Maintenance and Accelerator Support

Maintenance and Accelerator Support. RHIC Run 12. RHIC species change completed:. Major works in RHIC: Power supply reconfigure (DO polarity at 6 and 8 o’clock). Ramp setup and commissioning. PHENIX drift chamber repair. RF repair. E-lens feed through. Stochastic cooling work.

tuyet
Download Presentation

Maintenance and Accelerator Support

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Maintenance and Accelerator Support RHIC Run 12

  2. RHIC species change completed: • Major works in RHIC: • Power supply reconfigure (DO polarity at 6 and 8 o’clock). • Ramp setup and commissioning. • PHENIX drift chamber repair. • RF repair. • E-lens feed through. • Stochastic cooling work.

  3. Maintenance Tomorrow • Installation and commissioning at a minimum. • Maintenance items for RHIC to be completed in ~4 hours. • AGS access for RF repair and maintenance 0800-1000hrs • LINAC and Booster to run for NSRL and BLIP (1 hour interruption to BLIP in the morning).. • Complete details discussed here at 1430hrs today.

  4. Schedule in Brief