Run
This presentation is the property of its rightful owner.
Sponsored Links
1 / 4

Run Summary PowerPoint PPT Presentation


  • 51 Views
  • Uploaded on
  • Presentation posted in: General

Run Summary. Run Meeting 14 -11-12. Daily Summary. LHC: Finish recovering from cryo lost at pt 4 y’day morning . Problems at injection , steering needed + problem in the BOOSTER Then , two physics fill (3285 and 3286, ongoing )  Fill 3285 dumped by operator

Download Presentation

Run Summary

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Run summary

RunSummary

Run Meeting

14-11-12


Run summary

DailySummary

  • LHC:

  • Finishrecovering from cryolostatpt 4 y’daymorning.

  • Problemsatinjection, steeringneeded + problem in the BOOSTER

  • Then, twophysicsfill (3285 and 3286, ongoing)

    •  Fill 3285 dumped by operator

    •  Interfill time of about 3.5 hours (from SB to SB).

  • LHCb:

  • Idlingduring the end of night/morning

  • Took data in fill 3285

    • Problem with TMUC and MUONC: opticallinksweredisabled

      • Manyautomaticchangerun due to ODE Q4M2R4_2

      • Solved by resetting 4 times ODE and one time TMUC

      • ProblemDB entry for concernedruns: https://lbproblems.cern.ch/problems/6891/

  • No problemsobservedduringfill 3286

    •  Running with efficiency > 97%

Federico Alessio


Run summary

DailySummary (@9 am)

TMUC and MUONC problem

Federico Alessio


Run summary

Plan

  • Take data

Federico Alessio


  • Login