Automated Capacitor Control Program at TXU Electric Delivery. SWEDE May 1, 2006. Automated Capacitor Control Program. Why capacitor automation? TXU ED’s capacitor automation system requirements System architecture System implementation considerations. Why Capacitor Automation ?.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Automated Capacitor Control Program at TXU Electric Delivery' - tobias-richard


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Automated capacitor control program
Automated Capacitor Control Program

  • Why capacitor automation?

  • TXU ED’s capacitor automation system requirements

  • System architecture

  • System implementation considerations


Why capacitor automation
Why Capacitor Automation ?

  • Capital savings on future capacitor additions

  • Reduced O&M costs

  • Manpower savings

  • Improved utilization of assets

  • Ability to adapt to changing system needs

  • Compensate for customer supplied capacitors

  • Easier to make control setting changes

  • Increased availability of information on capacitor bank status and operation

  • Information available in a timely manner

  • System reliability and losses


Txu ed s capacitor automation system requirements
TXU ED’s Capacitor Automation System Requirements

  • Centralized control

  • Support multiple communications modes

  • Control logic based on VAR flow limits using existing substation feeder/bank information (watts, VAR, voltage)

  • Provide centralized control for Non-LTC stations (voltage control primary - VAR secondary)

  • Identify specific banks requiring maintenance

  • Provide information on the availability of capacitors

  • Identify feeders with excess or deficiencies of capacitors at peak conditions

  • Backup local control logic


System architecture
System Architecture

Paging

Company 1

Paging

Company 2

Central

Database

Yukon

Workstation

CBC

7010

PI Database

Feeder

Breaker

Watts & Vars


System implementation considerations
System Implementation Considerations

  • Field trial – size and time frame

  • Inform all groups effected by the project to gain support and get feedback

  • System implementation time schedule - allow for issues identified during initial stages on project

  • Manpower requirements for installation of controls and setup of central system (excellent OJT opportunity for system operators)

  • Project implementation procedures which verify and document proper operation of all system components

  • Field installations

    • Minor repairs identified during control installation

    • Who will perform control installations?

    • Detailed installation and documentation procedures

  • Provide adequate training for installers and emphasize need to follow procedures


System implementation considerations cont d
System Implementation Considerations (cont’d)

  • Manpower shift with centralized control

  • Who will run the system?

  • Manpower requirements for day to day operation

  • Maintenance procedures for banks identified by system in need of maintenance

  • Contingency plans if central system goes down

  • Changes in inspection cycles

  • Reports to management