1 / 58

Economics of the Firm

Economics of the Firm. Cost Analysis. Primary Managerial Objective:. Minimize costs for a given production level (potentially subject to on or more constraints). Example: PG&E would like to meet the daily electricity demands of its 5.1 Million customers for the lowest possible cost. Or.

tansy
Download Presentation

Economics of the Firm

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Economics of the Firm Cost Analysis

  2. Primary Managerial Objective: Minimize costs for a given production level (potentially subject to on or more constraints) Example: PG&E would like to meet the daily electricity demands of its 5.1 Million customers for the lowest possible cost Or Maximize production levels while operating within a given budget Example: George Steinbrenner and would like to maximize the production of the NY Yankees while staying within the salary cap

  3. Note: Economic Costs vs. Accounting Costs Example: You decide to open a lemonade stand. You spend $100 building the stand and $50 on supplies. After your first day (you worked 8 hours), you have collected $200 in revenues Profit (Accounting): $200 - $50 - $100 Economic profit accounts for the opportunity cost of your time and money. Suppose that you have a bank account that earns 5% interest annually and that you could have worked at the local grocery for $8/hr Profit (Economic): $200 - $50 - $100 - $150(5%/365) - $8*8 Value of your time Lost Interest

  4. The starting point for this analysis is to think carefully about where your output comes from. That is, how would you describe your production process “is a function of” Production Level One or more inputs A production function is an attempt to describe what inputs are involved in your production process and how varying inputs affects production levels Note: We are not trying to perfectly match reality…we are only trying to approximate it!!!

  5. Some production processes might be able to be described fairly easily: Sugar (Lbs) Your Time (Minutes) Booth(s) Water (Gallons) Lemons Paper Cups 8 Oz. Glasses of Lemonade With a fixed recipe for lemonade, this will probably be a very linear production process

  6. Lemonade recipe (per 8oz glass) • Squeeze 1 Lemon into an 8 oz glass • Add 2 oz. of Sugar • Add 8 oz. of Water • Stir for 1 minute to mix 2 oz for each glass times 16 glasses = 2 lbs We need a booth to sell the lemonade! 16 Cups will be needed 16 glasses available for sale 1 Lemon per glass 1 Gallon of Water Makes 16 8 oz glasses 1 minute per glass to stir each 8 oz glass

  7. In fact, we could write the production function very compactly: • Lemonade recipe (per 8oz glass) • Squeeze 1 Lemon into an 8 oz glass • Add 2 oz. of Sugar • Add 8 oz. of Water • Stir for 1 minute to mix # of Lemonade “Kits” (one “kit” = 1 Lemon, 2oz. Sugar, 8 oz. Water, 1 Minute) Indicator Function

  8. Or, we can look at this graphically Glasses available for sale Slope = 1 # of Lemonade “Kits” (one “kit” = 1 Lemon, 2oz. Sugar, 8 oz. Water, 1 Minute)

  9. Some production processes might be more difficult to specify: How would you describe the production function for the business school? Input(s) Output(s)

  10. How would you describe the production function for the business school? What is the “product” of Mendoza College of Business? YOU ARE! Finance Undergraduate (BA) Accounting 1 Year MBA (MBA) Marketing Management 2 Year MBA (MBA) Degrees South Bend EMBA (MBA) Chicago EMBA (MBA) Masters of Accountancy (MA) Masters of Nonprofit Administration (MA)

  11. How would you describe the production function for the business school? How would you characterize the “inputs” into Mendoza College of Business • Facilities • Classroom Space • Office Space • Conference/Meeting Rooms • Personnel • Faculty (By Discipline) • Administrative • Administrative Support • Maintenance • Equipment • Information Technologies • Communications • Instructional Equipment Staff Labor Inputs Capital Inputs

  12. How would you describe the production function for the business school? Have we left out an output? Notre Dame, like any other university, is involved in both the production of knowledge (research) as well as the distribution of knowledge (degree programs) Should the two outputs be treated as separate production processes?

  13. The next question would be: What is your ultimate objective? Is Notre Dame trying to maximize the quantity and quality of research and teaching while operating within a budget? OR Is Notre Dame trying to minimize costs while maintaining enrollments, maintaining high research standards and a top quality education? Does it matter?

  14. The Notre Dame Decision Tree Under the golden dome, resources are allocated across colleges to maximize the value of Notre Dame taking into account enrollment projections, research reputation, education quality, and endowment/resource constraints School of Architecture College of Arts & Letters College of Business School of Architecture School of Architecture Given the resources handed down to her, Dean Woo allocates resources across departments to maximize the value of a Business Degree and to maximize research output. Finance Department Management Department Marketing Department Accounting Department Graduate Programs Department chairs receive resources from Dean Woo and allocate those resources to maximize the output (research and teaching) of the department

  15. Another issue has to do with planning horizon. Different resources are treated as unchangeable (fixed) over various time horizons It might take 5 years to design/build a new classroom building It could take 6 months to install a new computer network Now 6 mo 1 yr 2 yr 5 yr 10 yr It takes 1 year to hire a new faculty member Tenured faculty are essentially can’t be let go Shorter planning horizons will involve more factors that will be considered fixed

  16. From here on, lets keep things as simple as possible… You produce a single output. There is no distinction as far as quality is concerned, so all we are concerned with is quantity. You require two types of input in your production process (capital and labor). Labor inputs can be adjusted instantaneously, but capital adjustments require at least 1 year “Is a function of” Total Production Capital (Fixed for any planning horizon under 1 year Labor (always adjustable)

  17. Some definitions Marginal Product: marginal product measures the change in total production associated with a small change in one factor, holding all other factors fixed Average Product: average product measures the ratio of input to output Elasticity of Production: marginal product measures the change in total production associated with a small change in one factor, holding all other factors fixed

  18. Over a short planning horizon, when many factors are considered fixed (in this case, capital), the key property of production is the marginal product of labor. For a given production function, the marginal product of labor measures how production responds to small changes in labor effort OR Diminishing Marginal Returns: As labor input increases, production increases, but at a decreasing rate Increasing Marginal Returns: As labor input increases, production increases, but at an increasing rate

  19. Consider the following numerical example: We start with a production function defining the relationship between capital, labor, and production Capital is fixed in the short run. Let’s assume that K = 1 Suppose that L = 20.

  20. Quantity 96.8 Labor Maximum Production reached at L =70

  21. Now, let’s calculate some of the descriptive statistics Recall, K = 1

  22. The properties of the marginal product of labor will determine the properties of the other descriptive statistics MP hits a maximum at L = 35 1 Elasticity of production less than one indicates MP<AP (Average product is falling) Elasticity of production greater than one indicates MP>AP (Average product is rising)

  23. Recall our managerial objective: Minimize costs for a given production level (potentially subject to on or more constraints) Let’s imagine a simple environment where you can take the cost of labor as a constant. Suppose that labor costs $10/hr and that you have one unit of capital with overhead expenses of $30. You have a production target of 450 units: =1 Objective Constraint

  24. With only one variable factor, there is no optimization. The production constraint determines the level of the variable factor. 450 Quantity Labor 450 Units of production requires 60 hours of labor (assuming that K=1)

  25. Let’s imagine a simple environment where you can take the cost of labor as a constant. Suppose that labor costs $10/hr and that you have one unit of capital with overhead expenses of $30. You have a production target of 450 units: =1 Total Costs Objective Constraint Solution: L = 60 Suppose that you increase your production target to 451. How would your costs be affected? Total Costs = 30 + 10(60) = $630 Average Costs = $630/450 = $1.40 Average Variable Costs = $600/450 = $1.33

  26. If the marginal product of labor measures output per unit labor, then the inverse measures labor required per unit output We also know that the average variable cost is related to the inverse of average product

  27. Properties of production translate directly to properties of cost MC<AVC. Average Variable Cost is falling MC>AVC. Average Variable Cost is Rising MC hits a minimum at L = 35 Labor Elasticity of production less than one indicates MP<AP (Average product is falling) Elasticity of production greater than one indicates MP>AP (Average product is rising)

  28. For now, we are only dealing with the cost side, but eventually, we will be maximizing profits. =1 Total Costs Objective Constraint We just minimized costs of one particular production target. Maximizing profits involves varying the production target (knowing that you will minimize the costs of any particular target). There should be one unique production target that is associated with maximum profits: Maximum Profits Optimal Factor Use

  29. Recall the alternative management objective: Maximize production levels while operating within a given budget Let’s imagine a simple environment where you can take the cost of labor as a constant. Suppose that labor costs $10/hr and that you have one unit of capital with overhead expenses of $30. You have a production budget of $630: Total Output Available budget Constraint Objective

  30. Just like before, there is no optimization. The budget constraint determines the level of the variable factor. 630 Cost Labor $630 budget restricts you to 60 hours of labor (assuming that overhead = $30)

  31. Total Output Available budget Constraint Objective Now, if we were to think about altering the objective we would be considering the effect on production of a $1 increase in the budget: Change in production Now, take the profit maximizing condition and flip it Change in Budget Both managerial objectives yield the identical result!!! Optimal Factor Use

  32. Now, let’s move from the short term to the long term Let’s imagine a simple environment where you can take the cost of labor and the cost of capital as a constant. Suppose that labor costs $10/hr and that capital costs $30. You have a production target of 450 units: Total Costs Objective Constraint Now we have two variables to solve for instead of just one!

  33. Consider two potential choices for Capital and Labor L = 13 K = 30 TC = 30*10 + 13*10 = $430 AC = $430/450 = $0.95 L = 33 K = 2 TC = 30*2 + 33*10 = $390 AC = $390/450 = $0.86 This procedure is relatively labor intensive This procedure is relatively capital intensive With more than one input, there should be multiple combinations of inputs that will produce the same level of output

  34. An isoquant refers to the various combinations of inputs that generate the same level of production Labor Our managerial objective is to find the combination of inputs on this isoquant that is associated with the lowest costs L = 33 L = 13 Capital K = 2 K = 30

  35. A key property of production in the long run has to do with the substitutability between multiple inputs. Labor Capital The Technical rate of substitution (TRS) measures the amount of one input required to replace each unit of an alternative input and maintain constant production

  36. Recall some earlier definitions: Marginal Product of Labor Marginal Product of Capital Labor If you are using a lot of capital and very little labor, TRS is big Capital

  37. Technical rate of Substitution measures the degree in which you can alter the mix of inputs in production. Consider a couple extreme cases: Perfect substitutes can always be can always be traded off in a constant ratio Perfect compliments have no substitutability and must me used in fixed ratios Labor Labor Capital Capital

  38. Back to the problem at hand: Total Costs Objective Constraint We know one production choice that satisfies the constraint L = 33 K = 2 TC = 30*2 + 33*10 = $390

  39. Suppose that we lowered production by 1 unit by decreasing labor. What would happen to costs? Labor $10 Total Cost = 30*2 + 33*10 = $390 33 20 MC = $.50 Capital 2

  40. Now, let’s increase production by one unit to get back to our initial production level by increasing capital $30 Labor 212 MC = $.50 33 By altering the production process slightly, we were able to maintain 450 units of production and save .$36! MC = $.14 Capital 2

  41. Here, we have too much labor. We can save costs by substituting capital for labor Here, we have too much capital. We can save costs by substituting labor for capital Labor 33 11 Capital 2 15

  42. Labor Total Cost = 30*4 + 10*22 = $340 Average Cost = $.75 22 Capital 4

  43. Labor Slope = TRS 22 Capital 4 Slope = P/w

  44. Short Run vs. Long Run Solution: L = 60 (K Fixed at 1) Solution: L = 22, K = 4 Total Costs = 30 + 10(60) = $630 Average Costs = $630/450 = $1.40 Average Variable Costs = $600/450 = $1.33 Total Cost = 30*4 + 10*22 = $340 Average Cost = $.75 Long Run Average Cost will always be less than or equal short run average costs due to the increased flexibility of inputs

  45. Each point on the long run average cost curve should represent the minimum of some short run average cost curve Average Cost SRAC SRAC SRAC SRAC LRAC $1.40 $0.75 Quantity 450

  46. Suppose that the price of labor rises to $50 Solution: L = 60 (K Fixed at 1) In the short run, factor price changes can’t be avoided without affecting the production target, so costs are very sensitive to factor price changes Total Costs = 30 + 10(60) = $630 Average Costs = $630/450 = $1.40 Average Variable Costs = $600/450 = $1.33 Solution: L = 60 (K Fixed at 1) Total Costs = 30 + 30(50) = $1,530 Average Costs = $1,830/450 = $3.40

  47. Suppose that the price of labor rises to $60 Labor In the long run, if your production technique is flexible, you can avoid cost increases! 22 13 Capital 4 10

  48. The elasticity of substitution measures curvature of the production function (flexibility of production) TRS=12 TRS=9

  49. Elasticity of substitution determines the response of costs to changes in input prices Low elasticity of substitution means that production is very inflexible Low price elasticity means that factor demands don’t respond to factor prices Costs are very sensitive to factor price changes

  50. Elasticity of substitution determines the response of costs to changes in input prices High elasticity of substitution means that production is very flexible High price elasticity means that factor demands respond significantly to factor prices Costs are very insensitive to factor price changes

More Related