Ministère des Transports du Québec (MTQ) involvement at the Canada / United States border

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ministère des Transports du Québec (MTQ) involvement at the Canada / United States border Transportation Border Working Group

  2. Plan • Portrait of Québec’s economy • Ministère des Transports du Québec and the Canada/United States border • Facts and observations • MTQ’s involvement with Beyond the Border action plan • Priorities and next steps • Canada-U.S. rail passengers services (Serge Routhier)

  3. Québec’s economy • Value of trade between Québec and the United States (2012): CA$ 69.2 G (63% of exports) • Major state partners: • New York State: CA$ 7.7 G • Vermont: CA$ 4.1 G • Texas: CA$ 5.3 G • Michigan, Ohio, Pennsylvania: CA$ 3.5 G • 62% of the value of trade carried by trucks; • 75% of trucks entering Québec are registered in Canada

  4. Québec and the Canada – U.S. Border • 32 international road crossings; • New York State (10) • Vermont (15) • Maine (6) • New Hampshire (1) • 6 rail crossings. • In 2012: • 6.9 millions vehicles (both directions) including 1.2 million trucks (17.4%) • 80% of commercial traffic uses 4 main ports of entry • Smaller crossings play key role for local economies and communities

  5. Québec – U.S. Truck flows

  6. Interests and role at the border • Interests: • Road safety; • Fluidity of people and goods (all modes); • Helping maintain security; • Supporting economic growth; • Informing and supporting the trucking industry and the trade community. • Role: • Road infrastructure; • Policies; • Partnerships.

  7. Infrastructure • Recent projects at the border: • Additions of dedicated truck lanes at three major commercial ports of entry (2007-2010): • Saint-Bernard-de-Lacolle/Champlain, NYS (A-15); • Stanstead/Derby Line, Vt (A-55); • Armstrong/Jackman, ME (Rte173). • Completion of A-30 South of Montréal (Fall 2012): • more than 2 500 heavy vehicles each day; • provides a new alternative to avoid the island of Montréal for East-West trips. • Upcoming projects: • Extension of A-35 between Saint-Jean-sur-Richelieu and Saint-Armand/Highgates Springs, Vt. • MTQ – VTrans restoration of Sutton / East Richford Bridge.

  8. Partnerships • Québec has signed cooperative agreements with three States: • New York (2002); • Vermont (2003 and updated in 2013); • Maine (2013). • These agreement call for cooperation in the area of transportation, for example: • Working togheter on transport issues of common interest at the border; • Collaborating with federal Canadian and American agencies active in cross-border affairs ; • Cooperating to improve passenger rail links between Québec and the U.S.; • Developping and deploying Intelligent transportation systems such as 511. • MTQ is actively involved in various groups and coalitions: • Eastern Border Transportation Coalition (EBTC); • Transportation Border Working Group (TBWG). • Continuous dialogue with local CBSA and CBP port of entry authorities for operations.

  9. Facts and observations • Post 9-11 context at the border seems to be assimilated by the industry. • Reduction of border delays: 35% reduction of truck traffic at Québec crossings between 2003-2012 • In 2011, a consultation with Quebec trucking industry showed that border delays and lack of harmonization between Canadian and U.S. programs remain major preoccupations. • Most of border related initiatives in 2013 are linked with Beyond the Border Action Plan and implemented by federal agencies. • All stakeholders understand the need for greater coordination in border issues

  10. Beyond the Border: Perimeter Security and Economic Competitiveness action plan • 32 measures under the responsibility of Canadian and U.S. agencies but implementation may require provincial involvement in some cases. • MTQ strongly supports most of the measures related to transportation at the border: • Implementation of pre-clerance initiative for rail, land and marine modes of transport; • Increased benefits in trusted travelers and traders programs (NEXUS & FAST); • Greater harmonisation between Canadian and U.S. inspection and customs procedures; • Increased coordination for infrastructure development and maintenance at the border, including investments at key crossings and small and remote ports.

  11. 1- Canada-U.S  Border Investment Plan (BIIP) • First released in May 2013 and covers major ports of entry (7). • MTQ’s interests: • Increased coordination between customs projects and road infrastructure projects; • Status of investments for major Ports at the Québec Border: • U.S. CBP facility at Derby Line, Vt (I-91); • CBSA facility at Saint-Bernard-de-Lacolle (A-15). • Status of small and remote ports of entry.

  12. 2- Implementation of Border wait time measurement systems at high priority crossings • Impacts for MTQ: • Three crossings located in Québec; • MTQ’s operate ITS (variable messages signs) to send messages at the border; • Border delays identified as a top priority by the Quebec trucking industry; • Reliable and consistent wait time data is usefull information in order to support the industry and for road network management.

  13. 3- Integrated Cargo security Strategy – Port of Montréal Pilot • Inspection of marine containers arriving at the Port of Montréal destined for the U.S. by trucks. • MTQ’s interest: • Reduction of number and probability of inspection at the border: « cleared once, accepted twice » concept; • Impact for the trucking industry and targeted carriers; • End of pilot: November 1st 2013, looking foward to recommendations and the next steps.

  14. Priorities and next steps • MTQ activities: • Infrastructures: • International Sutton/East Richford bridge with Vermont; • A-35 project. • Partnerships: • Maintain involvement with EBTC, TBWG and other relevant groups; • Continuous consultation with industry to provide appropriate support and help compliance: CBSA e-manifest • Remain available for collaboration with federal agencies for measures related to transportation at the border: preclearance, wait time measurements, etc

  15. Québec-US Passenger Rail Links • Passenger Rail Services: • Montréal-New York City = Adirondack; • Montréal-St. Albans, VT-New York City-Washington = Vermonter in up to 3 years. • 2010: CBSA – Customs House used to clear the Adirondack doesn’t meet new standards = $$ needed for new building to be paid by Amtrak; • Montréal Central Station U.S. and Canadian Preclearance Project identified by stakeholders as the most likely way in the short term to improve QC-U.S. passenger rail links.

  16. Québec-US Passenger Rail Links • Preclearance for passenger rail concept included in Canada-U.S. negotiations on Perimeter Security and Economic Competitiveness. • Dec. 2011 - Announcement by Canadian PM and US President of an Action Plan, including preclearance for passenger rail (and a project in Vancouver BC’s Pacific Central Station) to be negotiated (a treaty) in a space of a year. • Extension of negotiations – Should end positively at the end of 2013/beginning of 2014.

  17. Québec-US Passenger Rail Links • Meanwhile… • Amtrak, (+stakeholders), is preparing a Business Case for Montréal Central Station Preclearance Project to be presented to authorities. Will includes estimates of touristic impacts of increase ridership. • AMT, as a representative of Amtrak, is managing a study done by a Quebec architectural firm, to validate Amtrak’s plans of Customs Preclearance facilities in Montréal (and their $$) – End: Fall 2013. • MTQ is managing a study done by HMM to update data on CN and CP lines between Montréal and the US border (towards NYC and Boston) and evaluate $$ to raise speeds on those lines up to 160 km/h (100 mi/h) – End: Fall 2013. • VT and MA are managing a 2nd study on the Boston to Montréal Corridor (Inland et Knowledge Corridors). Participation of QC should be on sharing some data from HMM study.

  18. Thank you! • Ministère des Transports du Québec • Serge Routhier • Direction du transport maritime, aérien et ferroviaire • Serge.routhier@mtq.gouv.qc.ca • Dave Henry • Direction du transport routier des marchandises • Dave.henry@mtq.gouv.qc.ca