General information about the project
This presentation is the property of its rightful owner.
Sponsored Links
1 / 21

General information about the Project PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on
  • Presentation posted in: General

General information about the Project. Project Description. Expected Results. The AESOP Project. Database Information. Objectives. Partners. TIP. Description of Work. List of Work Packages. Instrucciones: Reemplazar iconos de ejemplo por iconos de documentos activos así:

Download Presentation

General information about the Project

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


General information about the project

General information about the Project

Project Description

Expected Results

The AESOP Project

Database Information

Objectives

Partners

TIP

Description of Work

List of Work Packages


Project description

  • Instrucciones:

  • Reemplazar iconos de ejemplo por iconos de documentos activos así:

  • Crear documento en Word.

  • Volver a PowerPoint.

  • En el menú Insertar, seleccione Objeto...

  • Haga clic en “Crear desde archivo”

  • Ubique el nombre de archivo en el cuadro “Archivo”

  • “Mostrar como icono” debe estar activado.

  • Haga clic en Aceptar

  • Seleccione un icono

  • En el menú Presentación, seleccione Configuración de la acción.

  • Haga clic en “Acción de objeto” y seleccione “Modificar”

  • Haga clic en Aceptar

Project Description

  • Assessment of Energy Saving in Oil Pipelines

  • Project founded by the EC under the Energy, Environment and Sustainable Development.

  • Duration: 36 months - 2000/2003

  • 6 European Partners


Objectives

  • Instrucciones:

  • Reemplazar iconos de ejemplo por iconos de documentos activos así:

  • Crear documento en Word.

  • Volver a PowerPoint.

  • En el menú Insertar, seleccione Objeto...

  • Haga clic en “Crear desde archivo”

  • Ubique el nombre de archivo en el cuadro “Archivo”

  • “Mostrar como icono” debe estar activado.

  • Haga clic en Aceptar

  • Seleccione un icono

  • En el menú Presentación, seleccione Configuración de la acción.

  • Haga clic en “Acción de objeto” y seleccione “Modificar”

  • Haga clic en Aceptar

Objectives

  • To reduce the energy consumption and to increase the transport capabilities of oil pipeline networks

  • To develope the techniques required to use long-chain polymers as Drag Reducing Agent (DRA) in European oil pipeline networks


Partners

  • Instrucciones:

  • Reemplazar iconos de ejemplo por iconos de documentos activos así:

  • Crear documento en Word.

  • Volver a PowerPoint.

  • En el menú Insertar, seleccione Objeto...

  • Haga clic en “Crear desde archivo”

  • Ubique el nombre de archivo en el cuadro “Archivo”

  • “Mostrar como icono” debe estar activado.

  • Haga clic en Aceptar

  • Seleccione un icono

  • En el menú Presentación, seleccione Configuración de la acción.

  • Haga clic en “Acción de objeto” y seleccione “Modificar”

  • Haga clic en Aceptar

Partners

  • Compañía Logística de Hidrocarburos (CLH, S.A.)

  • Société du Pipeline Méditerranée Rhône (SPMR)

  • Energy Solutions (ESI)

  • Asociación para la Investigación y Cooperación Industrial de Andalucía (AICIA)

  • Fiat Research Centre (CRF)

  • Centre Spatial De Liege (CSL)

  • Société des Transports Pétroliers par Pipe-line(TRAPIL)


Description of work

  • Instrucciones:

  • Reemplazar iconos de ejemplo por iconos de documentos activos así:

  • Crear documento en Word.

  • Volver a PowerPoint.

  • En el menú Insertar, seleccione Objeto...

  • Haga clic en “Crear desde archivo”

  • Ubique el nombre de archivo en el cuadro “Archivo”

  • “Mostrar como icono” debe estar activado.

  • Haga clic en Aceptar

  • Seleccione un icono

  • En el menú Presentación, seleccione Configuración de la acción.

  • Haga clic en “Acción de objeto” y seleccione “Modificar”

  • Haga clic en Aceptar

Description of Work

  • Experimental studies of the effect on oil product characteristics when high DRA rates are added.

    • laboratory tests and analysis to determine how long -chain polymers can be broken

  • Large scale experimental studies of the efficiency of long chain polymers on pipeline oil transportation systems with low/high DRA rates.

  • To obtain a model of how the polymers behave and how the injection rate affects the operation.

  • To establish a methodology for the use of polymers, considering specific instrumentation and computer aided design programs.

  • Database design and manteinance with the results of the tests.


Expected results

  • Instrucciones:

  • Reemplazar iconos de ejemplo por iconos de documentos activos así:

  • Crear documento en Word.

  • Volver a PowerPoint.

  • En el menú Insertar, seleccione Objeto...

  • Haga clic en “Crear desde archivo”

  • Ubique el nombre de archivo en el cuadro “Archivo”

  • “Mostrar como icono” debe estar activado.

  • Haga clic en Aceptar

  • Seleccione un icono

  • En el menú Presentación, seleccione Configuración de la acción.

  • Haga clic en “Acción de objeto” y seleccione “Modificar”

  • Haga clic en Aceptar

Expected Results

  • Data base containing experiment data.

  • Set of models and corresponding validation procedures and validation results.

  • Computer programmes for designing and optimal operation of oil pipelines using DRA.

  • A prototype of equipment for polymer shearing at oil pipelines with validation data.

  • An assessment of the effect of DRA on quality of base products (gasolines and diesel oil) when high DRA rates are added.

  • Two of the partners’ oil pipelines with the instrumentation and operating procedures required for the use of DRA.

  • An assessment of the benefits obtained by the technique.


General characteristics of db

General Characteristics of DB

Independence between data andprocedures

Standardised documentation

Availability of the information

Flexibility

Quick and simple access

Coherent

information

DBMS


General characteristics of db1

General Characteristics of DB

Abstract Levels

Data Models

Formalisation

User logic

E/R Model

Conceptual

Global Logic

Logical

Relational Model

(FNBCD)

Physic structure

Relational DB

hierarchy DB

Codasyl DB


Technological implementation plan

Technological Implementation Plan

  • The Technological Implementation Plan (TIP) is a specification for the exploitation of the results of the project.

  • It is concerned with the exploitable potential we have generated and how we plan to realise that potential.

  • It is to ensure that the maximum number of tangible and intangible resultsbecome available.

  • The Commission's monitoring and evaluation of the exploitation phase of your project will be based on the TIP so it is an important planning document, not just a deliverable.

  • A good TIP is the best way to demonstrate to the Commission the value of the results.

  • It is an active document that can be completed at the start of the project and updated at mid-term and at project completion.


Technological implementation plan1

Technological Implementation Plan

1.- Overview and description of all project and results (Publishable). It will be used to document the results in CORDIS.

2. -Description of the intentions for dissemination and use by each partner (Confidential)

3.- Search for collaboration through Commission services (Optional, Publishable)

4.- Assessment of the European interests (Publishable). Co-ordinator to explain the interest for the European Union of the achieved results


List of work packages

List of Work Packages


List of work packages1

List of Work Packages


Wp global structure

WP Global Structure

Partner’s Previous Experience

WP5: Project Management

WP1:Assessment of effect on fuel performance for high additive concentrations

WP2:Experimental field studies of flow improvers

WP4:Methodology for the use of long chain polymers

WP3:Effectivenessmodel development


General information about the project

WP1

WP 1 Assessment of effect on fuel performance

for high additive concentrations

1.1 Laboratory analysis of oil product specifications with DRA

1.2 Laboratory test for polymer shearing

1.3 Assessment of effect on engine behaviour

1.4 Assessment of effect on injectors

1.5 Database of fuel performance

WP2


General information about the project

WP2

WP2 Experimental field studies of flow improvers

2.2 Conditioning of installations

2.1 Test Design

2.3 Effectiveness analysis of long chain polymer

2.4 Length and Discontinuity Influence

2.5 Influence on Measurement Equipment

WP1

2.6 Database of experimental field tests

WP3, WP4


General information about the project

WP3 Effectivity model development

3.1

Model

of

3.2

Model

of

WP1, WP2

WP4

polymer

efficiency

polymer degradation

WP3


General information about the project

WP4

Methodology

for

the use

of

polymers

4.1 Software

requirements

4.2

Pipeline

WP1

4.3

Installation

4.4

Optimal

simulation

package

design

algorithms

operation

algorithm

WP2

WP3

4.5 Software

integration

4.6

Guidelines

for

the

use

of

polymers

WP1

WP2

WP3

WP4


Deliverables i

Deliverables I


Deliverables ii

Deliverables II


Milestones

Milestones


Conclusions

EXIT

Conclusions

•Expected results:

*reduction of more than 25 % in the energy required for ton-km of the base products.

*increase in the capacity of more than 30 % in terms of ton-km.

•Reduction of the price of energy: this will contribute towards the competitiveness of the oil pipeline partners.

•An important social benefit can be obtained combating the saturated European road and highway system.


  • Login