CAA Taiwan
Download
1 / 9

27 July 2009 - PowerPoint PPT Presentation


  • 140 Views
  • Uploaded on

CAA Taiwan PBN Statement. 27 July 2009. Tiger Chao 趙培虎 Air Traffic Services Division. Contents. 01. RNAV Status in Taipei FIR. 02. 04. PBN Benefits. CAA draft PBN Plan. 03. ICAO APAC PBN Plan. RNAV Status in Taipei FIR. M750(M20) RNAV Route - 1997. N892 RNAV Route - 2001.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' 27 July 2009' - teryl


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

CAA Taiwan

PBN Statement

27 July 2009

Tiger Chao 趙培虎

Air Traffic Services Division


Contents

01

RNAV Status in Taipei FIR

02

04

PBN Benefits

CAA draft PBN Plan

03

ICAO APAC PBN Plan


RNAV Status in Taipei FIR

M750(M20) RNAV Route - 1997

N892 RNAV Route - 2001

20 GNSS approaches for 9 airports,

RNAV SIDs & STARs for RCTP - 2001

T1(Flora) RNAV Transition Route - 2005

L1,J1 RNAV Transition Route - 2007

Cross-Strait Routes – 2008,2009


RNAV/PBN Benefits

Parallel Routes

Shorter Routes

Continuous Descent Approaches

Efficient Use of Airspace

Concentrated Tracks

Reduce Environmental Impact


ICAO Asia and Pacific Office (APAC) published the PBN IMPLEMENTATION PLAN (interim edition) in Sep 2008

CAA will follow ASIA/PACIFIC PBN IMPLEMENTATION PLAN


PBN needs cooperation between IMPLEMENTATION PLAN (interim edition) in Sep 2008

Flight Standard

Air Traffic

Air Lines


APAC PBN PLAN IMPLEMENTATION PLAN (interim edition) in Sep 2008


CAA Draft PBN Plan IMPLEMENTATION PLAN (interim edition) in Sep 2008

Short Term

Long Term

Mid Term

M750→RNAV5

N892→RNAV10

→RNAV 1

(RCTP, RCKH & RCSS)

RNAV(GNSS)→ Baro VNAV

(RCTP, RCKH & RCSS)

Re-organize all routes to

RNAV5/ RNAV2

→RNAV1/ RNP1

(All airports)

RNAV(GNSS)→

Baro VNAV

(All ADs)

RNP AR approach

(selected AD)

Seam-less

Inter-operable

→RNP1

(High density ADs)

Baro VNAV

(All ADs)

RNP AR approach

(selected AD)

Route

SID/STAR

Approach


THANKS! IMPLEMENTATION PLAN (interim edition) in Sep 2008


ad