1 / 11

FINAL TEST ANSWER KEY For

FINAL TEST ANSWER KEY For Electromagnetic Environmental Effects (E3) and Spectrum Supportability (SS) for Acquisition Professionals Web-Based Training (WBT) Course Contract No. N65236-03-D-3714 (DO 0123) SPAWARSYSCEN CHARLESTON P.O. Box 190022 North Charleston, SC 29419-9022. PREFACE

teneil
Download Presentation

FINAL TEST ANSWER KEY For

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FINAL TEST ANSWER KEY For Electromagnetic Environmental Effects (E3) and Spectrum Supportability (SS) for Acquisition Professionals Web-Based Training (WBT) Course Contract No. N65236-03-D-3714 (DO 0123) SPAWARSYSCEN CHARLESTON P.O. Box 190022 North Charleston, SC 29419-9022

  2. PREFACE This test answer key includes the questions and answers for the final assessment questions covering topics one through ten, which are located on pages three through eleven in the key. The final assessment consists of 30 questions. The correct answers are identified by italics and an asterisk (*). The Point-of-Contact for the Electromagnetic Environmental Effects (E3) and Spectrum Supportability (SS) for Acquisition Professionals Web-Based Training (WBT) course is Mr. Joseph Epple, SPAWARSYSCEN, Charleston (725), (843) 218-4228 or email at joseph.epple@navy.mil.

  3. Topic Title (ELO): Post-Test (test) • Page Title: Post-Test • 1. Not protecting from the effects of electromagnetic interference could result in ____________. (military) • A. Uncommanded movements of aircraft control surfaces • B. Loss of communication datalink • C. Inadvertent actuation of ordnance • D. All of the above* • 2. The B-2 Radar redesign problem described in this module is an example of ____________. (military_0050) • A. Not properly considering the total electromagnetic environment in a system design • B. Not fully analyzing subsystem electromagnetic interference test data for potential interference problems • C. Not properly fully conducting a spectrum supportability assessment to understand the constraints of the desired system operating frequency range* • D. Not obtaining a Stage 4 Operational Request for Frequency Allocation • 3. Modern war fighting strategy relies on wireless communication and data systems necessitating a heavy reliance on ____________. (military) • A. Electromagnetic spectrum access* • B. Systems free from electromagnetic interference • C. Highly accurate Global Positioning Sensor • D. Increasingly accurate circular error of probability of weapons

  4. 4. What is the definition of spectrum supportability? (military) • A. The authority to buy or develop communications-electronics equipment for operation in a specified frequency band • B. The assessment as to whether the electromagnetic spectrum necessary to support the operation of a spectrum-dependent equipment or system during its expected life cycle is, or will be, available (that is, from system development, through developmental and operational testing, to actual operation in the electromagnetic environment)* • C. A frequency band established by national or international rules and regulations for specific categories of radio services, such as radiolocation, radio navigation, mobile or fixed communications, space telemetry, etc. • D. None of the above • 5. According to the Office of Management and Budget Circular A-11, ____________. (policy) • A. Estimates or obligation of funds for the development or procurement of communications-electronic systems should be withheld pending assurance of the availability of frequency support by the National Telecommunications and Information Administration* • B. A DD Form 1494 shall be used to initiate and obtain spectrum certification • C. Electromagnetic environmental effects control shall be planned for and incorporated in all Department of Defense acquisitions • D. All electric or electronic systems shall be designed to be mutually compatible with other such equipment in the expected operational electromagnetic environment

  5. 6. Which document requires electronic systems to be designed to be mutually compatible with other such equipment in the expected operational electromagnetic environment? (policy) A. DoDD 4650.1 B. DoDD 3222.3* C. CJCSI 6212 D. MIL-STD-461 7. Which document addresses policy for the management and use of the electromagnetic spectrum within the Department of Defense? (policy) A. DoDD 3222.3 B. CJCSI 3170.01C C. DoDD 4650.1* D. DoDD 5000.1 8. ____________ specifically requires procured systems to be electromagnetically compatible and spectrum supportable. (policy) A. DoDD 5000.1* B. DoD Instruction 5000.2 C. DoDD 4650.1 D. All of the above 9. Which Joint Capabilities Integration and Development System document details the requirements for spectrum supportability and electromagnetic environmental effects control in program requirements documents? (generate_0060) A. DoDD 5000.1 B. DoDI 5000.2 C. CJCSI 6212.01* D. MIL-STD-464

  6. 10. MIL-STD-464 covers platform level electromagnetic environmental effects performance requirements. (generate_0040) A. True* B. False 11. Identify two top level electromagnetic environmental effects performance and test requirements documents. (generate_0020) A. MIL-STD-461 and MIL-STD-464* B. MIL-STD-462 and MIL-E-6051 C. DoDD 3222.2 and MIL-STD-464 D. MIL-STD-881 and MIL-STD-882 12. What document implements the policies and procedures for developing, evaluating, and providing interoperability and supportability certification in support of the Joint Capabilities Integration and Development System process? (generate) A. CJCSI 3170.01 B. CJCSI 6212.01* C. DoDD 4650.1 D. DoDD 5000.1 13. ____________ establishes policies and procedures of the Joint Capabilities Integration and Development System, which addresses requirements for developing, reviewing, validating, and approving top level requirements documents. (generate) A. DoDD 4650.1 B. DoDD 5000.1 C. CJCSI 6212.01 D. CJCSI 3170.01*

  7. 14. A ____________ identifies a tailored Test and Evaluation Program to demonstrate that the applicable key performance parameters, critical issues, and technical parameters are met. (verify) A. Statement of Work B. Contract Data Requirements List C. Test and Evaluation Master Plan* D. Analytical Tool 15. Which of the following tasks is not part of a successful Test and Evaluation strategy to validate electromagnetic environmental effects requirements? (verify) A. Validate electromagnetic environmental effects requirements of a system based on its intended electromagnetic environment B. Identify capabilities and limitations due to electromagnetic environmental effects and spectrum availability C. Require Developmental Test and Evaluation and Operational Test and Evaluation D. Assume commercial items and non-developmental items meet performance requirements in the military environment* 16. Which entity is responsible for obtaining frequency assignments for equipment and systems during Operational Test and Evaluation? (verify) A. Program Manager B. Service Operational Test Agency* C. MCEB D. Contractor

  8. 17. On a large program, the program manager can authorize an electromagnetic environmental effects working level Integrated Product Team to ____________. (ipt_0030) A. Assist in the coordination of data for the DD 1494 B. Define Developmental Test and Evaluation and Operational Test and Evaluation requirements C. Utilize electromagnetic environmental effects measurement, simulation and prediction capabilities D. All of the above* 18. One of the primary electromagnetic environmental effects objectives during the Concept Technology Development Phase of the acquisition cycle is to ____________. (acquire_0030) A. Review electromagnetic interference test data to identify system electromagnetic environmental effects risks B. Develop and document the expected operational electromagnetic environment* C. Obtain a Phase III DD 1494 approval D. Submit an operational frequency plan 19. One of the primary electromagnetic environmental effects objectives during the System Development and Demonstration Phase of the acquisition cycle is to ____________. (acquire_0050) A. Establish electromagnetic environmental effects control and testing requirements for engineering development* B. Develop and document the expected operational electromagnetic environment C. Obtain an Experimental DD 1494 approval D. Correct system anomalies through P3I programs

  9. 20. One of the primary electromagnetic environmental effects objectives during the Production and Deployment Phase of the acquisition cycle is to ____________. (acquire_0070) A. Ensure through system level testing that the production model meets all electromagnetic environmental effects control requirements* B. Develop and document the expected operational electromagnetic environment C. Obtain an Experimental DD 1494 approval D. Correct system anomalies through P3I programs 21. One of the primary electromagnetic environmental effects objectives during the Operations and Support Phase of the acquisition cycle is to ____________. (acquire_0090) A. Obtain an Experimental DD 1494 approval B. Review electromagnetic inference test data to identify system electromagnetic environmental effects risks C. Develop and document the expected operational electromagnetic environment D. Identify and correct operational electromagnetic interference problems* 22. What organization approves all US governmental spectrum usage? (organize_0030) A. National Telecommunications and Information Administration* B. White House C. Federal Communications Commission D. International Telecommunications Union

  10. 23. The ____________ is chaired by the National Telecommunications and Information Administration and assists in writing policy on frequency allocations, Equipment Spectrum Certification, and frequency assignments. (organize) A. Federal Communications Commission B. International Telecommunications Union C. Office of Management and Budget D. Inter-department Radio Advisory Committee* 24. What document must be produced and submitted by the acquisition manager for equipment to operate in the intended spectral environment? (certify) A. DD Form 1494* B. M1/1594 C. PM/409 D. SM/1694 25. Who initiates the Equipment Spectrum Certification Process? (certify_0030) A. Joint Spectrum Center B. Program Manager* C. Federal Communications Commission D. Department of Defense 26. What is the difference between spectrum supportability and spectrum certification? (certify) A. Spectrum supportability provides an assessment of frequency availability B. Spectrum certification is a vehicle to obtain spectrum supportability C. Spectrum supportability and Spectrum certification are the same D. Both A and B*

  11. 27. An amended DD Form 1494 should be submitted to correct or update an existing application when: (certify) A. A new military scenario is planned for a previously approved item B. Needs exist to alter any of the conditions of an existing allocation with respect to equipment characteristics, nomenclature, or intended operational environment C. The equipment is changed with an identical unit D. Both A and B* 28. Who is responsible for interfacing with foreign host nation frequency authorities to request permission for system operations in foreign countries? (issue) A. Office of the Chief of Naval Operations B. Federal Communications Commission C. Combatant Commands* D. International Telecommunications Union 29. Commercial items and non-developmental items approved by the Federal Communications Commission are exempt from going through the military spectrum management process. (issue) A. True B. False*

More Related