Eva Vallada, Rubén Ruiz

A genetic algorithm for the parallel machines scheduling problem with sequence dependent setup times and weighted earliness-tardiness minimisation. Eva Vallada, Rubén Ruiz. INSTITUTO TECNOLÓGICO DE INFORMÁTICA GRUPO DE SISTEMAS DE OPTIMIZACIÓN APLICADA UNIVERSITAT POLITÈCNICA DE VALÈNCIA.

truman
Download Presentation

Eva Vallada, Rubén Ruiz

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A genetic algorithm for the parallel machines scheduling problem with sequence dependent setup times and weighted earliness-tardiness minimisation Eva Vallada, Rubén Ruiz INSTITUTO TECNOLÓGICO DE INFORMÁTICA GRUPO DE SISTEMAS DE OPTIMIZACIÓN APLICADA UNIVERSITAT POLITÈCNICA DE VALÈNCIA HAROSA 2012, Barcelona June 13-15

  2. Outline • Introduction • Objectives • MIP mathematical models • Genetic algorithm • Computational experiments • Conclusions

  3. Introduction UNRELATED PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES • A set ofnjobs has to be processed on exactly one machine out of a set of mmachines • Unrelated parallel machines: the processing times of the jobs depend on the machine to which they are assigned to • Setup times: machine and job sequence dependent setup times • Most common objective: minimisation of the maximum completion time of the jobs or makespan (Cmax)

  4. Introduction UNRELATED PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES • More realisticobjective: basedondue dates • Letdj be thedue date of a jobj: • Thetardinessisdefined as: Tj= max{Cj -dj , 0} • Theearlinessisdefined as: Ej = max{dj - Cj, 0}

  5. Introduction UNRELATED PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES

  6. Introduction

  7. Objectives • To propose an effective Genetic Algorithm for the unrelated parallel machine scheduling problem with setup times, minimising the total weighted earliness-tardiness objective • To evaluate and compare several versions of the proposed method and also against two mathematical models

  8. MIP mathematical models • Anadaptedversion of thatproposedbyGuinet, A. (1993). Schedulingsequencedependentjobsonidenticalparallel machines tominimizecompletion time criteria. International Journal of ProductionResearch, 31(7), 1579-1594. • Anadaptedversion of thatproposedbyBalakrishnan, N., Kanet, J.J., and Sridharan, V. (1999). Early/tardyschedulingwithsequencedependentsetup times onuniformparallel machines. Computers & OperationsResearch, 26(2), 127-141.

  9. MIP mathematical models • More details about the adapted versions in Vallada, E. and Ruiz, R. (2012). Scheduling unrelated parallel machines with sequence dependent setup times and weighted earliness-tardiness minimisation. In Just in Time Systems. Springer. Edited by Roger Z. Ríos-Mercado and Yasmín A. Ríos-Solís.

  10. Genetic algorithm • Representation of solutions: foreach machine anarray of jobsthatindicatestheprocessingorder • Initialisation of thepopulation: • MultipleInsertionheuristic + Random • Multiple insertion (MI) heuristic (Kurz and Askin, 2001): inserts each job into every position of every machine Machine 1 Machine 2

  11. Genetic algorithm • Initial Population • While Not TerminationCriteria do • Selection • Crossover • Mutation • Offspring Evaluation • Offspring Local Search • Offspring Acceptance • End While

  12. Genetic algorithm • Initial Population • While Not TerminationCriteria do • Selection • Crossover • Mutation • Offspring Evaluation • Offspring Local Search • Offspring Acceptance • End While • Idle Time Insertion (postprocess)

  13. Genetic algorithm • Initial Population • Idle Time Insertion • While Not TerminationCriteria do • Selection • Crossover • Mutation • Offspring Evaluation • Idle Time Insertion • Offspring Local Search • Idle Time Insertion • Offspring Acceptance • End While

  14. Genetic algorithm • Selection Operator: n-tournament • A given percentage of the population is randomly selected (pressure) • Crossover Operator: • For each machine one position p is randomly selected from the father • Offspring 1 from 1 to p • Offspring 2  from p + 1 to the end • Missing jobs from the mother are inserted at the end of the partial sequence • Mutation Operator: • A machine is randomly selected • A job is randomly selected, removed and re-inserted in a random position in the same machine

  15. Genetic algorithm • Local Search • Inter-machine insertionneighbourhood (IMI) • Forallthe machines, allthejobs are inserted in every position • A jobfrom a given machine iisextracted and insertedintoall positions of allother machines, excepti • Thejobisfinally placed in thebest position (minimumweighted total earliness-tardinessvalue)

  16. Genetic algorithm Acceptance of movements in the neighbourhood • Inter-machine: • TWET of both affected machines is reduced:movement accepted • TWET of one machine is reduced and TWET of the other machine is increased: • Movement accepted if TWET reduced in one machine > TWET increased in the other machine and the TWET value (for all machines) is not increased • Offspring Acceptance • The offspring are accepted into the population if they are better than the worst individuals and they do not already exist in the population

  17. Genetic algorithm Idle time insertion • procedureIdle Time Insertion • Foreach machine m do • whilenot false do • Findthefirstearlyjob in m • Compute the sum of weights of theearlysubsequentjobs (TotalWE) • Compute the sum of weights of thetardysubsequentjobs (TotalWT) • Compute theminimumearlinessamongalltheearlyjobs (MinEarly) • IfTotalWE> TotalWTthen • InsertMinEarlyIdle times justbeforethefirstearlyjob • Compute the new Total WeightedEarliness-Tardinessvalue • EndIf • Else • Break • EndWhile • EndFor • End

  18. Genetic algorithm

  19. Genetic algorithm

  20. Computational Experiments • Genetic algorithm without Idle Time Insertion: GANoIdle • Genetic algorithm with Idle Time Insertion (postprocess): GaIdlePost • Genetic algorithm with Idle Time Insertion inside the algorithm (standard parameters): GAIdleSt • Genetic algorithm with Idle Time Insertion inside the algorithm (calibrated parameters): GAIdleCal • Mathematical models: Model 1 (Guinet, 1993) and Model 2 (Balakrishnan, 1999)

  21. Computational experiments • Allthemethodswerecoded in Delphi 2009 and runona cluster of 30 blade servers, two Intel XEON processors, 2.5 GHz and 16 GB of RAM • Evaluationusing a proposedbenchmark of instances • Processing times: uniformlydistributedbetween 1 and 99 • Setup times: uniformlydistributedbetween1 to49 and 1 to 124 • Weightsforearliness-tardiness: uniformdistribution in therange 1 to 9 • Small instances • n={6;8;10;12}, m={2;3;4;5} • Large instances • n={50;100;150;200;250}, m={10;15;20;25;30}

  22. Computational experiments • Due dates of thejobs: uniformdistribution • [P(1-T-R/2),P(1-T+R/2)] • Combinationsof T, R, n and m and setuptimes • T={0.4;0.6}, R={0.2;0.6} • n={6;8;10;12}, m={2;3;4;5} (small instances) • n={50;100;150;200;250}, m={10;15;20;25;30} (large instances) • Setup Times = {1-49; 1-124} • Five replicates for each combination: 640 small instances, 1000 large instances • Calibration instances: large instances, one replicate for each combination. In total, 200 calibration instances

  23. Computational experiments • Instances available in http://soa.iti.es • Stopping criterion for all the metaheuristics: maximum elapsed CPU time following the expression: n ∙ (m/2) ∙ t ms, where t = 60; 120 • Performance measure:

  24. Computational experiments • Testing the MIP mathematical models: • IBM ILOG CPLEX (version 11.0) • Single thread vs two threads • Stopping time criteria: 3600 and 7200 seconds • Small instances (640 instances): each one is run four times (serial 3600 sec, serial 7200 sec, parallel 3600 sec, parallel 7200 sec) • Optimal solution found in all 640 instances • Model 2 better than Model 1: all instances are solved optimally and CPU times needed are much shorter • CPLEX with two cores improves results significantly

  25. Computational experiments • Standard parameters (GAIdleSt): • Pls 0.5 • Pc 0.5 • Pm  0.5 • Pressure  10 • Psize  80 • Calibration(GAIdleCal): • Pls0.5; 1 • Pc 0.5; 1 • Pm  0.5; 1 • Pressure 10 • Psize  60; 80

  26. Computational experiments Relative Percentage Deviation (RPD): Small instances Relative Percentage Deviation (RPD): Large instances

  27. Computational experiments

  28. Computational experiments

  29. Conclusions • A geneticalgorithmfortheparallel machine schedulingproblemwiththeobjective of minimisingthe total weightedearliness-tardinessisproposed • A procedureforinserting idle times • Fourversions of thealgorithm • Twoadaptedmathematicalmodels are tested • Evaluation of theversions, calibrationexperiment • Thecalibratedversion of thealgorithmincludingthe idle times insertioninside, obtainsthebest performance

  30. A genetic algorithm for the parallel machines scheduling problem with sequence dependent setup times and weighted earliness-tardiness minimisation Eva Vallada, Rubén Ruiz INSTITUTO TECNOLÓGICO DE INFORMÁTICA GRUPO DE SISTEMAS DE OPTIMIZACIÓN APLICADA UNIVERSITAT POLITÈCNICA DE VALÈNCIA HAROSA 2012, Barcelona June 13-15