1 / 11

TRACER STUDY:

TRACER STUDY:. Phase 2 and 3. Tracer study 2 - objectives. To test the methodology with a larger number of schools To test the tool with a larger number of schools To train the participants and test the process. Tracer study 2 - timing. Preparation: February – March Fieldwork:

tino
Download Presentation

TRACER STUDY:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRACER STUDY: Phase 2 and 3

  2. Tracer study 2 - objectives • To test the methodology with a larger number of schools • To test the toolwith a larger number of schools • To train the participants and test the process

  3. Tracer study 2 - timing Preparation: • February – March Fieldwork: • April – May Data analysis • June – September Results dissemination • November

  4. Tracer study 3 - objectives To split the data collection into 2 parts: Exit survey – students (future graduates) fill a questionnaire at the end of their studies Tracer study – same students are contacted at least 9 months after graduation Same methodology wil be used, but with an extended questionnaire

  5. Tracer study 3 - timing Preparation: April Fieldwork: May – June Collection of data on teaching and learning Preparation of contact database for the next phase Data analysis June – September Second phase (collection of information on employment situation of graduates) will také place in May or September 2015

  6. PREPARATION PHASE

  7. Tasks • Who will be in the team? • Pre-conditions: Internet and Excel • Finalisation of a questionnaire • Preparation of contact database • Training on the data collection

  8. Who will be in the team? • At least two people who are ready to: • Dedicate time to the further and more hands-on training • Dedicate time to data collection • Want to have practical skills in the analysis of data and their usage

  9. Finalisation of the questionnaire • Finalisation of the questionnaire: February • Feedback from the pilot exercise 2013 • Meeting on 05/03 in Bishkek March → final circulation and feedback → finalisation by ETF For Phase 3 – the work on questionnaire will take place in April.

  10. Preparation of contact database • You need to know how to connect with the graduates • Name and Surname • Course of studies/degree • Contact address/Address of parents • E-mail address • Telephone number (mobile/fixed line)

  11. Training on the data collection Face to face meeting on practical steps in data collection at the end of March: • What is Survey Monkey (SM) • How to send online questionnaires • What to do if you use telephone/post survey • How to monitor the progress in SM

More Related