prototestdirector integration in the mogentes framework status of work
Download
Skip this Video
Download Presentation
ProtoTestDirector Integration in the MOGENTES Framework Status of work

Loading in 2 Seconds...

play fullscreen
1 / 4

ProtoTestDirector Integration in the MOGENTES Framework Status of work - PowerPoint PPT Presentation


  • 57 Views
  • Uploaded on

ProtoTestDirector Integration in the MOGENTES Framework Status of work. Lorenzo Fantesini – RE:Lab srl – [email protected] Massimiliano Pavesi – RE:Lab srl – [email protected] Import XML Testcase – RNC Format. ProtoTest Director Integration. Import Xml Testcase Using RNC Format

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' ProtoTestDirector Integration in the MOGENTES Framework Status of work' - thom


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
prototestdirector integration in the mogentes framework status of work

ProtoTestDirector Integration in the MOGENTES FrameworkStatus of work

Lorenzo Fantesini – RE:Lab srl – [email protected]

Massimiliano Pavesi – RE:Lab srl – [email protected]

prototest director integration
ProtoTest Director Integration
  • Import Xml TestcaseUsing RNC Format
    • The Import functionisavailable and working
  • Adapt the PTD to the MogentesRequirements:
    • PTD isabletomanipulateonlycontrollablevariables and timetriggered
    • The “Mogentes” PTD willbeabletohandlebothcontrollable and observablevariables, time-triggered, event-triggered and “response-triggered” (wait a responsefrom the ECU asindicated in ISOBUS Standards)
  • We are currentlydevelopingtheseaspects
ad