ICE, CLOUD, AND LAND ELEVATION SATELLITE – 2 (ICESat-2) Snapshot Status June 16, 2010

ICE, CLOUD, AND LAND ELEVATION SATELLITE – 2 (ICESat-2) Snapshot Status June 16, 2010. ICESat-2 LRD: October, 2015 Project Phase: A Code 425.

tavorian
Download Presentation

ICE, CLOUD, AND LAND ELEVATION SATELLITE – 2 (ICESat-2) Snapshot Status June 16, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICE, CLOUD, AND LAND ELEVATION SATELLITE – 2 (ICESat-2) Snapshot Status June 16, 2010 ICESat-2 LRD: October, 2015 Project Phase: A Code 425 Project Manager: Doug MclennanDeputy Project Manager: VacantDeputy Project Manager Resources: Mark SeidleckProject Scientist: Thorsten MarkusChief Safety and Mission Assurance Officer: Nancy LindseyLead Mission Systems Engineer: Shane Hynes

  2. ICESat-2 Snapshot Topics

  3. ICESat-2 Mission Concept • In contrast to the ICESat design, ICESat-2 will use micro-pulse multi-beam photon-counting approach. • Provides: • Dense cross-track sampling to resolve surface slope on an orbit basis. • High repetition rate generates dense along-track sampling. • Advantages: • Improved elevation estimates over high slope areas and very rough (i.e., crevassed) areas. • Improved lead detection in sea ice. ICESat-2 Key Facts: Orbit: 600km, 91-day repeat, with monthly Sub-cycles, ICESat orbit Laser Rep. Rate:10 kHz Number of beams: 9, with unequal energy Along-track sampling: 70 cm Wavelength:532 nm Website: icesat.gsfc.nasa.gov/icesat2

  4. Current Science Activities • May 2010 SDT meeting Highlights: • Resolved open trades • Preliminary approval of design • Suggest revisions of Level 1 Science Requirements. ICESat-2 simulator for sea ice: • Land Ice sub-group: • Including forward-scattering effects. • Reassessment of whole ice-sheet requirement. • Several iterations with project on performance model. • Sea Ice sub-group: • Developed ICESat-2 simulator. • Analysis of lead-width distribution, lead detection ability. • Analysis of precision of lead sea surface height and freeboard measurements. • Ecosystem sub-group: • Working with sub-sampled photon counting data from SigmaSpace aircraft flights. • Five independent assessments of canopy detection. Simulated ICESat-2 data from aircraft flight with added solar background noise): Next SDT meeting: Seattle, WA Sept./Oct.: SRR overview, MABEL, performance assessment.

  5. ICESat-2 Aircraft Simulator: MABEL MABEL remains on schedule, and on budget for Oct. 2010 aircraft int. and Testing MABEL fiber box schematic: System Status: • Cost, Schedule, and Technical look good. • Preliminary review with flight operations (ER-2): layout, dimensions, specifications • Waiting for cost estimate for Goose Bay, Canada ops. In Spring 2011 (in conjunction with Op. IceBridge) Sub-system Status: • Laser progressing very well • Mechanical design progressing • Opto-mechanical parts ordered • Optical fibers and box on order • Prototype beam splitter in fabrication • Data system progressing. Developing new time of flight card. • Interface definition and design progressing. Simulated MABEL data over ice sheet (solar background noise removed): Next status update to SDT: May 10-12, Boulder CO

  6. LV Comparison CBE Instrument Mass 398kg NTE Spacecraft + PAF 734kg Propellant 197kg Total inc margins 1431kg

  7. ICESat-2 Launch Segment TDRSS GPS White Sands Complex (WSC) Science Team NSIDC Laser Ranging Station GES DAAC GSFC FDF Ground Network Conjunction Assessment Sci Computing Facility POD/PAD GPS Navigation Signal • L&EO support • Maneuver support • X-Band downlink • S-Band up & down • Precision Orbit • Precision Attitude • Off-Nadir Requests • Data Archive • Distro to Public • Ancillary Data Provider ICESat-2 Space Segment • Alg Development • Product Validation • Assess conjuncts Spacecraft ATLAS S-Band Contingency/Early Ops ICESat-II Observatory Raw Data, Telemetry Same as ICESat Tracking Data • Obs. Position ICESat-2 Ground Segment Maneuver/TOO Plans, Approvals X-Band Science S-Band CMD & TLM Mission Operations Center Science Investigator-Led Processing System Instrument Support Facility • Planning and Scheduling • Command and Control • Trending and Analysis • Flight Dynamics Raw Data, Cmds/ TLM • ATLAS Planning and Sched • ATLAS Health & Safety • ATLAS Cmd Generation • Process TOO Requests • Ingest L0 • Generate L1 & L2 Products • Store Mission Data • Provide data to SCF & NSIDC Level 0 Datasets L0 /1A data, Precision Orbit/ Attitude Data CMD Rqsts/ Telemetry Ephemeris Data/ Reports Ancillary NOAA Analysis Data Science Data & Plans Level 1-3 Products/ Algorithms Orbit Deter/ Maneuver Info Cal/plans Feedback Level 0-3 Products

  8. Instrument Overview • Multi-beam Micropulse Laser Altimeter • Single laser beam split into 9 beams • 10 m ground footprints • 10 kHz rep. rate laser (~1mj) • Multiple detector pixels per spot • On-board boresight alignment system • Laser Reference System gives absolute laser pointing knowledge Ground Track and Footprint Redundant Etalons and Detectors Boresight Alignment Mechanism LRS Radiators 0.5 to 1m telescope S/C provided trackers and SIRU Telescope Alignment Monitoring LTR Instrument Electronics Beam Expander Redundant Lasers

  9. Model Status • Tony’s charts

  10. Spacecraft Update • RSDO Study Status • Met with RSDO to review Study RFO. All looks good for a April 30 release (15 applicable docs nearing final draft) • Added 3 weeks to SC Study duration • 1 week for proposal and 2 weeks more for study • More time is better for vendors and project • Will fold results into SRR/MDR and SC procurement RFO • Extra study time moves study completion to Aug 13, which moves SC procurement RFO to Sep 10 and Award to Jan 11 • Extra study time increase study cost from $1.2M to $1.5M • RSDO vendor pool • Vendors awarded under RSDO Rapid-III include: Ball, GD, LM, NG, OSC, Surrey, Thales (France), Thales (Italy) • Ref attachment for catalogue specs • SRD status • SRD final review continues. Plan to complete final draft next week • Launch Vehicle • Using Delta-II 7320-10 as limiting case • Working with systems and instrument teams on mass, volume fit

  11. RAPID III CORE SPACECRAFT AND CAPABILITIES SUMMARY

  12. RAPID III CORE SPACECRAFT & OPTIONS

  13. RAPID II – RAPID III DIFFERENCES

  14. Budget & Schedule Fiscal Year Calendar Year