Pavement Preservation Philosophy utilizing Pavement Management Systems

Pavement Preservation Philosophy utilizing Pavement Management Systems. Riverside County has 7,300 square miles and is the 4 th largest County in California About the size of State of New Jersey Nationally 11 th largest County 1990 Population: 1.5 Million Est.

tonyreese
Download Presentation

Pavement Preservation Philosophy utilizing Pavement Management Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pavement Preservation Philosophy utilizing Pavement Management Systems

  2. Riverside County has 7,300 square miles and is the 4th largest County in California • About the size of State of New Jersey • Nationally 11th largest County • 1990 Population: 1.5 Million Est. • 2010 Population: 2.2 Million Est. • 2018 Population: 2.5 Million Est. • 2030 Population: >3 Million Projected • 28 cities, 4 new since 2008

  3. Riverside County maintains the following infrastructures: • Over 2,200 miles of roadway • 108 bridges • 570 traffic signals • 10 Maintenance Yards (Countywide) • Approximately $200M in Annual Capital Budget

  4. TOTAL MILES (COUNTYWIDE)

  5. PAVEMENT MANAGEMENT • Program – StreetSaver by MTC • Uses PCI NEWLY PAVED FAILED ROAD

  6. DETERIORATION CURVE

  7. PAVEMENT INSPECTION • Inspection every year on ¼ of road network • Visual inspection by two-man crew • Data collection using tablet device • Automated evaluation • GIS integration

  8. DATA COLLECTION • GPR – layer thickness • FWD – structural condition • Coring – structural section

  9. PAVEMENT PRESERVATION • Definition - a program employing a network level, long-term strategy by using an integrated, cost-effective set of practices that extend pavement life (FHWA). • County’s Objective - Preserving roads already in good condition. • spending taxpayer’s money in a cost-effective manner • developing treatment methodologies based on pavement condition by using BMPs

  10. BEST MANAGEMENT PRACTICES • Achieving a target PCI • Seal Coat Treatment • Chip Seal • Slurry Seal • Cape Seal • Scrub Seal • Microsurfacing • Thin Overlays

  11. SEAL COAT • Chip/Seal • 120+ miles per year • RAP Chip • Slurry/Cape/Scrub Seal/Micro • 100+ miles per year • Type 2 RAP Chip

  12. OVERLAYS • Hot mix asphalt • 15% RAP • up to 2 inches thick • surface course – no RAP • Rubberized hot mix asphalt • crumb rubber from scrap tires • up to 2 inches thick

  13. RESURFACING/RECONSTRUCT • Mill & Fill • Full Reconstruction • Recycling • CIR (partial) • FDR (full depth)

  14. SEAL COAT PHOTOS

  15. CIR PHOTOS

  16. LESSONS LEARNED • Slurry Seal • Measurement & Payment – by TON • Full-time inspection • Testing – WTAT, portable truck scale, dipstick • Chip/Cape/Scrub Seal • Separate line item for emulsion and aggregate • Payment for emulsion by TON • Payment for aggregate by SQYD

  17. LESSONS LEARNED • CIR/FDR • Construction timing – Summer/Fall • Longer cure time in cool weather • Swell factor (10%) • Tend to ravel if left uncovered for more than 3 days • Apply fog seal to control raveling • Cost effective for long straightaway roads with minimum road curves and utility valves

  18. PMP EVALUATION • CSU Chico – CP2 (Professor Ding Cheng) • Objective of the Pavement Management Program (PMP) study • Evaluate the County PMP software • Evaluate the decision tree – treatment types and costs • Evaluate various budget scenarios and PCI goals to help dictate the allocation options for pavement preservation and rehabilitation • Provide recommendations and cost effectiveness measures for improving the County PMP

  19. DECISION TREE WITH LCC

  20. BUDGET SCENARIOS Three time periods (5, 10, and 20-year) were analyzed with various budget scenarios to determine the most effective approach to improve the average network PCI.

  21. DETERMINATION FACTORS • The various budget scenarios were evaluated based on 4 factors: • Network PCI • Deferred Maintenance Cost • Average Remaining Life • Total Overall Cost

  22. 5-YEAR SCENARIO

  23. 5-YEAR SCENARIO 2018 condition 2022 condition

  24. 10-YEAR SCENARIO

  25. 10-YEAR SCENARIO 2018 condition 2027 condition

  26. SUMMARY OF FINDINGS • SB 1 funding with 30% PM and 4% inflation has increased the PCI to 75 for the 5-year scenario. • SB 1 funding with 20% PM and 4% inflation has increased the PCI to 77 for the 10-year scenario.

  27. RECOMMENDATIONS • Continually update the costs and service life for each treatment in the decision tree. • A life cycle cost analysis should be used to select proper treatments for future decision tree update. • A balance of preservation and rehab or reconstruction should be utilized to improve the County’s pavement conditions. Keys to achieve the desired PCI include the following: • Optimize percentages for PM and Rehab (use lowest deferred maintenance cost) • Use innovative treatments that can improve life cycle cost

  28. QUESTIONS? Mojahed Salama – Deputy Director of Transportation E-mail: msalama@rivco.org Phone: (951) 955-6740 Elmer Datuin – Materials Engineer/Lab Manager E-mail: edatuin@rivco.org Phone: (951) 955-6762