Retrofit for treatment of EDCs in the Easton wastewater treatment plant. Presented by: Eric Backlund, Dan Kucz, Dan Weaver a.k.a. WeriK, Inc. for CE372. Objectives. Gain an understanding of EDCs in our environment Analyze possible methods of treatment for EDCs

Download Presentation

Retrofit for treatment of EDCs in the Easton wastewater treatment plant

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Retrofit for treatment of edcs in the easton wastewater treatment plant

Retrofit for treatment of EDCs in the Easton wastewater treatment plant

Presented by:

Eric Backlund, Dan Kucz, Dan Weaver

a.k.a. WeriK, Inc.

for CE372


Objectives

Objectives

  • Gain an understanding of EDCs in our environment

  • Analyze possible methods of treatment for EDCs

  • Choose an applicable retrofit for Easton wastewater treatment plant based on the multidisciplinary approach with Lehigh Carbon Community College (LCCC) and DeSales University

  • Provide costs of implementation for the retrofit


Endocrine disrupting chemicals edcs

Endocrine Disrupting Chemicals (EDCs)

  • Over 87,000 kinds found in the environment (Scruggs, 2004)

  • Proven harmful to wildlife – proven harmful to humans in high concentrations

  • Should be treated in wastewater from a societal standpoint, according to LCCC students

  • Should be limited to 0.1 parts per trillion (ppt) from a biological standpoint, according to DeSales University students


Methods for treatment

Methods for Treatment

  • Ion exchange/Chemical Precipitation

  • Chlorination

  • Ultraviolet

  • Ozonation

  • Osmosis/Membrane (filter)

  • Activated Carbon adsorption

    • Why?

      • Effective at removing wide range of EDCs

      • Applicable to full-scale implementation


Environmental aspect

Environmental Aspect

  • Received a wastewater sample from Easton Wastewater Treatment Plant

  • Spiked the water with Estradiol, E2 to heighten the estrogen concentration

  • Tested different amounts of carbon

    • Filtrasorb 600

    • Carbsorb 40

  • Data analysis was done to get values for calculating the cost of the carbon


Environmental aspect cont d

Environmental Aspect Cont’d…

  • Cost calculations were run for the four carbons provided to us

  • GAC Costs

    • Carbon 1 -- $8.46 per day

    • Carbon 2 -- $9.20 per day

    • Filtrasorb 600 -- $139,841.14 per day

    • Carbsorb 40 -- $45,486.95 per day

  • PAC Costs

    • Carbon 1 -- $992.61 per day

    • Carbon 2 -- $60.22 per day

    • Filtrasorb 600 -- $202,427,912.29 per day

    • Carbsorb 40 -- $221,294,385.80 per day


Site description

Site Description

Easton Wastewater Treatment Plant

  • Located on Route 611 between I-78 and the Delaware River

  • Serves ~56,000 people (Water Partnership Council, 2001)

  • ~4-5MGD operational flow rate


Design criteria

Design Criteria

  • 10MGD max flow rate

  • 10 year lifespan

  • Activated Carbon adsorption treatment process

    • Granular activated carbon (GAC)

      • Columns

      • Regeneration of carbon

    • Powder activated carbon (PAC)

      • Mix into water

      • Increased sludge removal in secondary clarifiers

  • 2 part GAC/PAC system


Recommendations for design

Recommendations for design

  • Design GAC treatment for 6.5MGD based on population increases over the past 50 years in the Allentown-Bethlehem-Easton area (CensusScope, 2000)

  • For remaining 3.5MGD, implement a PAC mixer box…PAC can be used in emergency situations and during regeneration periods

  • 5 GAC columns at 15.5’ width each, in parallel flow

  • PAC mixer box installed at current flow division box


Locations for implementation

Locations for implementation

GAC

  • Near chlorination tanks

PAC

  • Near flow division box

PAC

GAC


Costs of retrofit to users

Costs of retrofit to users

PAC

GAC

TOTAL COST TO USERS: $4.17 per person/yr


Any questions

Any Questions???