An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IRWA BUSINESS MEETING Will County FY 2012

  2. Build Will update • 2008 • Build Will unveiled • 60 projects on County Highway System • $300 million program • Funded with • RTA sales tax • Federal, State, & other Local funding sources • 2009-Present • Additional 12 projects • Total additional cost $57 million • $100 million in bonds approved by County Board

  3. Build will update (cont.) • Largest Overlay Program in History • Last 2 Years • 84 Center-line Miles • 25 County Highways • FY 2012 • 36 Center-line Miles • 14 County Highways • Total estimated cost $10 million • 3 Year Total • 120 Center-line Miles • 39 County Highways

  4. FY 2012 Program

  5. 2012 Projects

  6. 2012 PROjects

  7. Program highlights • Weber Road @ Renwick Road • 135th Street @ Il Route 171 (Archer Avenue) • 95th Street Extension (Plainfield-Naperville Road to Boughton Road) • Will-Peotone Road @ Old Chicago Road over Jordan Creek • South Briggs over Metra & Hickory Creek

  8. Weber road @ renwick road • Scope • Weber Road • Widen to 6 lanes • Barrier Median • Renwick Road • Widen to 4 lanes • Barrier Medians • Total Cost: $ 14 million • Approximately $ 4 million in Federal Funds (STP & CMAQ) • Quick Take approved for ROW acquisition

  9. 135th Street @ IL Route 171(archer avenue) • Scope of Work • Realign Intersection • New Structure over Long Run Creek • Total Cost: $ 7.1 million

  10. 95th Street Extension:Plainfield-Naperville Road to Boughton Road • Scope • Approximately 2 miles of new Roadway • New Structure over DuPage River • Intersection Improvements at termini • Noise Walls • Total Cost: $ 25.9 million • Funding: Over $10 million in Federal Funds (STP & STR)

  11. Will-peotone road @ old Chicago road • Scope • Turn Lanes on all legs • Reconstruction of Structures over Jordan Creek on both roads • Total Cost: $7.04 million

  12. South Briggs Street Over Metra & hickory creek • Scope: Structure Rehabilitation • Total Cost: $2.5 million

  13. Job creation • According to Labor Statistics • 42, 000 jobs are created • Per $1 billion in Construction • Build Will FY 2012 Creates: 2210 jobs

  14. PIPELINE PERMITS • Communicate early • Call ahead to confirm jurisdiction is Will County Highway and type of permit required • Confirm permit fee, if applicable, before sending check • Permit application along with plans, scope of work. Also will need cost estimate, schedule, insurance, utility annual letter of credit or bond

  15. PIPELINE PERMITS • Utility Annual Letter of Credit or Bond • $15,000 • guarantees restoration of ROW • Annual auto renewal • Covers all future projects in ROW • Insurance • In accordance with IDOT Standard Specifications

  16. PIPELINE PERMITS • 2 Situations • 1. Initiated by Pipeline • Maintenance • BP on Western & Exchange • Closed one direction • required Detour plan • Development • Enbridge on Cedar Rd • New temporary entrance on to Cedar • required Access Permit

  17. PIPELINE PERMITS • 2 Situations • 2. Initiated by Will County Highway Department • Public Improvements • ONEOK on Plainfield-Naperville Rd at 119th St • Relocate 8” high pressure main parallel to centerline • Wetland issues • Exxon-Mobil and BP on Wilmington-Peotone Rd and Old Chicago Rd (extend casings) • Concrete cap in ditch versus lower pipeline • Wolverine and BP on Exchange St curve (lower pipeline) • Backfill with CLSM versus sand under proposed road

  18. Backfill • Under pavement, including up to 2 FT outside pavement • Required to ensure suitable subgrade • Trench Backfill • Mix of fine and coarse aggregate, like CA-6 • Placed in lifts, external compaction required, more labor • IDOT Standard Spec Section 208 • Controlled Low-Strength Material (CLSM) • Pour in place, like low strength concrete • Deep excavations • Placed in lifts, self compacting, less labor • IDOT Standard Spec Section 593

  19. BORE • Bore deep under road right-of-way • Including deep under ditches and future ditches • 150 FT Total Right-of-Way for SRA Routes • 120 FT Total Right-of-Way for other County Highways • Prefer minimum 10 FT below existing centerline top of pavement elevation • Avoid having to lower for future road improvements • Bore pits at least 10 FT from edge of pavement • Pothole to expose other utilities • Prefer vacuum excavation • Utility responsibility for maintaining cut • Restore landscaping with blanket/seed

  20. OTHER REQUIREMENTS • Removal of retired pipe • Required under proposed pavement • Required where conflicts with proposed storm sewer • Regulations • Traffic Control • MUTCD • Environmental • USACOE Wetland Permit • Storm Water Pollution Prevention Plan (SWPP) including Sediment Control Plan • Pipeline decision if required • Will County Highway plans only cover activity once road contractor mobilized

  21. Questions? Patti Killinger, PE - Permit Engineer (Utilities) Will County Department of Highways, 16841 W Laraway Rd, Joliet, IL 60433 (815) 727-8476 phone, (815) 405-0901 cell, (815) 727-9806 fax pkillinger@willcountyillinois.com Eric K. Wesel, PE - Permit Engineer (Access) Will County Department of Highways, 16841 W Laraway Rd, Joliet, IL 60433 (815) 727-8476 phone, (815) 727-9806 fax ewesel@willcountyillinois.com