Lifecycle Relationships
This presentation is the property of its rightful owner.
Sponsored Links
1 / 2

Lifecycle Relationships PowerPoint PPT Presentation


  • 55 Views
  • Uploaded on
  • Presentation posted in: General

Lifecycle Relationships. SDLC. System Initiation. System Requirement Analysis. System Design. System Construction. System Acceptance. System Implementation. Validated Business Requirements & Models. Integration & System Test Results. Acceptance Test Results. Deploy System.

Download Presentation

Lifecycle Relationships

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Lifecycle relationships

Lifecycle Relationships

SDLC

System

Initiation

System Requirement

Analysis

System

Design

System

Construction

System

Acceptance

System

Implementation

ValidatedBusiness Requirements & Models

Integration & System Test Results

Acceptance Test Results

Deploy System

ValidatedSolution

System Prototype

ProjectManagement

Project Plan

Origination

Initiation

Planning

Execution & Control

Closeout

BPM

Current Environment Report

Best Practice

Report

Target Environment Report

Deploy

Processes

Current Environment

Analysis

Best Practice

Research

Target Environment

Definition

Process

Construction

Implementation

Continuous

Improvement


Lifecycle relationships

Business Process Management Lifecycle

Current Environment Analysis

Best Practice Research

Target Environment Definition

Process Construction

Implementation

Continuous Improvement

Prepare for

Current

Environment

Analysis

Prepare for

Best Practices

Research

Define the

Target

Environment

Build Processes

Refine

Implementation

Strategy

Transition to

Performing

Organization

“To-Be”

Models

Key inputs,

Outputs,

Deliverables

Define

Performance

Measures

Create

Performance

Measurement

System

Develop

Process

Goals

Build

Performance

Measurement

System

Develop

Continuous

Improvement

Approach

Conceptual

Design

Detailed

Design

Conduct Best

Practices

Research

Document Current

Environment

Conduct

Gap

Analysis

Test and

Validate

Processes

Implement

Business

Processes

“As-Is”

Models

Fit-Gap

Report

Prototype,

Simulation,

Pilot

Results

Deployed

Processes

Execute

Continuous

Improvement

Activities

Perform Data

Analysis

Produce Business

and System

Requirements

Develop

Implementation

Strategy

Finalize and Issue

Report

Refine User

and Training

Materials

Produce User

and Training

Materials

Validate the

Current

Environment

Validate the

Target

Environment

Current

Environment

Report

Best

Practices

Report

Target

Environment

Report

User and

Training

Materials

Refined

Materials

Revised 3-13-07


  • Login