An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Carbon Partnership Facility April 2014 Seller Participant Training Monitoring and Verification

  2. Topics of the session Monitored data Monitoring process Verification Issuance • Data flow • Calculations • CDM aspects • Objectives • Organization • Roles and responsibilities • Means of control • Preparation Stakeholders • Audit process • MR Writing • Documents • UNFCCC process

  3. 1. Monitored data • Data flow • Calculations • CDM aspects

  4. Monitored data Description of data flow in CDM Physical phenomenon (Flow, temp, etc…) Automatic Measurement Data Logger Manual Measurement Data Record Manual Log CDM instrument CDM database Scans Back Up database Back up policy

  5. Monitored data Landfill gas projects

  6. Monitored data Data flow: landfill gas projects Flow, %CH4, pressure, temperature, efficiency of destruction, electricity consumption Automatic Measurement Data Logger Manual Measurement (electricity consumed) Data Record Manual Log Flow meter, gas analyzer, T & P sensors, thermocouple, electricity meter CDM database Scans Back Up database Back up policy

  7. Baseline emissions: Amount of CH4 actually destroyed Principle: amount of LFG x % of CH4 in LFG x efficiency of the destruction Formula: LFGflare,y x wCH4 x DCH4 x FE Electricity generation (quantity of tCO2 “avoided”) Principle: quantity of electricity actually delivered to the grid x emissions factor of the grid Formula: ELLFG (MWh) x EFEL (tCO2/MWh) Project emissions: Electricity consumption Principle: quantity of electricity actually consumed x emissions factor of the grid Formula: PEEC,y = ECPJ,y x EFEL x (1 + TDLy) Fuel consumption Principle: quantity of fuel actually consumed x emissions factor of the fuel Formula: PEFC,y = FCi,j,y x NCVi,y x EFCO2,i,y Understanding the logic behind data

  8. Monitored parameters must be: Recorded automatically when continuous monitoring is required Exhaustive Consistent Analyzed Unalterable Auditable Backed up Archived CDM aspect of data and calculations Calculations must be: • Reproducible • Strictly compliant with the PoA-DD / CPA-DD • Computed on a regular basis (monthly or weekly) • You must be able to know almost in real time how much CERs are generated • You must be able to spot an inconsistency and take a corrective action as quick as possible

  9. Inconsistencies: Record of 105% methane in the LFG Flare temperature of 1999°C Inconsistent daily electrical consumption because the reading was monitored in kVAr instead of kWh Negative electricity consumption based on manual readings Flow recorded when flare / genset off Fuel consumption much higher than diesel generators’ technical specifications (due to fuel robbery) Fixed value of flow every minute for several days, etc. Loss of data: Failure of the memory card Signal disruption Reset of the system Loss of the onsite computer where the system was installed and data stored Potential data issues: examples

  10. 2. Monitoring process • Objectives • Organization • Roles and responsibilities • Means of control

  11. Objectives: Generate ER at CPA level and issue CERs for the overall program for all CPAs Ensure monitored data is controlled and inconsistencies are spotted out immediately Implement a standard organization and reporting for all CPAs of the program Define clear monitoring responsibilities Maintain direct communication between CME and CPA Operators Maintain CPA / PoA database up to date Avoid calibration delays Manage the Information Systems: Automated data capture / Machine-To-Machine protocols Back up policy (at CME level) Monitoring process

  12. Monitoring process • Organizational structure CME – main responsibilities: CDM, financing, management CDM & Carbon Finance Director IT officer CDM PoA Manager Support World Bank CDM Expert Monitoring Manager Monitoring Manager Monitoring Manager LFG plant technician and manager LFG plant technician and manager LFG plant technician and manager CPA 1 CPA 2 CPA-3 CPA Implementers – main responsibilities: plant operations

  13. Roles and responsibilities: CPA level Plant technician and manager: operation and maintenance Network adjustment: wells regulation, leak inspection, cover, etc. Monthly and daily reports Manual logs Calibrate equipment or organize external calibration Ensure availability of spare parts Extract raw data from data logger Etc. Monitoring manager: centralize and analyze CDM information from site operations Prepare monitoring records Compute CER calculations Upload CDM information in data base Prepare calibration planning at CPA level Focal point for communication with CME Monitoring process

  14. Roles and responsibilities: PoA level CDM PoA Manager: CDM compliance and CDM documentation of the PoA Verify the CDM compliance of each CPA Verify that CDM documents are available and up to date in the database Means of control: fill in QA/QC checklist Focal point with the Monitoring Manager at CPA level Prepare the Monitoring Report Manage verification with DOE Inclusion of new CPA IT administrator: management of data base Create a documents repository: data base shared between CPA Implementers and the CME Prepare a folder structure Manage write / read only access Back up policy Monitoring process

  15. Roles and responsibilities: The World Bank: CDM expertise Information on CDM updates Advice on selection of DOE Technical review Sporadic help or advice for PoA management Monitoring process

  16. Monitoring process • Monitoring information: from CPA to CME CPA Operator CME CDM & Carbon Finance Director Plant technician Monitoring Manager CDM PoA Manager CDM equipment Manual logs, operations mainte-nance Monitoring records QA / QC Checklist Data logger Supervision Management PoA Database

  17. Means of control : At CPA Level: Monitoring Records For each CPA, synthetic means of information which is relevant for CDM and verification. CER Production Electricity consumed (and generated if applicable) Calibration Instruments ID Accreditation and training At CME level: QA / QC checklist Excel tool to verify every month that: Information from site operations is reported in the Monitoring Records Documents are available in the data base shared between CPA Implementers and the CME Problems on site are reported and followed Monitoring process

  18. Means of control: Steering committees Regular direct communication between CME and CPA Implementers Review progress Solve investment related issues Spot checks and mock verifications There is no better way than to go onsite to understand the project CME should organize “real case” quality control: onsite check of the CPA Pre-audit: verify the level of CDM issuance readiness of the project Ensure that the plant is operated and monitored as described in the CPA-DD Monitoring process

  19. 3. Verification • Preparation • Stakeholders • Audit process • MR writing • Documents

  20. Coordination CME / World Bank: choice of DOE and timing  Align verification with ERPA and previous verification CME / CPA Operator(s): readiness, availability Organization and responsibilities The CME will focus on CDM management Manage DOE Write and modify MR Make sure supporting evidences and monitored data are available The CPA Operator will focus on site operations History of project operations Prepare all supporting evidences Organize logistics on site (transportation, accommodation, meals) Audit preparation

  21. Site visit The CDM PoA Manager of the CME should go onsite prior to the DOE to: Verify the project operations Ensure CDM equipment is in place and properly functioning Collect last minute missing documents Trains the CPA operator staff: How to answer to auditor’s questions No document should be given to the auditor because they will all be channeled by the focal point at the end of the visit Verification documents Exhaustive Up to date Available on a DEDICATED shared directory Audit preparation

  22. Stakeholders for the verification CME UNFCCC CPA DOE WB

  23. Audit process CME prepares the MR ; WB helps and reviews the MR CME sends MR and ER summary to DOE If MR is ok, DOE uploads MR to UNFCCC website Wait 2 weeks before site visit CME sends initial package of documents to DOE Site visit CME, CPA Implementer and DOE discuss issues found on site (preliminary findings) DOE officially sends findings / protocol to CME CME answers requests and prepares and gathers additional documents CME sends everything in one shot: duly answered protocol + supporting evidences DOE reviews the responses and prepares the DVR When all CAR and CL are closed, auditor sends the DVR to I/TR for internal / technical review New questions raised by TR  2nd round of questions and answers When 2nd round (or more) is closed, DOE prepares the FVR CME, World Bank and DOE review the final documents to correct errors and inconsistencies DOE final review and approval DOE sends final documents to UNFCCC: MR, FVR, ER

  24. Audit process Highlights: Basic principle of audit: all information must be supported by an evidence All information provided to the DOE must be clearly denominated in English Key information should be translated in English if available only in other language: dates, justifications, explanations etc. Give to the auditor only documents that you (the CME) have checked Focal point: there is only one channel of communication with the DOE Send the DOE all the answers + documents in one shot The style of answers to the CAR / CL should be formal and neutral Refer to the VVS (p 43-63) to understand the DOE’s questions Facilitate the work of the auditor: clear package of documents, information easy to verify, anticipate the questions etc.

  25. How to prepare a MR? Refer to the following documents: Monitoring Report writing

  26. Monitoring Report writing Highlights: Use the latest MR template. Refer to the UNFCCC website: https://cdm.unfccc.int/Reference/PDDs_Forms/index.html#proj_cycle “F-CDM-MR - Monitoring report form”. For a PoA, one or two MR can be submitted for the monitoring period The MR form cannot be altered (font, headings etc.) English only International System of Units: dates dd/mm/yyyy and numbers 1,000.00 The style should be formal and neutral The MR guidelines give the precise information required by the UNFCCC: don’t add any further information

  27. Monitoring Report writing Key content Section A: general information on the project Refer to the CPA-DD Section A. Information also available on the project webpage at cdm.unfccc.int Section B: implementation of the project Describe the state of operations at the time of verification (e.g. only one flare has been installed yet). Describe the official post-registration changes: corrections, deviations etc. Section C: description of the monitoring system Diagram showing the different points of measurements Short description of the recording system (data logger, etc.)

  28. Monitoring Report writing Key content Section D: data and parameters D.1: fixed parameters  refer to section B.5.1 of the registered CPA-DD. Put only the parameters that are used for the monitoring period. For example, for landfill projects: include GWPCH4 or DCH4, but not φ, OX, DOCf, MCF, k… D.2: monitored parameters  refer to section B.6.2 of the CPA-DD. List the same parameters and provide technical specifications of the instruments used to monitor the parameters. This is the main section. Section E: calculation of ER Report the main formulas (copy/paste from CPA-DD) Report the end result of BE, PE and ER for the monitoring period.

  29. Verification documents Organize documents by “package”: Monitoring report and ER summary Compilation / summary of monthly BE / PE / ER result for each CPA and total BE / PE / ER for the monitoring period for each CPA Raw data – if applicable Monthly files extracted from the data logger in Excel format. Should be directly traceable to the original source 3. Emissions reductions calculations Monthly ER calculation spreadsheets for the entire monitoring period, per CPA 4. One folder per CDM instrument, each one containing: Manual  verify manufacturer, type, model, accuracy, calibration information Calibration reports  verify calibration dates and validity Information on calibration frequency if not included in the manual

  30. Verification documents Organize documents by “package”: Other documents Commissioning certificate Training certificates Organizational documents, e.g. procedures, operation manual Main equipment specifications (flare, genset) Electricity invoices for cross-check

  31. 4. Issuance UNFCCC Process

  32. From verification to issuance What happens when the verification is over? DOE uploads FVR, MR and ER to UNFCCC website. The project is visible in this section: http://cdm.unfccc.int/Issuance/completeness_check.html but the documents are not visible RfI starts after a few weeks of waiting line (“awaiting scheduling”), usually 1 month Then 1 week of Completeness Check 3 weeks of Information and Reporting Check 4 weeks of Issuance Request, the project documentation is now publicly available Issuance of credits TOTAL 3 months at the UNFCCC

  33. Training on CDM Operations Plans and Sub-ERPA Contracting • Washington D.C., USA, 2nd April 2014 anne-sophie.zirah@ably-carbon.comstephane.vidaillet@ably-carbon.com