“Engineering Custom Made Photovoltaic Solutions for the Lebanese Industry ”. Presented by Eng. Elias Abou Chedid Head of Technical Department Elements Sun & Wind. The Company | Concept | Case Study | Economical Study | Conclusion. About the Company:. Name: . Elements Sun & Wind.

Download Presentation

“Engineering Custom Made Photovoltaic Solutions for the Lebanese Industry ”

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Engineering custom made photovoltaic solutions for the lebanese industry

“Engineering Custom Made Photovoltaic Solutions for the Lebanese Industry ”

Presented by Eng. Elias AbouChedid

Head of Technical Department

Elements Sun & Wind


The company concept case study economical study conclusion

The Company | Concept | Case Study | Economical Study | Conclusion

  • About the Company:

  • Name:

  • Elements Sun & Wind

  • Slogan:

  • Clean Power Providers

  • Establishment:

  • Feb 2011

  • Address:

  • HorchTabet- Lebanon

  • Field of Work:

  • Engineering and Procurement Contracting

  • Size:

  • 25 Employees (3 Engineers)

  • PV Built Capacity:

  • 400+ kWp

  • Scope of Work:

  • Engineering, Consultancy, Economic Analysis,Equipment supply…

ECOrient 2014


Engineering custom made photovoltaic solutions for the lebanese industry

The Company | Concept | Case Study | Economical Study | Conclusion

  • About the Company:

  • Mission:

We deliver quality solutions and services

  • Vision:

  • To reinforce our presence in the Lebanese market and further extend abroad and becomea regional player in the MENA region .

  • Values:

  • Credibility

  • Safety

  • Customized Solutions

  • Excellence

  • Team Work

ECOrient 2014


The company concept case study economical study conclusion1

The Company | Concept | Case Study | Economical Study | Conclusion

  • The Way we See the PV Market in Lebanon:

Find the Most Adapted Type for Each Application ?!!!

Photovoltaic Systems

Grid Connected

Stand Alone

Public Grid

(Net metering)

Private Grid (PV/Diesel)

With Batteries (Remote areas, Backup, Street lighting,..)

Without Batteries (Special Applications)

-Grid Quality

- High lifecycle cost

-Low Prices

- Short lifetime

- Pollution

ECOrient 2014


The company concept case study economical study conclusion2

The Company | Concept | Case Study | Economical Study | Conclusion

PV Panels

  • Concept of a PV Diesel system:

Inverter

5 ¢/kWh

Public Grid

Load

10 ¢/kWh

Diesel Genset

28 ¢/kWh

ECOrient 2014


The company concept case study economical study conclusion3

The Company | Concept | Case Study | Economical Study | Conclusion

  • The PV system injects power to:

?

  • The Public Grid

  • The Diesel Genset Grid

Is this Solution Technically Feasible?

>

>

>

2000MW

1MW

ECOrient 2014


The company concept case study economical study conclusion4

The Company | Concept | Case Study | Economical Study | Conclusion

  • The PV power is synchronized with the Generators Power:

P

P

P

Load

Gen

PV

  • For a determined load, any variation of the PV power will Directly affect the Power produced by the Generators (indirect relation)

ECOrient 2014


The company concept case study economical study conclusion5

The Company | Concept | Case Study | Economical Study | Conclusion

  • The generator may work below its minimum acceptable load

  • If the power taken from the PV system is too big:

Reduce Service life

  • -Poor Combustion

  • -Deposit forming on turbo and exhaust

  • -Oil and lubricant consumption

  • Reverse current will be injected to the Stator of the Generator causing it to act as a load

Damage the Generator

  • -Stator Will heat and burn

  • If the variation of the PV power is big and relatively fast:

Poor Grid Quality

  • -Unstable Frequency

  • -High Distortion Levels

  • -Over/Under Voltage

Complete Shut Down of the Grid

  • Low spinning reserve: Generators incapable of taking full power of the PV system

ECOrient 2014


The company concept case study economical study conclusion6

The Company | Concept | Case Study | Economical Study | Conclusion

PV Panels

Inverter

Increase PV Power

Lower PV Power

Controller

Load

Diesel Genset

ECOrient 2014


The company concept case study economical study conclusion7

The Company | Concept | Case Study | Economical Study | Conclusion

The System Is Implemented,

Tested and Already in Service

5th in the World

1st in the Middle East

ECOrient 2014


The company concept case study economical study conclusion8

The Company | Concept | Case Study | Economical Study | Conclusion

  • Case Study:

  • API- ZoukMosbeh

  • -Location:

  • -Average Daily Load:

  • 450-600kW

  • - Power Sources:

  • Only Gensets

  • - Available Genset Power:

  • 3 X 635 KVA

  • - Yearly Diesel Consumption:

  • 900 Tons

  • -Installed PV Power:

  • 192 kWp

  • - Inverters:

  • 8 X 20KW

  • -Occupied Roof Surface:

  • 1200m²

ECOrient 2014


The company concept case study economical study conclusion9

The Company | Concept | Case Study | Economical Study | Conclusion

  • What can this PV System technically achieve?

  • 245,000 kWh annual energy yield

  • 70,000 litters/year of fuel consumption reduction

  • 170 tons/year of CO2 emission reduction

  • 4.6 tons/year of SO2 emission reduction

ECOrient 2014


The company concept case study economical study conclusion10

The Company | Concept | Case Study | Economical Study | Conclusion

  • What about the Economical study of the project?

  • The PV Electricity is very cheap: 5¢/kWh

  • Simple Payback 5.9 Years

  • Cost (¢/kWh)

  • The system’s Implementation cost was covered by a NEEREA Loan

  • Very Attrative Cash Flow

  • - No Down Payment

  • Granted By the EU by 5%

  • - 1.075% Interest rate

  • - Always Ascending

  • - 2 Years Grace Period

  • - Always Positive

  • - 8 Years Loan Period

  • - Real PBP = 0 Years

  • - 10 Years Total Loan Period

  • - NPV= 525,000$

  • - IRR= ∞ %

ECOrient 2014


The company concept case study economical study conclusion11

The Company | Concept | Case Study | Economical Study | Conclusion

  • Conclusion:

  • Technically Safe System

“I now own a half million dollar power plant on the roof of my factory which produces clean and cheap energy… And I did not pay a single penny”

  • Attractive Performance

  • Very Appealing Economical Results

Mr. Gaby AbouChedid, CEO,API.

  • The Tailored Fit PV/Diesel Hybrid Solution Opens New Horizons for Solar Power to Revolutionize the Lebanese Energy Sector.