1 / 18

Gas/Electric Coordination Meeting April, 2008

Gas/Electric Coordination Meeting April, 2008. Bill Whaley Vice President Gas Control & Customer Service. Attached Megawatts (MW) 27,586 Total Max Load (MDth/d) 6,308 Total Contracted (MDth/d) Mainline Transportation 996. Spectra Energy Transmission Power Plant Attachments.

trung
Download Presentation

Gas/Electric Coordination Meeting April, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gas/Electric Coordination MeetingApril, 2008 Bill WhaleyVice President Gas Control & Customer Service

  2. Attached Megawatts (MW) 27,586 Total Max Load (MDth/d) 6,308 Total Contracted (MDth/d) Mainline Transportation 996 Spectra Energy TransmissionPower Plant Attachments

  3. TETCO - Perulack/Chambersburg EastSummer Demand

  4. TETCO – Perulack/Chambersburg East Winter Demand

  5. TETCO - Perulack/Chambersburg EastTop 25 Power Plant Summer Days

  6. TETCO - Perulack/Chambersburg East Top Summer Day Growth

  7. AGT Summer Demand

  8. AGT Winter Demand

  9. AGT Top 25 Power Plant Summer Delivery Days

  10. AGT Peak Summer Day Demand Growth

  11. ETNG Summer Demand

  12. ETNG Winter Demand

  13. ETNG Top 25 Summer Delivery Days

  14. ETNG Peak Summer Day Demand Growth

  15. M&N Pipeline Top 25Power Plant Summer Delivery Days

  16. Number of Times Invoked Total Number of Days Required Texas Eastern 3 31 days Algonquin 3 38 days Maritimes & Northeast 3 38 days East Tennessee 1 21 days Order 698 Invoked During Winter 07/08 Spectra implements the requirement of receiving the hourly burn profile from directly connected electric power generation facilities only as operationally needed.

  17. AGT 698 Impact

  18. TETCO M3 698 Impact

More Related