Agenda
This presentation is the property of its rightful owner.
Sponsored Links
1 / 5

Agenda PowerPoint PPT Presentation


  • 73 Views
  • Uploaded on
  • Presentation posted in: General

Agenda. 08:30 - 09:00 Assembly, Coffee 09:00 – 09:30 Introductions P. J. Oddone, S. Aronson 09:30 – 12:00 Neutrino Physics NOvADirection and OpportunitiesG. Feldman (:15) Long Baseline NeutrinosS. Geer (:15) Liquid Argon R&D G. Bock/Mont (:10)

Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Agenda

Agenda

08:30 - 09:00 Assembly, Coffee

09:00 – 09:30 Introductions P. J. Oddone, S. Aronson

09:30 – 12:00 Neutrino Physics

NOvADirection and OpportunitiesG. Feldman (:15)

Long Baseline NeutrinosS. Geer (:15)

Liquid Argon R&D G. Bock/Mont (:10)

BNL Very Long Baseline ConceptW. Marciano (:20)

Detectors, siteM. Diwan (:20)

Discussion

12:00-12:45 Lunch

12:45- 14:45 Proton Driver Issues

The 8 GeV LinacW. Foster (:15)

Main Injector/Beam TransportW. Foster/ S. Holmes (:15)

TargetryS. Geer (:10)

BNL Proton Driver R&DN. Simos/R. Palmer (:40)

Discussion

14:45 – 16:00 Linear Collider

StrategyS. Mishra (:15)

Detector IssuesM. Demarteau (:15)

BNL ILC R&D MachineM. Harrison/V. Litvinenko (:15)

DetectorH. Gordon/V. Radeka (:15)

Discussion

16:00Wrap-up

16:15 Adjourn


Neutrinos

Neutrinos

  • BNL committed to “the physics” no matter where the source is

  • “the physics” is a wide band beam  1MW to a large (>>100kTon) detector in DUSEL

    • The Labs need to have a plan for a beam to DUSEL

    • near-term n plans = MINOS, mid-term = reactor 

  • Want to study (in addition to generic R&D):

    • Physics reach of a MI WBB to DUSEL

      • Optimization of beam energy vs. beam power vs. angle

      • Compared to PD WBB to DUSEL

      • BNL WBB to DUSEL as a reference


Neutrino r d

Neutrino R&D

  • Accelerator-related

  • Detector-related


Agenda

ILC

  • Accelerator-related

    • A key issue is the Superconducting Magnet Div.

      • Beam delivery system & direct-wind technology

    • Areas of possible collaboration

  • Detector-related


Wrap up

Wrap-up

  • Neutrino study – we want to do this

    • Off-line discussion  scope and charge to a joint (BNL-FNAL) study of very long baseline oscillation experiment from FNAL  DUSEL

    • BNL plans to submit its R&D proposals to DOE, rsn

  • Proton Driver collaboration

    • Needs local discussion then, if positive, a dedicated meeting (@FNAL?)

  • Targetry – what should be added to present collaboration?

    • Hg target for low-energy beam?

    • C-C, Ni-Al high dose targetry

  • ILC accelerator R&D

    • some in progress (in SMD); currently underfunded by ILC R&D

    • SRF gun – in progress?

  • ILC detector R&D


  • Login