AARAS SHIPPING AGENCIES PRIVATE LIMITED Break Bulk, Heavy Lift, ODC, Ro-Ro & Project Cargo Experts in Pakistan. New EVENT AT Port Muhammad Bin Qasim Pakistan. Uch POWER PROJECT.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha

Download Presentation

New EVENT AT Port Muhammad Bin Qasim Pakistan

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


AARAS SHIPPING AGENCIES PRIVATE LIMITEDBreak Bulk, Heavy Lift, ODC, Ro-Ro & Project Cargo Experts in Pakistan.


New EVENT

AT Port Muhammad Bin Qasim Pakistan


Uch POWER PROJECT

AARAS SHIPPING AGENCIES (PVT) LTD are proud to announce that we have successfully handled the 2nd Part of UCH PowerProject vessel into our agency with complete logisticssolution till site.

Vessel particular’s are:

M.V. FREDENSBORG

Port of Loading;Kusan Korea

Port of Discharge;Port Mohammad Bin Qasim

Commodity;Condenser, HSD Electric heater, Boiler feed Pump, Condensate Extraction pump, control valves and Auxiliaries

Total Packages; 55 Pkgs

Total Cargo Weight;395.310 Mtons


BERTHING OF THE VESSEL;

The Vessel M.V. “Fredensborg” berthed MW-3 Port Muhammad Bin Pakistan on 14th Dec 2012 at 1200 hrs.


CARGOES ON THE VESSEL;

The vessel carrying 55 package of Condenser, HSD Electric heater, Boiler feed Pump, Condensate Extraction Pump, Control valve and other auxiliaries of Steam Turbine Generator with Gross Weight 395.310 Mtons and 1775.72 CBM


DISCHARGING THE CARGOES;

The discharging process was commenced at 1200 hrs on 14th Dec 2012 and Completed at 0720 hrs on 15 Dec 2012. We finished the whole process of discharging within 19 hrs.


TRANSPORTATION OF CARGOES;

Transportation of these equipment’s made through low bed trailer and rest of onto standard trailer for the 595 kilo meter inland to project site.


Contact Us;

…..AARAS – READY FOR ACTION –

Whatever you’re planning, we’re there for you!!

701, 7th Floor, Business Plaza, Mumtaz Hassan Road,

Off I.I. Chundrighar Road, Karachi – 74000, Pakistan.

Tel: +92-21-32415450-1 Fax: +92-21-32420412

E-mail: info@aarasshipping.com

Website: www.aarasshipping.com