OTV 3-D GEOMETRY & INTEGRATION. Korey LeMond STRC/THM/INTEG GL, OTV Phase. 1. C-Channel. Shear Panel. Xe Tank Support. Rivet Pad. Truss Support System. Payload Fairing Adapter. [Korey LeMond] [STRC/THM/INTEG/CAD GL, Locomotion Phase]. 2. 3. Solid View of Lower Structural Geometry.

Download Presentation

OTV 3-D GEOMETRY & INTEGRATION

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Otv 3 d geometry integration

OTV 3-D GEOMETRY & INTEGRATION

KoreyLeMond

STRC/THM/INTEG GL,OTV Phase

[Korey LeMond] [STRC/THM/INTEG/CAD GL,OTV Phase]

1


Otv 3 d geometry integration

C-Channel

Shear Panel

Xe Tank Support

Rivet Pad

Truss Support System

Payload Fairing Adapter

[Korey LeMond] [STRC/THM/INTEG/CAD GL,Locomotion Phase]

2


Otv 3 d geometry integration

[Korey LeMond] [STRC/THM/INTEG/CAD GL,Locomotion Phase]

3


Otv 3 d geometry integration

Solid View of Lower Structural Geometry

[Korey LeMond] [STRC/THM/INTEG/CAD GL,Locomotion Phase]

4


Otv 3 d geometry integration

Four Member Truss Support System

Welded Joint

Aluminum Truss System with total weight of 3.25 kg

Pinned Joint

[Korey LeMond] [STRC/THM/INTEG/CAD GL,Locomotion Phase]

5


Otv 3 d geometry integration

Payload Fairing Adapter

Rivet Holes to attach to OTV

Aluminum part with total weight of 10.3 kg, but can be jettisoned with PyroBolts before TLI

[Korey LeMond] [STRC/THM/INTEG/CAD GL,Locomotion Phase]

6


Otv 3 d geometry integration

Truss Support Pad

Serves to keep Xe tank in place, more than likely two rings will be needed. Three pads are connected to each ring, although only one is shown. The entire system weighs 1 kg.

Ultra thin pad to hold Xe tank in place

Welded Joint directly onto Truss Support System

Rivet

[Korey LeMond] [STRC/THM/INTEG/CAD GL,Locomotion Phase]

7


Otv 3 d geometry integration

C-Channel Stiffener

Curved face to rivet or braze directly onto shear panel. Rivets introduce stress risers, while brazing the components together results in a joint 1/3 the strength of the Mg alloy

Entire C-Channel system of 6 C-Channels weighs only 6 kg total.

[Korey LeMond] [STRC/THM/INTEG/CAD GL,Locomotion Phase]

8


Otv 3 d geometry integration

Shear Paneling

.0005 mm thick sheet of wrought Magnesium Alloy, either riveted together upon overlap, brazed upon overlap, or bonded with adhesive to form a lap joint

Serves as a surface to conduct heat away from the electronics module, to protect all components from incident radiation, as an integration interface for all vital structural components and solar arrays, and weighs 9 kg.

[Korey LeMond] [STRC/THM/INTEG/CAD GL,Locomotion Phase]

9


  • Login