Dfs projekt adq aeronautical data quality
This presentation is the property of its rightful owner.
Sponsored Links
1 / 14

DFS Projekt ADQ – Aeronautical Data Quality PowerPoint PPT Presentation


  • 158 Views
  • Uploaded on
  • Presentation posted in: General

DFS Projekt ADQ – Aeronautical Data Quality. ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS. DFS Projekt ADQ – agenda. Basic P arameters Analysis of current stage DFS´s strategy Milestones.

Download Presentation

DFS Projekt ADQ – Aeronautical Data Quality

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Dfs projekt adq aeronautical data quality

DFSProjekt ADQ – Aeronautical Data Quality

ADQ Implementation Workshop

Brussels – 28./29.May 2013

Anette Grossmann-Jorschik, Projectmanager DFS


Dfs projekt adq aeronautical data quality

DFS Projekt ADQ – agenda

  • Basic Parameters

  • Analysis ofcurrentstage

  • DFS´sstrategy

  • Milestones


Basic parameters eu regulation and possible means of compliance moc

Basic ParametersEU Regulation and possible Means of Compliance (MoC)

DO

DQR

AIX

DAL

eAIP

DFS, Projekt ADQ


Basic parameters key findings of the planning phase

Basic ParametersKey findings of the planning phase

ADQ requires electronic andstructureddata in definedqualityrightfromthedatageneratinginstance.

The data must bemadeavailable in good time andwithoutanyloss in qualityto all involvedinstances.

Every singlestep in a processand all involvedinstancesandpersons must bedocumentedandverified.

Cannotbeachievedwithoutmodifyingthe IT-Infrastructure of DFS (GDV, CNS-AA, HDB)!

DFS, Projekt ADQ


Analysis current stage adq what to do

Analysis current stageADQ – What to do ...?

DFS, Projekt ADQ


Analysis of current stage it landscape

Analysis of current stage IT-landscape

Geo-Informations

Systeme

EAD

System

Airspace- and Performance planning

Aeronautische Datenbank

Systems

AIP-ProdukcionandPublication

Obstacle Data Base

Externaldatasupplier (authorities, Airports)

CNS-dataarchiv

Datenkonsumierende Systeme DFS

Action to be taken

Nicht für

ADQ-1

relevant

Datenkonsumierende Systeme extern

System Frequency-management


Dfs s adq strategy design principles of the planning phase

DFS‘s ADQ Strategy Design principles of the planning phase

  • Identify and document media breaks and manual data entry in the IT application environment of DFS

  • Adjust the affected processes through standards of Aeronautical Data Processing

  • Identify and resolve redundancies in data management and consolidation of historically grown databases

  • Wherever possible standards, open interfaces and COTS products should be required


Dfs s adq strategy key measures of the planning phase

DFS‘s ADQ Strategy Key measures of the planning phase

  • Analysis and conceptual implementation of Regulation 73/2010, executive rulesand Guidelines ADQ (> 700 pages)

  • Analysis and documentation of the application environment for handling of “Aeronautical Data„

  • Basic concept of an interface for data exchange with Airports

  • Design of a consolidated IT architecture for aeronautical data

  • Design of a master process (process patterns) for handling of aeronautical data (creation, format changes, forwarding, verification, validation and authentication)


Dfs adq strategy adq dfs s conceptual approach for theit it landscape

DFS ADQ StrategyADQ – DFS‘s conceptual Approach for theit IT-landscape

Data managementprocess

systems

EAD

Externaldatasupplier

(authorities, airports,

ANSPs via EAD)

Aeronautical Database

Systems

AIP-productionandpublishing

Data supplyinterface (AIXM)

Data provisioninterface

Data consumingsystems DFS

Data supplyingsystems DFS

Is not relevant to

ADQ-1

Externaldataconsumingsystems

Verification

systems

DFS, Projekt ADQ


Dfs projekt adq aeronautical data quality

DFS´s ADQ StrategyTarget-IT landscape with a DFS- wide AIM Process (according article 6 VO EU 73/2010)

ADQ compliant

DFS Deutsche Flugsicherung GmbH, GB AIM


Dfs s adq strategy integration of external partners example airport ansp

DFS‘s ADQ StrategyIntegration of external Partners: Example: AirportANSP

AIM-Process

(DAL-Process)

DataRequest

Data Set -Format AIXM 5.x

Airport

ANSP

Direct electronic Connection

AIP

Push / Pull – Exchange

Data Provider / Consumer Agreement

Service Level Agreement

Process Integration Authority?

Data Delivery

Authority

DFS, Projekt ADQ


Dfs s adq strategy adq dfs s internal concept for their new it architecture

DFS‘s ADQ StrategyADQ – DFS‘s Internal Concept for their new IT-Architecture

  • Meetsrequirementsof VO (EU) 73/2010

  • Data setformat

  • Data exchangeformat

  • Data protection

Effectivlysupportsthenewlydesigned, cross-cuttingAIM-Data Management-Process

Dokumentation der relevanten Ist-Anwendungslandschaft (Systeme, Schnittstellen, Daten, Integration)

Konzeption einer

ADQ-konformen und optimiertenSoll-Anwendungslandschaft

Technische Anforderungen aus VO 73/2010 (und MOC)

Anforderungen aus dem neu entworfenen AIM-DM-Prozess

  • Is sustainable so astosupportthe ICAO-strategyfrom AIS to AIM

  • Supports theprinciple: Data orientationinsteadofproductorientation

  • Is open forstrategicdevelopments (e.g. SOA, SWIM)

Realisesconsolidationandoptimization potential in today´sheterogenousapplicationenvironment

Needs foraction in theapplicationenvironment

Most economicalsolutionconcerningthecostdrivers

  • Satisfiesthe EAM-principlesof DFS

  • Satisfiesthestandardsof DFS

Technische und architekturbezogene Rahmenbedingungen

Wirtschaftliche und organisatorische Rahmenbedingungen

DFS, Projekt ADQ


Milestones projectplan timetable realisation phase

MilestonesProjectplan timetable realisation phase

July 1st 2014Nesessary IT-technical

aspectsare

implementedforverification

ofthecompliance

July 1st 2013 The Regulation enters

intoforcefornew

aeronauicaldateand

information

June 30th 2017Existingdata must

be ADQ-compliant

2014

2015

2012

2013

M831.12.2015

Completion

of

project

ADQ

M111.12.2012PA 2 approved

M330.06.2013DFS-

processes are

documented ADQ-

compliantly

M431.03.2014

Consolidated

and ADQ-

Extended

AERO DB is

functional for

test operations

M530.06.2014

DFS-

IT-systems

and processes

are ADQ-

compliant

M631.03.2015

Final test for

replacement

of

decentralised

IT-systems

M730.06.2015

Replacement

of legacy

systems,

end of project

ADQ

M231.03.2013 IDS-Demonstrator is functional

DFS, Projekt ADQ


Dfs projekt adq aeronautical data quality

Thank you for attention.

DFS, Projekt ADQ


  • Login