Eagle ford overview
Download
1 / 15

Eagle Ford Overview - PowerPoint PPT Presentation


  • 107 Views
  • Uploaded on

Eagle Ford Overview. Allen Gilmer, CEO 18 September 2013. Eagle Ford Coverage. 1,949 Geology Wells (contain well logs that penetrated the Eagle Ford) 6,768 Production Wells (Known Eagle Ford Producers). Source: DI Analytics. Grading Map 20:1 BOE. Source: DI Analytics.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Eagle Ford Overview' - ted


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Eagle ford overview

Eagle Ford Overview

Allen Gilmer, CEO 18 September 2013


Eagle ford coverage
Eagle Ford Coverage

1,949 Geology Wells (contain well logs that penetrated the Eagle Ford)

6,768 Production Wells (Known Eagle Ford Producers)

Source: DI Analytics


Grading map 20 1 boe
Grading Map 20:1 BOE

Source: DI Analytics


Operator performance differential
Operator Performance Differential

BHP

Freeport

Freeport

BHP

Freeport

Freeport

BHP

BHP

Source: DI Analytics, Deviation based on Max IP BOE/D 20:1 basis


Expiring Leases by Grantee

Source: DI Analytics


Expiring Leases by Date

Source: DI Analytics


Rig days per well
Rig Days Per Well

Source: Baker Hughes, contractors


Operator well spacing
Operator Well Spacing

Source: DI Analytics


Well interference

Well Interference

Production ratio for neighboring wells where first well producing for at least 6 months

Source: DI Analytics


Natural spacing
Natural Spacing

Source: DI Analytics


Baseline eagle ford production forecast

Baseline Eagle Ford Production Forecast

Baseline model assumes current well starts, prices, and EURs remain consistent with present values

Source: DI Analytics


Baseline production forecast

Baseline Production Forecast

Baseline model assumes 5700’ laterals, 600’ wellbore spacing, and 0.9 Land Use Efficiency Factor

Source: DI Analytics


Eagle ford gas eurs
Eagle Ford Gas EURs

Source: DI Analytics, wellhead gas


Eagle ford liquids eurs
Eagle Ford Liquids EURs

Source: DI Analytics, liquids include wellhead oil and wellhead condensate


Breakeven prices average vs best in class operator
Breakeven Prices: Average vs. Best In Class Operator

Source: Drillinginfo, DI Analytics, $7.5MM well cost


ad