1 / 2

The air-ground VHF communication system of Japan

The air-ground VHF communication system of Japan. Junichi Tanaka Mobile Satellite Communication Division Telecommunications Bureau Ministry of Internal Affairs and Communications, JAPAN 14 th October 2011 25 th ACP WG-F. 1  Introduction.

trynt
Download Presentation

The air-ground VHF communication system of Japan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The air-ground VHF communication system of Japan JunichiTanaka Mobile Satellite Communication Division Telecommunications Bureau Ministry of Internal Affairs and Communications, JAPAN 14th October 2011 25th ACP WG-F

  2. 1 Introduction The air-ground VHF communication system (without the VDL system) of Japan is currently using only the 25kHz channel separation system. However, we are going to revise the Japanese technical scheme on the basis of ICAO ANNEX 10 and RTCA, because Japanese frequencies are very tight. The overview is as follows. <The 25kHzseparationsystem> <The 8.33kHz separationsystem> 25kHz 25kHz Channel separation 8.33kHz Channel separation Channel separation 6kHz 6kHz Band-width Band-width 2Over view -Channel separation: 25kHz and 8.33kHz -Quality: Refer to the ICAO SARPs and the RTCA/DO-186(including 186a and 186b). -Target: Company radio, Life saving, etc. 3Schedule The Ministry of Internal Affairs and Communications of Japan is considering the technical requirement until March 2012. Thereafter, we are going to make the technical scheme, no later than Summer 2012.

More Related