Accelerators r d at ific
This presentation is the property of its rightful owner.
Sponsored Links
1 / 8

Accelerators R&D at IFIC PowerPoint PPT Presentation


  • 48 Views
  • Uploaded on
  • Presentation posted in: General

Accelerators R&D at IFIC. Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V. Civera, C. Blanch. Main ongoing projects. ATF-ATF2 : Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

Download Presentation

Accelerators R&D at IFIC

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Accelerators r d at ific

Accelerators R&D at IFIC

Scientific Staff:

A. Faus-Golfe, C. Alabau, J.J. García,

S. Verdu, J. Alabau

Technical Staff:

J.V. Civera, C. Blanch

Enlight Meeting 09


Main ongoing projects

Main ongoing projects

  • ATF-ATF2:

    Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

    Instrumentation: New Multi-OTR system (SLAC, KEK)

    BPM supports with micromovers for FONT4 (KEK, JAI)

    CLIC-CTF3:BPM’s for TBL (UPC, CERN)

19 June

Enlight Meeting 09


Main ongoing projects1

Main ongoing projects

  • ATF-ATF2:

    Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

    Instrumentation: New Multi-OTR system (SLAC, KEK)

    BPM supports with micromovers for FONT4 (KEK, JAI)

    CLIC-CTF3:BPM’s for TBL (UPC, CERN)

Extraction line

drives the beam

from ATF to ATF2

19 June

Enlight Meeting 09


Main ongoing projects2

Main ongoing projects

  • ATF-ATF2:

    Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

    Instrumentation: New Multi-OTR system (SLAC, KEK)

    BPM supports with micromovers for FONT4 (KEK, JAI)

    CLIC-CTF3:BPM’s for TBL (UPC, CERN)

Since several years, the vertical emittance measured in the diagnostic section of the EXT line is significantly larger than the emittance measured in the DR.

Hypothesis:

Non-linear magnetic fields while passing off-axis through the shared magnets

19 June

Enlight Meeting 09


Main ongoing projects3

Main ongoing projects

  • ATF-ATF2:

    Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

    Instrumentation: New Multi-OTR system (SLAC, KEK)

    BPM supports with micromovers for FONT4 (KEK, JAI)

    CLIC-CTF3:BPM’s for TBL (UPC, CERN)

19 June

Enlight Meeting 09


Main ongoing projects4

Main ongoing projects

  • ATF-ATF2:

    Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

    Instrumentation: New Multi-OTR system (SLAC, KEK)

    BPM supports with micromovers for FONT4 (KEK, JAI)

    CLIC-CTF3:BPM’s for TBL (UPC, CERN)

BPM supports for micromovers:

Realignment of BPM to increase the resolution

FONT – Feedback On Nanosecond Timescales

19 June

Enlight Meeting 09


Main ongoing projects5

Main ongoing projects

  • ATF-ATF2:

    Beam dynamic studies and commissioning of the EXT line (LAL, KEK, SLAC)

    Instrumentation: New Multi-OTR system (SLAC, KEK)

    BPM supports with micromovers for FONT4 (KEK, JAI)

    CLIC-CTF3:BPM’s for TBL (UPC, CERN)

BPS Prototype

Inductive Pick-up (IPU)

19 June

Enlight Meeting 09


Main future projects

Main future projects

  • ILC: BDS instrumentation studies

  • LHC:non-linear collimation options for sLHC (SPS experiments) (EUCARD)

  • IFIMED:Imaging and Accelerators applied to Medicicine

    • Monitoring of secondary beams (beam position and size) (CERN; LLR, CNAO)

    • Cyclinacs applications (TERA, CTF3)

  • Beam screen monitor

  • CABOTO: Carbon Boster for Therapy in Oncology


  • Login