Status of cryogenic control infrastructure at ip8
This presentation is the property of its rightful owner.
Sponsored Links
1 / 10

Status of Cryogenic control infrastructure at IP8 PowerPoint PPT Presentation


  • 69 Views
  • Uploaded on
  • Presentation posted in: General

Status of Cryogenic control infrastructure at IP8. Refrigerators Architecture. CCC. OWS. Data server(s). OWS. Local Cryogenic control room. Premium PCU. Quantum PCU. EWS. Profibus network. Premium Field interface. Premium Field interface. Profibus network.

Download Presentation

Status of Cryogenic control infrastructure at IP8

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Status of cryogenic control infrastructure at ip8

Status of Cryogenic control infrastructure at IP8


Refrigerators architecture

Refrigerators Architecture

CCC

OWS

Data server(s)

OWS

Local Cryogenic control room

Premium PCU

Quantum PCU

EWS

Profibus network

Premium

Field interface

Premium

Field interface

Profibus network

Accelerator Full Premium Solution

Accelerator Premium Quantum Solution


Final cryo production control system

Final Cryo Production Control system

Control room SHC8

EW1

CCC

OS3

OS4

OS1

OS2

EW2

SCADA data servers

DS1

4.5K

1.8K

4.5K

1.8K

Ethernet local connection

UTP

Bat 2851

LHCCA

LHCA

LHCCB

LHCB

Ethernet backbone (IT-CS)

SDH8

SH8

SD8

SHM8

SHBB8

QSDN

QSCB

QSAB

QSCCB

QSRB

QSCCA

QSKA

QSCA

QSAA

QSRA

QSV

Main Dryer

Comp 1.8K

LN2 Buffer

Comp 1.8K

Comp 4.5K

Main Dryer

Cold Box 4.5K

UCB 4.5K

Comp 4.5K

QURA

US IP8

QUI

Connection

Box

LCB

4.5K

5200

3em

UX85

US85

US IP1(a)

US IP7(b)

QURCB

QURCA

8200

2em

CB 1.8K

CB 1.8K


Ip8 present cryo production control system

IP8 Present Cryo Production Control system

Control room SHC8

OS1

CCC

DSXP LHCB

DS XP LHCC

DS XP LHCA

DD XP QUI/QSDN

OS2

4.5K

1.8K

4.5K

1.8K

Ethernet local connection

UTP

Bat 2851

LHCCA

LHCA

LHCCB

LHCB

Ethernet backbone (IT-CS)

SDH8

SH8

SD8

SHM8

SHBB8

QSDN

QSCB

QSAB

QSCCB

QSRB

QSCCA

QSCA

QSAA

QSRA

QSKA

QSV

Main Dryer

Comp 1.8K

LN2 Buffer

Comp 1.8K

Comp 4.5K

Main Dryer

Cold Box 4.5K

UCB 4.5K

Comp 4.5K

QURA

US IP8

QUI

Connection

Box

LCB

4.5K

5200

3em

UX85

US85

US IP1(a)

US IP7(b)

QURCB

QURCA

8200

2em

CB 1.8K

CB 1.8K


Status of hardware for production

Status of Hardware for production

  • 17 PLC installed, 3 PLC missing (OK with cryo planning)

  • 1 Ethernet Starpoint missing

  • LOCAL PVSS DS based on XP used for commissioning ,

  • Linux PVSS DS ready (migration foreseen this summer)

  • All PLC systems & components declared in ABCAM.


Hardware architecture qrl

Hardware Architecture QRL

Central Cobtrol room

Dedicated OWS/DS

Local Cryogenic control room

comms.

EWS

QuantumPCUs

ACR responsibility

S7-400 Siemens

PROFIBUS DP

networks (2)

WFIP

Networks (4)

PROFIBUS PA networks

ET200 I/O for QV & sensors

ET200 I/O temperature sensors

QRL test setup


Status of hardware for qrl

Status of Hardware for QRL

  • FIP network installed and tested

  • Profibus Fiber and Coupler installed but not connected in SHC8

  • Profibus coupler for tunnel supplied to ACR

  • Process control PLC installed

  • Ethernet installed & IP available in SHR8 & SHC8

  • DS for PVSS to be provided by ACR

  • GW siemens to provided by ACR

  • Profibus slave installation (see PG presentation)


Hardware architecture for sector

Hardware Architecture for Sector

CCC

Central Cryogenic

control room

Data server(s)

CCC

OWS

OWS

Local

Cryogenic Control room

OWS

EWS

Field Cryogenic control room

Local Cryogenic control room

comms.

EWS

QuantumPCUs

S7-400 Siemens

PROFIBUS DP

networks (3)

WFIP Gateways

PROFIBUS PA networks

WFIP

Networks (4)

ET200 I/O for QV & sensors

S7-400 as gateway


Status of hardware for sector

Status of Hardware for Sector

  • FIP network installed and tested

  • Profibus Fiber and Coupler installed but not connected in SHC8

  • Profibus coupler for tunnel supplied to ACR

  • Process control PLC installed or ready to be installed

  • Ethernet installed & IP available in SHR8 & SHC8

  • DS for PVSS to be provided (CO)

  • GW siemens to provided (CO)

  • Profibus WFIP slave installation (ACR)

  • Reconnection WFIP after QRL test (ACR)

  • Installation of repeaters & tests FIP after reconnection (CO)

  • GW FIP to be installed in July/August by CO

  • PVSS servers ready


Hardware pb encountered not only at p8

Hardware PB encountered (not only at P8)

  • ACR slipping planning

  • Difficulty to obtain installation of Network

    • Coordination PB between IT-CS And TS-EL and Fiber installation we often have to put people in contact and to follow the Installation process

    • IT-IS planning seems established only under pressure

  • TS –EL Organization : One responsible per site you have to re-explain 5 times the same thing.

  • Cabling to GW racks (uses of fan holes to insert cables)

  • Double check for FIP networks (only for IP8)

  • ABCAM interface not finished


  • Login