1 / 24

CID 17-2015

CID 17-2015. * Harrison County * US 62 ( Oddville Pike) * JPC Pavement with Grade and Drain. PIPE RAMMING VS. JACK & BORE. * Permitting – Railroad was interested in Ramming vs. Traditional Jack & Bore. …going the ramming route. * 90 L.F. of 18” Steel Casing Pipe

theophilus
Download Presentation

CID 17-2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CID 17-2015 * Harrison County * US 62 (Oddville Pike) * JPC Pavement with Grade and Drain

  2. PIPE RAMMING VS. JACK & BORE * Permitting – Railroad was interested in Ramming vs. Traditional Jack & Bore

  3. …going the ramming route * 90 L.F. of 18” Steel Casing Pipe * Inside of Pipe to be Lined after Install * Unit Price = $788.00/L.F.

  4. McKiernan-Terry #5 hammer * 1,500 Lbs in Weight * Produced in 1921 * Vertical Pile Driving (Sandy Soil) * 15’ Depth – 4”x12” Wooden Pile * 20’ Depth – 12” Wide Steel Pile

  5. Lessons learned…

  6. …going the ramming route * Situationally Made a Good Decision

  7. * Utilized a very simple but effective project note

  8. Consider specifying a cutting shoe …

  9. Good Better …have the right tools for the job

  10. Questions: Jerry F. Keith, SE KYTC District 6 jerry.keith@ky.gov