Commissioning of the CMCF 08ID-1 Beamline. Light in the Optical Hutch. September 2005. November 2005. 18 mm. Light at the entrance to the white beam slits (42 m).

Download Presentation

Commissioning of the CMCF 08ID-1 Beamline

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Commissioning of the cmcf 08id 1 beamline

Commissioning of the CMCF 08ID-1 Beamline


Light in the optical hutch

Light in the Optical Hutch

September 2005

November 2005

18 mm

Light at the entrance to the white beam slits (42 m).

The rectangular “glow” comes from the light produced by the in-vacuum small-gap undulator. The gap was at 8.0 mm and the ring current 10 mA. The screen is a CVD-deposited diamond foil doped with nitrogen atoms. Small round spot from a visible BM light.

After the FE valve was opened!

Monochromatic light, just downstream of the DCM (45 m).

Gap = 12 mm (10 keV, 3rd harmonic)

Current = 90mA


Commissioning of the cmcf 08id 1 beamline

First diffraction patter.

March 18, 2006.

E=9.31 keV, d=260 mm,

exposure 3s.


Commissioning of the cmcf 08id 1 beamline

1.5 mrad sep.

08B1-1

DCM - 1st crystal

cryocooled offsetting

the beam 0.5 m up

Mini hutch

08ID-2

CMCF

Wet lab

08ID-1

50 m

40 m

20 m


When cls at 200 ma

When CLS at 200 mA


Layout of the cmcf 08id 1 beamline

Layout of the CMCF 08ID-1 Beamline

1/Mx = 6.8

1/My = 11.8


Commissioning of the cmcf 08id 1 beamline

End-station


Issues

Issues

  • Not sufficient, not complete or wrong info from vendors (motors, gearboxes)

  • Poor design of some components, no reference switch (crystal bender, yaw)

  • Malfunction equipment equipment that cannot be tested without the light (SESO XBPM, BPM)

  • Installation of optics without functional control system

  • Implementing physical units

  • Problems with saving the “final” motors’ parameters

  • Not implemented feedbacks from encoders

  • Noise from “high current” motors

  • Lack of man power to finish “control” of the end-station before the first light (high current motor drivers)


To do

To Do

  • CCD holder (2)

  • Testing of shutter/omega synchronization

  • Data acquisition (collect tab)

  • MOSTAB (pitch of the second crystal)

  • SGU – DCM “calibration”

  • Stability of the beam (electron & X-ray BPM)

  • Fluorescence scan, Roentec MCA, Chooch, MAD

  • Save-restore

  • Automatic beamline alignment

  • Final GUI

  • Automounter

  • Remote access


  • Login