1 / 24

LWC-04 On Whimpey Creek

Horizontal Plastic Belt POD Screen. LWC-04 On Whimpey Creek. Process – Start to Finish. Design ideas Contact Hydrolox and purchase materials Overcoming problems during fabrication Input from engineer Changes during fabrication Finding a site for installation Installation

tameka
Download Presentation

LWC-04 On Whimpey Creek

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Horizontal Plastic Belt POD Screen LWC-04 On Whimpey Creek

  2. Process – Start to Finish • Design ideas • Contact Hydrolox and purchase materials • Overcoming problems during fabrication • Input from engineer • Changes during fabrication • Finding a site for installation • Installation • Monitoring and evaluating screen operation

  3. Need for other types of POD screens • Idea to build a horizontal plastic belt screen • Fabrication crew talking about ideas and materials • Jim Jones contacted Hydrolox and ordered plastic belt materials after discussions with their Engineers • Harvey Goddard assigned to take lead on project

  4. Monitoring and Evaluation • 2.47 cfs design flow • Hydrolox Series 1800 mesh top with 37% open area • 1.10 cfs measured flow • Water level was to low to accurately evaluate both sweeping velocity and velocity through the screen

More Related