FAIR project status. Establishment of the FAIR GmbH Accelerator construction Civil construction. Outline:. The Convention with its five Annexes and the Final Act were prepared and until September very few amendments to these documents were made. 16 th FAIR ISC meeting on May 14 th.

Download Presentation

FAIR project status

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Fair project status

FAIR project status

  • Establishment of the FAIR GmbH

  • Accelerator construction

  • Civil construction

Outline:

CBM Collaboration Meeting, Dubna, Zbigniew Majka


16 th fair isc meeting on may 14 th

The Convention with its five Annexes and the Final Act were prepared

and

until September very few amendments to these documents were made.

16th FAIR ISC meeting on May 14th

  • 18th FAIR ISC meeting on September 3rd

The FAIR ISC lernt that on September 8 was scheduled a meeting between combined delegation of XFEL ISC and BMBF with the representatives of several Russian ministries, led by Dr V. V. Nichkov, Director at the Ministry of Education and Science of the Russian Federation.

The objective of the meeting was to agree on the final versions the XFEL Convention and the Articles of Association.

Russian Delegate informed FAIR ISC that the Russian Side would like to have the founding documents for both projects (the Convention, the Articles of Association) as close as reasonable.

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Letter to fair isc from the chairman jacek gierlinski 11 th sept 2008

”......Simultaneously I have asked Prof. Ö. Skeppstedt, AFI Chairman to undertake the review of these documents at the AFI meeting on 22nd September and prepare their final versions for approval by this Committee....”

Letter to FAIR ISC from the Chairman Jacek Gierlinski, 11th Sept. 2008

The FAIR JCT, with active involvement of the officials from BMBF, has come up

with the modified versions of the FAIR Convention and the Articles of Association.

The FAIR AFI delegates, at the meeting on 22nd September agreed on these final legal documents and recommend them to FAIR ISC.for approval at the meeting on October 1st 2008.

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Resolutions from 19 th fair isc meeting on oct 1 st 2008

7. Resolution concerning legal documents:

The ISC approves the version of October 1st, 2008 of the FAIR Convention, Articles of Association and the Final Act.

The ISC urges all parties involved to initiate the necessary actions

(translations (due by October 13, 2008) and formal checking of the founding documents) for the intended signing of the FAIR Convention and the Final Act in February 2009.

Resolutions from 19th FAIR ISC Meeting on Oct. 1st , 2008:

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

  • Follow-up of the 19th FAIR ICS Meeting

  • Time table for the translation procedure

  • October 2008

  • 19th meeting of FAIR-ISC: Adopted of founding texts (Convention, Articles of Association, Final Act), finalized at the level of the Steering Committee in the English language

  • 13 October 2008

  • Absolute deadline for the submission to the BMBF of non-English versions of the founding texts (i.e. in Chinese, French, German, Italian, Russian, and Spanish); an earlier submission would be preferred

  • 17 November 2008

  • Termination of the refinement and cross-checking of the various language versions by the Language Services Division of German Federal Foreign Office and dispatch to the Parties concerned

  • 01 December 2008

  • Return of the various language versions counter-checked by the Foreign Offices of the Parties concerned

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

15 December 2008

Dispatch of all language versions, now edited by the German Federal Foreign Office and the Foreign Offices of the Parties concerned, to all Parties

14 -16 January 2009

Cross-checking conference in the German Federal Foreign Office (Berlin) with the aim of producing the final and binding versions of the founding documents (to be initialled at the end of the conference)

February 2009

Signing of the FAIR Convention and the Final Act in Berlin

If any of the above translations shall not reach the German BMBF in time, it will be impossible to include the corresponding state in the first batch of signatories.

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

Next FAIR ISC meetings:

11 November 2008 at GSI.

12 December 2008 in Paris.

Next FAIR-AFI meeting:

21 November 2008 at GSI

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

Mandate of FAIR ISC for accelerator construction:

“Start pre-collaboration on dedicated FAIR accelerators”

Kick Off Meetings on:

SIS100, September 15, 2008

Super-FRS & CR, October 8 and 9, 2008.

  • Conclusions from the meetings:

  • The participating partners are able, willing and prepare to realize their EoIs

  • The present Master Schedule (e.g. first experiments at Super-FRS in 2013/2014)

  • is realisticif work starts in Jan. 2009

  • Taking up the work requires funds to the participating labs.

  • As any in-kind contributor is funded by his agency directly:

  • no cross financing for in-kind contributions

  • some labs expect start of work in 2010 earliest due to information by their

  • funding agencies.

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

Architect Contract Awarded

on July 22, 2008

GSI Director & FCC Head signing the

Contract with Architects “Ion42 GBR”

Also contracts with 14 engineering

Companies („planners“) signed

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

  • Achieved:

  • Application to start ZBau procedure July 2007

  • ISC mandate for GSI to take measures on CC (Sept. 2007)

  • EU-wide call for Steering company

  • Contract award to Drees&Sommer (July 2007)

  • EU-wide call for construction planning (Sept. 2007)

  • Contract award to engineering companies (July 2008)

  • Start planning phase (July 2008)

  • Next Steps

  • Approval documents incl. Drawings for review (Dec. 2008/Jan. 2009)

  • Technical report by hbm (baufachliche Prüfung) (Feb. 2009)

  • Application for building permit (March 2009)

  • Actual cost estimate as part of approval documents

  • Decision (#10 ZBau): Commitment on cost coverage

  • Building permit (Sept. 2009)

  • Call for tender site preparation (2009)

  • Begin site preparation (autumn 2009)

  • Prepare execution documents (March – Dec. 2009)

  • Call for tender construction work (late autumn 2009)

  • Award construction contracts (earliest: end 2009 – beginning 2010…)

  • Begin executive work (early 2010).

Detailed cost estimate

Feb. 2009

Expect 1. building permit: Sept. 2009

Start site preparation:

end 2009

Start “digging / pouring concrete” starts: in 2010

Availability of buildings for start with S-FRS:

end of 2012

Installation and commissioning of SFRS:

up to end 2013

Start first experiments:

End 2013/early 2014

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Thank you

Thank you!

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

CBM Collaboration Meeting, Dubna, Zbigniew Majka


Fair project status

CBM Collaboration Meeting, Dubna, Zbigniew Majka


  • Login