Status of lccal project
This presentation is the property of its rightful owner.
Sponsored Links
1 / 11

Status of LCcal Project PowerPoint PPT Presentation


  • 93 Views
  • Uploaded on
  • Presentation posted in: General

Status of LCcal Project. Scintillator tiles Fibr e s Si detector Simulation Future beam tests. Remind:. Contributors (Como, LNF, Padova, Trieste):

Download Presentation

Status of LCcal Project

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Status of lccal project

Status of LCcal Project

  • Scintillator tiles

  • Fibres

  • Si detector

  • Simulation

  • Future beam tests

Remind:

Contributors (Como, LNF, Padova, Trieste):

M. Alemi, A.Anashkin, M.Bettini, S.Bertolucci, E. Borsato, M. Caccia, P.C, C. Fanin, S. Miscetti, M. Prest, R. Peghin, L. Ramina, E. Vallazza

P. Checchia ECFA-DESY St. Malo


Scintillator tiles

Scintillator tiles

  • 3 mm Kuraray SCSN-61(25x25 cm2)

  • 3 mm Bicron BC-408 (25x25 cm2)

Machined with vacuum plate as holder

Whole Production starting now

P. Checchia ECFA-DESY St. Malo


Fib r es

Fibres

Room temperature curvature problem solved

Use middle temperature

(500-700) oven

Kuraray 1mm d.

Y11 300 ppm multicladding

> 3 ph e- /m.i.p./tile obtained stable in >30 days time

P. Checchia ECFA-DESY St. Malo


Si detector

Si Detector

  • Problems with the detector production:

  • 1)delay due to foundry, 2)bad quality in the first lot of wafers 3)second lot (4 wafers) under test:

P. Checchia ECFA-DESY St. Malo


Status of lccal project

1 wafer broken

‘soft breakdown’

Full depletion <30 V

C vs Vbias

30 pF

P. Checchia ECFA-DESY St. Malo


Status of lccal project

  • PCB : Printed board design ready in production

Chip

side

Detector

side

P. Checchia ECFA-DESY St. Malo


Simulation geant 4

Simulation (Geant 4)

Expected Energy resolution

Light collection effect (20 %)

Lateral dimension with tungsten

P. Checchia ECFA-DESY St. Malo


Future beam tests

Future Beam Tests

P. Checchia ECFA-DESY St. Malo


Status of lccal project

Tunable number of

500 MeV electrons

2 electrons

5 electrons

P. Checchia ECFA-DESY St. Malo


Status of lccal project

Beam time at CERN:

Do you want to share it ?

P. Checchia ECFA-DESY St. Malo


Conclusions

Conclusions

  • Scintillator plates production starting

  • Si detectors to be tested (and final production to be scheduled)

  • Beam test with partial detector at CERN

  • Full detector test ( Frascati? ) by september

P. Checchia ECFA-DESY St. Malo