid noc

User Group

User Group

User Group

Plans – Implementation of Grid NOC

  • Construction of Logical Grid Network and Technical Support using National & International Network

MIC

Implementation & Operation

Establish Policies

Resources

GRID

Forum

Supercomputer/Cluster, Visualization System (SeeMore) Science Technology Information DB

C

C

GRID-NOC

  • Bandwidth Allocation

  • User Connecting Control/Management

  • Network Facility Management/Operation

  • Network Security/Engineering

A

B

B

A

Interconnection

Interconnection

KREONet/HPCNet/KREONet2

APII-Testbed

KOREN

  • National Size (Backbone over 15 areas)

  • - Joining Institute: about 300 R&D Institutes

  • R&D Exclusive Korea-Japan and Korea-USA Links

  • Korea-Japan, Korea-Singapore Link

  • Korea-USA Link(via Japan)

  • Backbone over 5 areas

  • Joining Institute: 32 R&D Institutes

Domestic R&D Research Network

A : Requirement of common use of national/international R&D network / Support of scientific technology application resources

B : Requirement of scientific technology application resources / support & sharing of R&D network resources

C: Control of user connection (providing connection channel between domestic R&D network)


Plans strategy for n grid project 1 2

Plans – Strategy for N*Grid Project (1/2)

  • Phased implementation of N*Grid infrastructure

    • Exhibitory implementation from computing Grid

  • Phased plans

    • Year 2002-2004

      • Implementation of Computing Grid

      • Implementation of Grid mobile access environment

      • Research on exhibitory applications

    • Year 2005-2006

      • Implementation of Data Grid

      • Implementation of Virtual Realization Grid

      • Research on specific applications

    • Year 2007-2011

      • Implementation of scientific research equipment Grid

      • Implementation of open Grid


Plans strategy for n grid project 2 2

Plans – Strategy for N*Grid Project (2/2)

Phase I

(2002-2004)

Phase II

(2005-2006)

Phase III

(2007-2011)

Scientific Research

Equipment Grid

Data Grid

Computing Grid

Computing Grid

Data Grid

Computing Grid

Access Grid

Access Grid

Access Grid

Phase

Computing Grid

Access Grid

Data Grid

Scientific Research

Equipment Grid

I

(2002-2004)

Medium and large size computing centric

Access Grid system centric

Storage centric

Electron microscopy

II

(2005-2006)

Including medium and small size computer

Virtual realization system centric

DB centric

Electron liner accelerator

III

(2007-2011)

Supporting mobile Grid

Integration of Access Grid

Integration of Data Grid

Virtual wind tunnel equipment


Plans milestones

Main Contents

Phase 1

Phase 2

Phase 3

2007 - 2011

2002 - 2004

2005 - 2006

Testbed

- Computing Grid Testbed

. Medium and large size computer centric

. Medium and small size computer inclusion

. Supporting mobile Grid

- Latest Access Grid Testbed

. VR Grid

. Access Grid

. Data Grid

- Scientific Research Equipment Grid Testbed

. Electron microscopy

. Liner accelerator

. Virtual wind tunnel equipment

Applications

and

System Development

- Research on Grid Applications

. Research on exhibitory applications

. Research on specific applications

- Development of Grid System

. Grid Portal

. GNOC system

. Collaborative VR System

. Mobile Grid Access System

Plans – Milestones


Summary

Summary

  • The goal of the N*Grid project is to build a national Grid infra as a high performance research cyber infra.

  • The N*Grid project is to enhance research productivity in the fields of science and technology.

  • The future direction of N*Grid project will be emphasized on the activation of Grid technology research

    - by participating in GGF WG/RGs for the international

    Grid technology standardization,

    - by implementing international standard Grid testbeds, and

    - by developing of Grid Middleware and applications.


Driving status of n grid project in korea

Thank you for your kind attention.

For more information,

http://www.gridforumkorea.org