autonomous region of friuli giulia alpcity project work package 7 urban environment
Download
Skip this Video
Download Presentation
AUTONOMOUS REGION OF FRIULI GIULIA ALPCITY PROJECT : WORK PACKAGE 7 “ Urban Environment ”

Loading in 2 Seconds...

play fullscreen
1 / 10

AUTONOMOUS REGION OF FRIULI GIULIA ALPCITY PROJECT : WORK PACKAGE 7 “ Urban Environment ” - PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on

AUTONOMOUS REGION OF FRIULI GIULIA ALPCITY PROJECT : WORK PACKAGE 7 “ Urban Environment ”. WP6 Transnational Co-ordinator Pierpaolo Suber. SUMMARY. Local planned activities of the Region FVG Key case 1 Key case 2 Key cases steps. TIMEFRAME. WP time frame as scheduled in the AF

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' AUTONOMOUS REGION OF FRIULI GIULIA ALPCITY PROJECT : WORK PACKAGE 7 “ Urban Environment ” ' - tanisha-gilliam


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
autonomous region of friuli giulia alpcity project work package 7 urban environment

AUTONOMOUS REGION OF FRIULI GIULIAALPCITY PROJECT :WORK PACKAGE 7 “Urban Environment”

WP6 Transnational Co-ordinatorPierpaolo Suber

summary
SUMMARY
  • Local planned activities of the Region FVG
    • Key case 1
    • Key case 2
  • Key cases steps
timeframe
TIMEFRAME

WP time frame as scheduled in the AF

  • WP duration: 20 months
  • WP starting date: September 2004
  • WP ending date: April 2006
planned activities
PLANNED ACTIVITIES

PROJECT CONCEPT

Starting from the project idea designed to enhance the

endogenousresources of alpine settlements, the

Region of FVG, considering that such small

administrations have difficulties in terms of size,

financial capacity and professional skills, intends

financing pilot studies and planning activities.

planned activities1
PLANNED ACTIVITIES

These activities foresee two different key studies:

1) guidelines for the recovery of abandoned areas in the neighbourhood of the borders with Austria and Slovenia ( involving the area of Tarvisio);

2) guidelines for obtaining the environmental certification (involving the area of Forni di Sopra),

These activities should reach at least the level of a

“pre-feasibility project”, including the project financing

necessary to them actually being carried out.

steps
STEPS

Key Study 1

  • Preliminary analysis of the endogenous resources and of the existing potentialities connected to the recovery of the abandoned areas;
  • comparison of the ideas that have arisen at a local level together with the trans-national best practices concerning similar problems;
steps1
STEPS
  • definition of guidelines, planning and pre-feasibility project for the recovery of dismantled areas and structures.

The University of Udine (Department of Civil

Engineering) will be appointed to carry out the

guidelines and the pre-feasibility project.

steps2
STEPS

Key Study 2

  • Preliminary analysis of the endogenous resources and of the existing potentialities connected to the enhancement of the natural landscape;
  • definition of guidelines in order to obtain environmental certification;
  • preparation and dissemination to Local Authorities of a special manual.
presentation of results
PRESENTATION OF RESULTS
  • The presentation of WP7 results to the local authorities of the regional mountain areas will take place in May 2006.
  • The AlpCity outputs will be disseminated during the Summer, after the final general international conference of the project scheduled in June 2006.
ad