Planning Resources for LHCb Computing Infrastructure

Planning Resources for LHCb Computing Infrastructure. John Harvey LHCb Software Week July 5-7 2000. Outline. Basic questions on LHCb Computing Model Technical requirements Plan for tests and the 2003 Prototype Milestones Costing and mapower Guidelines for MoU

tmcmaster
Download Presentation

Planning Resources for LHCb Computing Infrastructure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning Resources for LHCb Computing Infrastructure John Harvey LHCb Software Week July 5-7 2000

  2. Outline • Basic questions on LHCb Computing Model • Technical requirements • Plan for tests and the 2003 Prototype • Milestones • Costing and mapower • Guidelines for MoU • Calendar of summer activities • Summary

  3. Simulation production Analysis Central data store Data recording, calibration Reconstruction, reprocesssing Central data store Selected user analyses Local data store CERN Tier 0 Tier 1 UK Tier 1 France Tier 1 Italy AOD,TAG real : 80TB/yr sim: 120TB/yr CERN Tier 1 Oxford Roma I Barcelona Marseilles AOD,TAG 8-12 TB/yr Computing Model Tier 1 Spain ? ? ?

  4. Some basic questions • Which are the LHCb Tier 1 centres? • UK, France, Italy, ……? • We are being asked this question now. • How will countries without a Tier 1 centre access LHCb datasets and do analysis? • For each centre we need to ascertain whether there is a policy for permitting remote access to resources e.g. is it: • A collaboration-wide resource? • Restricted by nationality? • How will use of resources be allocated and costed?

  5. Technical Requirements • Tier 0 - real data production and user analysis at CERN • 120,000 SI95 cpu, 500 TB/yr, 400TB (export), 120 TB(import) • Tier 1 – simulation production and user analysis • 500,000 SI95 cpu, 330TB/yr, 400 TB (export), 120TB (import) • Shared between Tier 1 centres • Requirements need to be revised • New estimates of simulation events needed – evolution with time • Number of physicists doing analysis at each centre • Comparison with estimates from other experiments to look for discrepancies (e.g. analysis) • Sharing between Tier 0 and Tier 1 needs to be checked • 1/3 (CERN) 2/3 (outside) guideline

  6. Tests and the 2003 Prototype • Adaptation of LHCb production software to use grid middleware (i.e. Globus) has started • Production tests of new data processing software – performance and quality • Production tests of the computing infrastructure • Performance of hardware, scalability • Tests of the grid infrastructure • Construction of a large scale prototype facility at CERN • Adequate complexity (no of physical cpus, switches, disks etc.) • Suitable architecture – scope covers on- and off-line • Tests – scalability under different workloads, farm controls, data recording • Shared participation and exploitation by all 4 experiments • Planned for 2003 – sufficient time to get experience • Scale limited by ATLAS/CMS needs

  7. CERN Tier 0 Tier 1 UK Tier 1 Italy x2 Tier 1 France Tier 1 USA x2 CERN Tier 1 2003 Prototype Tier 1 others ? • CERN Tier 0 shared by all 4 expts even in 2005 – large! • Which are the Tier 1 centres that will participate in prototype? • Tier 1s decide how big they will be in prototype

  8. Computing Milestones • 2H2001 – Computing MoU • assignment of responsibilities (cost and manpower) • 1H2002 –Data Challenge 1 (Functionality test) • Test software framework machinery (database etc.) • Test basic grid infrastructure (>2 Tier 1 centres) • Scale of test ~ 106 events in ~1 month – modest capacity • 2H2002 – Computing TDR • 1H2003 – Data Challenge 2 (Stress tests using prototype) • Stress tests of data processing ~107 events in 1 month • Production (simulation) and chaotic (analysis) • Repeat tests of grid with all Tier 1 centres if possible • Include tests designed to gain experience with the online farm environment – data recording, controls

  9. Planning • Need to establish participation of Tier 1 centres • In grid tests • In 2003 prototype tests • Coordination between Tier 1s and experiments (EU project etc.) • Plan Data Challenges • Tasks, manpower schedule and milestones • Define technical details • Match to physics milestones – ongoing simulation work • Plan resources needed at each centre between now and 2005 • To participate in tests • To participate in simulation production

  10. Costing and Manpower • We need to identify our requirements at each centre and work with their local experts to cost our needs. • The centre should apply its own specific costing model to make estimates of the resources required to service LHCb needs as a function of time. This includes : • Unit costs of cpu, managed storage, network bandwidth, … • On-going maintenance costs • Policy for replacement and upgrade • The staffing levels in the Tier0 and Tier1s required for LHCb should be addressed jointly by LHCb and the centres’ experts to determine : • Dedicated LHCb support staff • Cost of services - breakdown as in-house and outsource • We can then compare these figures with our own estimates of the cost – ultimately we have responsibility for ensuring that the LHCb computing cost estimate is correct. • We need to estimate the evolution in the cost from now to 2005 i.e. including the cost of the prototype

  11. Guidelines to write the Computing MOU • Assignment of responsibility (cost and manpower) for the computing infrastructure • Provision of computing resources • Breakdown by centres providing production capacity • Remote access policies of Tier 1 centres • Maintenance and operation costs • Manpower for computing centres • Part of centre strategic planning i.e. not for LHCb MoU • Manpower for CORE computing components • CORE software components – institutional agreements • Software production tasks – librarian, quality, planning, doc,.. • Data production tasks – operation, bookkeeping • Manpower for detector specific computing • Follows institutional responsibility for detector • Timescale – write during 2001, sign when ready

  12. Construction of prototype • We need to understand how the construction of the prototype will be funded and how costs will be shared • This need not necessarily require an MoU if an informal agreement can be reached • We are expected to describe how we intend to use the prototype and to make a commitment on the manpower that will be used to provide the applications and to perform the tests.

  13. The calendar for the summer activities • 17th July – Review Panel 3 • Location of Tier 1 centres • LHCb technical requirements - to be sent to centres for costing • Participation of Tier 1 centres in prototype • 22nd August – Review Panel 3 • 20th September – Review Panel 3 • 25-29 September – LHCb collaboration meeting • October 3 – Review Steering – report almost final • October 9 – Review Panel3 • October 10th – finalise review report and distribute • October 24th – RRB meeting – discussion of report

  14. Summary • We need to refine model : • Where are theTier 1s? • How will physicists at each institute access data and do analysis? • We need to revise technical requirements • New estimates of simulation needs • Checks against requirements of other experiments • We need to define tests, MDCs and use of 2003 prototype • We need to make cost and manpower estimates • Working with the various centres • Next year we will need to write a Computing MoU defining the assignment of responsibility for costs and manpower • Will be signed only when all details are fixed