1 / 6

WP5D contribution on Future IMT

WP5D contribution on Future IMT. Juyeon Song Samsung Electronics. CJK IMT 25 Beijing, China May 19 th , 2010. Overview of spectrum requirement for WRC-07. Forecast market demands. Forecast network capacity. Estimate spectrum requirements. ITU-R M.2072 Mobile Market Forecast

Download Presentation

WP5D contribution on Future IMT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP5D contribution on Future IMT Juyeon Song Samsung Electronics CJK IMT 25 Beijing, China May 19th , 2010

  2. Overview of spectrum requirement for WRC-07 Forecast market demands Forecast network capacity Estimate spectrum requirements • ITU-R M.2072 • Mobile Market Forecast • list of services • market issues • traffic forecast • Market parameters • ITU-R M.2074 • RATG Definition • RATG1/2/3/4 defined • ITU-R M.2078 • Estimated Spectrum Requirements • ITU-R M.1678 methodology • Candidate bands (ITU-R M.2079)

  3. What should be considered for future IMT? • Market perspective • The previous forecast data in ITU-R documents were conducted in the early of 2000s(2001 – 2004) • Report ITU-R M.2072 contains market forecast which are specific for country or region • Current available market data mostly projects from 2010 to 2015. • There exists the difference between current situation and previous forecast. • Other new trends such as regulatory conditions, cost strategies, new business models(e.g.M2M communications) are also important to estimate future demands for IMT services.

  4. What should be considered for future IMT? • Technology/Spectrum perspectives • Existing RATGs have been continuously evolved after WRC-07 • IEEE 802.16 technology which were treated to cover fixed and nomadic services has been included in IMT technology • RATG2, IMT-Advanced is scheduled to complete the first detailed specifications in March 2011. • Distribution ratios among available RATGs could be shifted according to the advanced RATGs in each service environment and in each radio environment. • Current available IMT frequency bandwidths do not meet the estimated spectrum requirements in previous study.

  5. Proposed action at the 8th meeting • Proposed market forecast approach • For short term(2010-2015), the previous forecast need to be reviewed, by comparing it with current available data to identify the gap between current available market data and previous ITU-R forecast • For long term(2015-2020), new market trends need to be analyzed to capture the future demands for IMT services, considering all aspects such as regulation, business, users’ behaviours, etc. • Identification of area to be reviewed in the previous forecast • Discussion on working method to develop a new Report[IMT.UPDATE]

  6. Thank you www.tta.or.kr

More Related