Planning Quality control - Manufacturing logbook Photos Conclusions

Planning Quality control - Manufacturing logbook Photos Conclusions. 2 PROTOTYPES FOR SPS - OUTLINE. Planning – production – installation Very detailed planning established at the start of the manufacturing drawings Including ALL operations - on a daily basis

tilly
Download Presentation

Planning Quality control - Manufacturing logbook Photos Conclusions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning Quality control - Manufacturing logbook Photos Conclusions 2 PROTOTYPES FOR SPS - OUTLINE A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  2. Planning – production – installation Very detailed planning established at the start of the manufacturing drawings Including ALL operations - on a daily basis TOTAL: 123 days until installation 18.08.04 8:00h This included: Design, stores, workshop, brazing, metrology, lab for thermal measurements, assembly, pressure test, vacuum test, electro beam-welding, bakeout equipment, calibration, test of moving mechanism Space requirements in SPS, safety - radiation installation logistics, transport ON TIME within less than 5 days 2 PROTOTYPES FOR SPS -MANUFACTURING A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  3. Quality control - Manufacturing logbook Record non-conformities Record dimensional measurements Record reference measurements for final alignment in SPS Time of operations for estimation of series production - will serve as an example for industry Photos 2 PROTOTYPES FOR SPS MANUFACTURING A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  4. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  5. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  6. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  7. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  8. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  9. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  10. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  11. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  12. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  13. A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  14. The mechanical design remains close to the LEP collimators BUT high beam energy requires carbon and very efficientcooling - new jaws design Extensive thermo-mechanical analyses predict that the requested 25 μm should be possible but not proven yet… prototype manufactured on standard machines Temperature measurements confirm thermal calculations Prototype design finished, series design started CONCLUSIONS A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  15. CONCLUSIONS – next steps • Manufacture of three prototypes according to schedule, two for the SPS – one for tests • Installation date in sight • Market survey for series production launched • Many different versions ( TCP, TCS, TCT, TCLI, TCLP, TCHS, TCDI ) with different angles • “Standardisation” of different types of collimators will require considerable design effort ( one motor, two motors, plug-in, spares ) • Special types with two beams in the same tank need still to be studied in detail A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME

  16. FINAL REMARKS • Next “Milestone” drawings for tender of part of the series - end of August • lot of work still ahead! KEEP THE MOMENTUM GOING Re-enforce the design team TO MEET THE DEADLINE OF THE FINANCE COMMITTEE BY THE END OF THE YEAR A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME