Valencia Report. 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity (> 115 m m).

trula
Download Presentation

Valencia Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Valencia Report • 5 Pre-qualification (2 mechanical + 3 electrical) • All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity (> 115 mm). • Thermal cycling now understand (Tmax, module holding). Still some 4-8 mm variation in some parameters ( mainly in the hole). • IV all OK (before and after thermal cycling). • Bonding height and envelope measure done. • 2-4 unbonded channels per module. Have to be improved • Electrical performance: GND has been improved, noise well undercontrol, but still s-curve distortions observed (also in the Liverpool set-up). The VLN set-up is now working with 3 modules. • Valencia will start production with middle modules, then the qualification has to be done with middles. Carmen García RAL Cluster Meeting 15/7/2003

  2. Correlation spine-module bowing Pre-4 ~125 mm ~75 mm • Same effect observed in a dummy module. • More studies will be donewith new spines ~150 mm ~160 mm Carmen García RAL Cluster Meeting 15/7/2003

  3. Metrology: Liverpool-VLA crosscheck Pre-2 Valencia Liverpool Z reference plane = 227 mm Carmen García RAL Cluster Meeting 15/7/2003

  4. Metrology: Liverpool-VLA crosscheck Pre-5 Liverpool Valencia Z reference plane = 227 mm Carmen García RAL Cluster Meeting 15/7/2003

  5. Metrology: Liverpool-VLA crosscheck • Both modules show a difference on midx (Per2 & Pre5). • The fiducial on one detector corner missing, that could explain the difference on a3(Pre2). • The difference on mhx (Pre2) not understand. • Very good agreement with: • Geneva module • MPI (old middle module) Carmen García RAL Cluster Meeting 15/7/2003

  6. Envelope and bond height Point #NominalMaxPre-1 Pre-2 1001477189313421464 1031477189313481383 1109331249975951 1139331249984865 1011302175112621349 1041302175112861271 1117581057823856 1147581057864792 112758857830862 115758857840847 Edge chip F Edge chip B Out Fan-in F Out Fan-in B Cent. Fan-in B Bond Height Pre-1 Pre-2 (mm) D-Dloop high: 0.737 (0.026) 0.755(< 1above D) D-D loop low: 0.576 (0.013) 0.566 (> 0.5above D) D-F loop high: 0.376 (0.017) 0.437 (< 0.5above F) D-F loop low: 0.625 (0.11) 0.675 (> 0.5above D) C-F loop high: 0.467 (0.021) 0.480 (< 0.5above C) C-F loop low: 0.218 (0.023) 0.322 (> 0.1above C) Carmen García RAL Cluster Meeting 15/7/2003

  7. Electrical performance • The 3modules built are within specs, as far as performance is concerned • Gain ~50 mV/fC • Noise ≤ 1500 e- ENC @ T~10o C • Noise occupancy « 5x10-4 @ 1fC • GND and set-up tuning to measure the 3 modules simultaneously. • Howeverall showdistortionsin the noise occupancy s-curves at t ≤ 0.3 fC. • Not strong dependence on the GND configuration or noise level. • One module (Pre5) measured in Liverpool, same effect observed (may be reduce). • The effect is reduced when running hot. Carmen García RAL Cluster Meeting 15/7/2003

  8. Measurements @ 10ºC Pre3: Old connectors Pre4: Scratch fan-in and detector Not variation in the effect after the scratch Pre5: Measured atLiverpool Carmen García RAL Cluster Meeting 15/7/2003

  9. Measurements @ 30ºC • S-curve distortion less evident • Structure around the cooling block less pronounce Carmen García RAL Cluster Meeting 15/7/2003

  10. Preparation for Midwdle modules production • XY metrology under control. • Z survey: • Bonding program under test Set of Jigs 1 Set of Jigs 2 • Transfer back has been reworked • Transfers have been recalibrated Carmen García RAL Cluster Meeting 15/7/2003