An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Optics: design, procurement, assembly and testing plans Dr Peter Doel, University College London

  2. Contents WBS 1.4 • Optical design 1.41- 1.4.2 • Optics procurement and manufacture 1.4.3 -1.4.5, 1.4.9 • Lens cell design and lens mounting 1.46 -1.47 • Lens alignment in camera 1.48

  3. Optics Roles • University College London • Optics procurement and testing • Lens cell design/construction and mounting • Optical alignment • University of Michigan • Optical Design/Stray light analysis • Filter procurement • Filter mechanism design/build • Shutter design /build • Fermilab • Barrel design/build • Chicago • Active alignment sensing

  4. Optical Specification • Field of view • 2.2 degree diameter • Pixel scale • 57 µm/pixel (f/2.9) • Image quality: • Resolution Element: < 2.25 pix (0.59”, 34µm) • Goal (as-built) fwhm: ~ 0.33” (18 µm) • Goal (design) fwhm: ~ 0.27” (15 µm) RMS spot size Rrms= 8.7µm (area weighted) • Wavelengths: • g, r, i, z (0.4 – 1.0 µm) • with a secondary goal of good performance down to 0.32 µm • System throughput • Greater than 60% over the focal plane • Pupil ghost: • intensity gradient < 3% over 61mm

  5. Status of Optical Design • Preliminary design development (Nov 2005-Feb 2006) • Number of elements • Glass choice • Overall size and volume (diameter of first element) • Number of aspheric lens surfaces • Preliminary Design Review (Feb 2006) • Final design development (Feb-Oct 2006) • Feedback from PDR included and optimisation of design • Preliminary sensitivity analysis completed • Critical Design Review (Feb 2007) • UK provisional location • Final review before placing orders

  6. Optical Design • 5 lens design • All fused silica • Two aspheric surfaces • C1 lens diameter 0.98m • Minimum thickness ratio 1:10 • Image scale 1" = 57μm • 0.26"/pixel • Sol-Gel/MgF2 coatings • Rrms= 8.7 um Design due to Rebecca Bernstein

  7. Lens Parameters * Aspheric surface

  8. Blank Procurement WBS 1.4.3 :Status • Preliminary blank specification (Nov 2005-Feb 2006) • Choice of blank material (fused silica, BSL7-Y,etc) • Discussion with manufacturers (Corning, Ohara, Schott, Heraeus) • Availability • Manufacturing issues (slumping, homogeneity) • Schedule • Cost • Fused Silica chosen (Corning, Heraeus) • Good performance (especially in blue) • Available in sizes and homogeneity required • Production schedule ok • Tender will be issued in December 2006

  9. Corning Fused Silica HPFS Grade C is quoted as have a homogeneity of better than 2ppm. B is better that 1.5ppm and A better than 1ppm. The numeric refers to the inclusions: 1 has a total inclusion cross section per 100cm3 of glass of less than or equal to 0.1mm2 and 0 less or equal to 0.03mm2

  10. Optics Polishing WBS 1.4.5 :Status • Input to preliminary optical design (Nov 2005-Feb 2006) • Discussion with manufacturers (SAGEM, SESO, Tinsley) • Manufacturing issues • Lens size • Asphere on convex or concave surface • Size/gradient of asphere • Slope 1mm departure over 50mm was acceptable • All companies happy to quote on the proposed (or similar) design • Testing issues • All optics tested in transmission to allow compensation for inhomogeneity • Schedule • Cost • Tender for polishing will be issued in February 2007 • This will state optical specification and requirements on testing results during manufacture

  11. DES Filters WBS 1.4.9 :Status U. Michigan will • handle procurement and testing of the filters • match SDSS – g,r,i,z and introduce a well defined cut-off at high wavelength • design and fabricate or procure a combined filter changer and shutter

  12. Filters bids as of June 2006 (Bruce Bigelow)

  13. Optics Assembly and Test • Lens mounting C1-C4 (WBS1.4.6) UCL • Design of lens cell and bonding technique (FEA, testing) • Handling of lenses • Alignment procedure definition • Lens mounting C5 (WBS 1.4.7) FermiLab • Bonded straight to detector vessel • Design of lens cell and bonding technique (FEA, testing) • Alignment procedure definition • Alignment of lenses in barrel (WBS 1.4.8) UCL • Handling of lens and cells • Alignment procedure definition

  14. Production Procedure • Blanks produced and ground to shape (US?) • Blanks shipped to optical polishers (France?US?) • Polished lenses shipped for coating (C1 and C5 could be coated by polishing firms) (US) • Coated lenses shipped to UCL • Lenses mounted in lens cells at UCL • Lens and cells mounted in camera barrel at UCL • Shipped to CTIO

  15. Alignment Tolerances

  16. Lens Mounting • Baseline athermal elastomeric (RTV rubber) bonding technique • Looking at two cell options • Invar lens cell + flexures + thin RTV layer (see figure) • Steel cell + thick RTV layer LBT lens mounting (from Diolaiti et al. SPIE 4841)

  17. Lens to Cell Alignment • Lens to cell • Lens to cell alignment performed using rotary table and digital dial gauges. RTV inserted into gap D.G.I. Cell Adjustment Screws Cell Translation Stage Lens Rotary Table

  18. Lens/cell to Barrel Lens-cell alignment in barrel • Mechanical alignment • Passive: using machined fiducials • Active: using rotary table and digital dial gauges • Optical Alignment (see figures) • Using rotary table and laser beam

  19. Optics Cost/Time Allocated

  20. Milestones